Skip to main content
Have a personal or library account? Click to login
ERP Systems and Cost Control in the Construction Industry: A Conceptual Analysis of Material Flow Management Cover

ERP Systems and Cost Control in the Construction Industry: A Conceptual Analysis of Material Flow Management

Open Access
|Sep 2026

References

  1. Ansari, S. L., & Bell, J. (1997). Target costing: The next frontier in strategic cost management. Irwin Professional Publishing.
  2. Arantes, A., Ferreira, L. M. D., & Costa, A. A. (2015). Is the construction industry aware of supply chain management? The Portuguese contractors’ perspective. Supply Chain Management: An International Journal, 20(4), 404–414. https://doi.org/10.1108/SCM-06-2014-0207.
  3. Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127.
  4. Ballard, G., & Howell, G. (2003). Lean project management. Building Research & Information, 31(2), 119–133. https://doi.org/10.1080/09613210301997.
  5. Ballou, R. H. (2006). Business logistics/supply chain management. Pearson Education.
  6. Bardin, L. (2011). Análise de conteúdo (Edição revista e ampliada). Edições 70.
  7. Brandín, R., & Abrishami, S. (2024). IoT-BIM and blockchain integration for enhanced data traceability in offsite manufacturing. Automation in Construction, 159, 105266. https://doi.org/10.1016/j.autcon.2024.105266.
  8. Bryman, A. (2016). Social research methods (5th ed.). Oxford University Press.
  9. Carenzo, P., & Turolla, S. (2010). The diffusion of management accounting systems in manufacturing companies: An empirical analysis of Italian firms. In: M.J. Epstein, J.-F. Manzoni, & A. Davila (Eds.), Performance Measurement and Management Control: Innovative Concepts and Practices (pp. 457–499). Emerald Group Publishing Limited. https://doi.org/10.1108/S1479-3512(2010)0000020019.
  10. Carr, C., & Ng, J. (1995). Total cost control: Nissan and its U.K. supplier partnerships. Management Accounting Research, 6(4), 347–365. https://doi.org/10.1006/mare.1995.1025.
  11. Chowdhury, M. A. I. (2025). Investigating green supply chain management (GSCM) practices in construction: The case of the Bangladesh construction industry (Doctoral dissertation, Cardiff Metropolitan University). https://doi.org/10.25401/cardiffmet.31116937.
  12. Cooper, R., & Slagmulder, R. (1999). Developing profitable new products with target costing. MIT Sloan Management Review, 40(4), 23–33.
  13. Costin, A. M., Teizer, J., & Schoner, B. (2015). RFID and BIM-enabled worker location tracking to support real-time building protocol and data visualization. Journal of Information Technology in Construction (ITcon), 20, 495–517.
  14. Creswell, J. W., & Poth, C. N. (2018). Qualitative inquiry and research design: Choosing among five approaches (4th ed.). SAGE Publications.
  15. Drury, C. (2006). Management and cost accounting (7th ed.). Cengage Learning.
  16. Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors (2nd ed.). John Wiley & Sons.
  17. Ellram, L. M. (2006). The implementation of target costing in the United States: Theory versus practice. Journal of Supply Chain Management, 42(1), 13–26. https://doi.org/10.1111/j.1745-493X.2006.04201003.x.
  18. Ferreira, F. M. C. C. D. (2021). Development of an inventory management policy at Wurth Portugal (Master’s thesis). Iscte – Instituto Universitário de Lisboa. Repositório do Iscte. http://hdl.handle.net/10071/24779.
  19. Flamholtz, E. (2001). Corporate culture and the bottom line. European Management Journal, 19(3), 268–275. https://doi.org/10.1016/S0263-2373(01)00023-8.
  20. Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002). Material waste in building industry: Main causes and prevention. Journal of Construction Engineering and Management, 128(4), 316–325. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316).
  21. Gramsci, A., & Sader, E. (1990). Gramsci sobre poder, política e partido. Brasiliense.
  22. Haddara, M., & Elragal, A. (2015). The readiness of ERP systems for the factory of the future. Procedia Computer Science, 64, 721–728. https://doi.org/10.1016/j.procs.2015.08.598.
  23. Hofstede, G. (2001). Culture’s consequences: Comparing values, behaviors, institutions and organizations across nations (2nd ed.). Sage Publications.
