Often, excavations of natural slopes are necessary in the site area for the construction of civil or industrial objectives. The execution of such works requires special attention, from the design phase, regarding the stability of the slope in the initial state, but also after excavation and identification, if necessary, of technical solutions to increase the stability reserve, thus ensuring the security during the execution of works but also of future constructions. Such a situation was encountered in the case of Anina Wastewater Treatment Plant (WWTP), when, in the absence of proper investigations of the slope to be excavated, there was a landslide that interrupted the site activities, and which, to some extent, jeopardized the objectives already built. In this context, at the level of 2015, slope stabilization works were designed and executed, works that proved to be insufficient. In 2021, it was necessary to conduct a new stability study in order to analyze the possibilities of continuing the construction of the treatment plant. This paper presents the results obtained during this study, as well as a series of conclusions and interpretations, regarding the technical condition of the slope in different hypotheses.

DOI: https://doi.org/10.2478/minrv-2021-0030 | Journal eISSN: 2247-8590 | Journal ISSN: 1220-2053
Language: English
Page range: 7 - 18
Published on: Jan 1, 2022
Published by: University of Petrosani
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2022 Florin Faur, Maria Lazăr, Ciprian Danciu, Izabela-Maria Apostu, published by University of Petrosani