References
- Said, H. & El-Rayes, K. (2010). Optimizing Material Procurement and Storage on Construction Sites. Journal of Construction Engineering and Management 137(6), 421-431. DOI: 10.1061/(ASCE)CO.1943-7862.0000307.
- Zubair, M., Maqsood, S., Omair, M., Omair, M. & Noor, I. (2019). Optimization of Material Handling System through Material Handling Equipment Selection. International Journal of Progressive Sciences and Technologies 15(2), 235-243.
- Leung, C.S.K. & Lau, H.Y.K. (2018). A hybrid multi-objective AIS-based algorithm applied to simulation-based optimization of material handling system. Applied Soft Computing 1, 553-567. DOI: 10.1016/J.ASOC.2018.07.034.
- Carli, R., Dotoli, M., Digiesi, S., Facchini, F. & Mossa, G. (2020). Sustainable Scheduling of Material Handling Activities in Labor-Intensive Warehouses: A Decision and Control Model. Sustainability 12(8), 3111. DOI: 10.3390/SU12083111.
- Hsu, H.P., Wang, C.N., Thanh Tam Nguyen, T., Dang, T.T. & Pan, Y.J. (2024). Hybridizing WOA with PSO for coordinating material handling equipment in an automated container terminal considering energy consumption. Advanced Engineering Informatics 60, 102410. DOI: 10.1016/J.AEI.2024.102410.
- Ioannou, G. & Kritikos, M.N. (2004). Optimization of material handling in production and warehousing facilities. Operational Research 4(3), 317-331. DOI: 10.1007/BF02944149.
- Đelović, D. (2024). A Regression Model of Dry Bulk Carriers’ Loading Time. LOGI - Scientific Journal on Transport and Logistics 15(1), 49-60. DOI: 10.2478/logi-2024-0005.
- Yan, P., Liu, S.Q., Sun, T. & Ma, K. (2018). A dynamic scheduling approach for optimizing the material handling operations in a robotic cell. Computers & Operations Research 99, 166-177. DOI: 10.1016/J.COR.2018.05.009.
- Zhou, B. & He, Z. (2020). A material handling scheduling method for mixed-model automotive assembly lines based on an improved static kitting strategy. Computers & Industrial Engineering 140, 106268. DOI: 10.1016/J.CIE.2020.106268.
- Jeon, S.M. & Kim, G. (2016). A survey of simulation modeling techniques in production planning and control (PPC). Production Planning and Control 27(5), 360-377. DOI: 10.1080/09537287.2015.1128010.
- Vieira, M., Moniz, S., Gonçalves, B.S., Pinto-Varela, T., Barbosa-Póvoa, A.P. & Neto, P. (2022). A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human-robot collaborative assembly line. International Journal of Production Research 60(9), 2942-2962. DOI: 10.1080/00207543.2021.1906461.
- Saavedra Sueldo, C., Perez Colo, I., De Paula, M., Villar, S.A. & Acosta, G.G. (2024). Simulation-based metaheuristic optimization algorithm for material handling. Journal of Intelligent Manufacturing, 1-21. DOI: 10.1007/S10845-024-02327-0/TABLES/14.
- Smagowicz, J., Szwed, C. & Berlec, T. (2024). An Assortment-Quantity Optimization Problem in Printing Industry Using Simulation Modelling. Sustainability 16(4), 1693. DOI: 10.3390/SU16041693.
- Straka, M., Spirkova, S. & Filla, M. (2021). Improved Efficiency of Manufacturing Logistics by Using Computer Simulation. Int j Simul Model 20(3), 501-512. DOI: 10.2507/IJSIMM20-3-567.
- Kuncova, M. & Zajoncova, M. (2018). Discrete event simulation usage to model and optimize the production line. MM Science Journal 2018, 2325-2332. DOI: 10.17973/MMSJ.2018_03_2017117.
- Pekarcikova, M., Trebuna, P., Dic, M. & Markovic, J. (2023). Streamlining logistics flows with lean tools using TX Plant Simulation software support. Acta Logistica 10(4), 637-644. DOI: 10.22306/al.v10i4.442.
- Malega, P., Gazda, V. & Rudy, V. (2021). Optimization of production system in plant simulation. Simulation 98(4), 295-306. DOI: 10.1177/00375497211038908.
- Bambura, R., Sujová, E. & Čierna, H. (2020). Utilizing Computer Simulation to Optimize Furniture Production System. BioResources 15(3), 6752-6765.
- Istokovic, D., Perinic, M., Vlatkovic, M. & Brezocnik, M. (2020). Minimizing total production cost in a hybrid flow shop: A simulation-optimization approach. Int j Simul Model 19(4), 559-570. DOI: 10.2507/IJSIMM19-4-525.
- Tóth, G. (2022). Optimization of material flow in a production company using simulation in Tecnomatix. Diploma thesis, Technical University of Košice, Košice, Slovakia.
- CAT 926M. (2022). Retrieved November 15, 2024, from https://lnk.sk/bgul