Have a personal or library account? Click to login
Anchorage length of patented wire cables in prestressed bridge girders Cover

Anchorage length of patented wire cables in prestressed bridge girders

Open Access
|Dec 2021

References

  1. 1. Konštrukce cestných a diaľničných mostov z prefabrikátov I-73 dĺžky 21-30 m, Typový podklad, Dopravoprojekt, Bratislava 1973.
  2. 2. EN 1992-1-1 Eurocode 2: Design of concrete structures – Part 1-1: General rules and rules for buildings, European Committee for Standardization, Brussels 2004.
DOI: https://doi.org/10.2478/kom-2021-0012 | Journal eISSN: 1804-1213 | Journal ISSN: 0452-599X
Language: English
Page range: 92 - 96
Published on: Dec 30, 2021
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 A. Svoboda, L. Klusáček, R. Nečas, J. Koláček, J. Strnad, M. Olšák, published by Association of Czech and Slovak Corrosion Engineers
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.