A Possible Tunnels Execution Technology on Subsection E2 of the Highway A1
By: Ileana Pascu and Mircea Georgescu
Abstract
The paper aims to establish the design elements of the tunnels to be executed on subsection E2 of the Lugoj-Deva highway section, an integral part of the A1 highway. From the multitude of problems related to the execution of a tunnel, the paper investigates the following aspects: geotechnical investigations of the areas to be crossed by tunnels, analysis of tunnel stability, static checks of the final support/lining and, finally, a possible technology for their execution.
Language: English
Page range: 45 - 63
Published on: Oct 11, 2021
Published by: University of Petrosani
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year
Related subjects:
© 2021 Ileana Pascu, Mircea Georgescu, published by University of Petrosani
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.