  24. Jabareen, Y. (2009). Building a conceptual framework: Philosophy, definitions, and procedure. International Journal of Qualitative Methods, 8(4), 49–62. https://doi.org/10.1177/160940690900800406.
  25. Johnston, J. E. (2016). Site control of materials: Handling, storage and protection. Elsevier.
  26. Kent, D. C., & Becerik ‑Gerber, B. (2019). Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), 815–825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188.
  27. Li, X., Yi, W., Chi, H. L., Wang, X., & Chan, A. P. C. (2018). A critical review of virtual and augmented reality (VR/AR) applications in construction safety. Automation in Construction, 86, 150–162. https://doi.org/10.1016/j.autcon.2017.11.003
  28. Luz, I. P., Maier, S. M., & Lavarda, C. E. F. (2020). Fatores de aceitação de um sistema ERP na construção civil: Um estudo de caso a partir dos pressupostos do Modelo de Aceitação de Tecnologia. Revista de Administração, Contabilidade e Economia da Fundace, 11(3), 83–98.
  29. Mouritsen, J., Hansen, A., & Hansen, C. (2001). Inter-organizational controls and organizational competencies: Episodes around target cost management/functional analysis and open book accounting. Management Accounting Research, 12(2), 221–244. https://doi.org/10.1006/mare.2001.0160.
  30. Needle, D. (2010). Business in context: An introduction to business and its environment. Cengage Learning EMEA.
  31. Papadonikolaki, E., & Wamelink, H. (2017). Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(6), 649–664. https://doi.org/10.1080/09613218.2017.1301718.
  32. Perčević, H., Hladika, M., & Mićin, M. (2015). Integrated application of target costing and life cycle costing in contemporary business environment. International Journal Vallis Aurea, 1(1), 107–118. https://doi.org/10.2507/IJVA.1.1.10.10.
  33. Poon, C. S., Yu, A. T., & Jaillon, L. (2004). Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(5), 461–470. https://doi.org/10.1080/0144619042000202816.
  34. Qiao, P. (2023). The application of BIM and RFID technology in building engineering informatization based on IPD mode. Journal of Civil Engineering and Urban Planning, 5(9), 1–9. https://dx.doi.org/10.23977/jceup.2023.050901.
  35. Rother, M., & Shook, J. (2003). Learning to see: Value stream mapping to add value and eliminate muda. Lean Enterprise Institute.
  36. Siagian, H., Tarigan, Z. J. H., & Jie, F. (2021). Supply chain integration enables resilience, flexibility, and innovation to improve business performance in COVID-19 era. Sustainability, 13(9), 4669. https://doi.org/10.3390/su13094669.
  37. Slack, N., Chambers, S., & Johnston, R. (2015). Operations management. Pearson Education.
  38. Talha, M., & Raja, J. B. (2010). Role of supply chain management in target costing. Journal of Modern Accounting and Auditing, 6(7), 46–57.
  39. Yasukata, K., Yoshida, E., Yamada, I., & Oura, K. (2013). A longitudinal case study of target cost management implementation at a shipbuilding company. Journal of Accounting & Organizational Change, 9(4), 448–470. https://doi.org/10.1108/JAOC-09-2010-0044.
  40. Yin, R. K. (2015). Case study research: Design and methods (5th ed.). SAGE Publications.
  41. Zago, C. C. (2000). Modelo de arquitetura da cultura organizacional: As dimensões da cultura organizacional suportadas pela sua inter ‑relação com as variáveis do comportamento. Universidade Federal de Santa Catarina.
  42. Zakariyyah, K. I., John, I. B., & Ijaola, I. A. (2021). Cultural orientations and strategic capability for the adoption of building information modeling in construction firms. Engineering Reports, 3(11), e12417. https://doi.org/10.1002/eng2.12417.
DOI: https://doi.org/10.2478/joim-2026-0008 | Journal eISSN: 2543-831X (formerly 2080-0150) | Journal ISSN: 2080-0150
Language: English
Page range: 91 - 108
Published on: Sep 9, 2026
Published by: SAN University
In partnership with: Paradigm Publishing Services
JEL:

© 2026 Luísa Alexandra Antunes Ferreira, Cidália Pereira de Oliveira, Rui Silva, Francisco Carreira, Margarida Rodrigues, published by SAN University
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.