Have a personal or library account? Click to login
The impact of the construction of the new 400 kV transmission power lines between Slovakia and Hungary on the cross-border transmissions Cover

The impact of the construction of the new 400 kV transmission power lines between Slovakia and Hungary on the cross-border transmissions

Open Access
|Nov 2019

References

  1. [1] SEPSČEPS, MAVIR, PSE, Unplanned flows in the CEE region, the case study, 2013.
  2. [2] Available on internet [online 28.6.2019]:.
  3. [3] https://www.pse.pl/documents/20182/51490/Unplanned_flows_in_the_CEE_region/.pdf/44c6534e-a30d-4f06-9f7e-cb941b0ccf40.
  4. [4] SEPS a.s. Ten-year network development plan for the period 2018-2027, 2019.
  5. [5] Available on internet [online 28.6.2019].
  6. [6] https://www.sepsas.sk/Dokumenty/ProgRozvoj/2018/08/DPR_PS_2018_2027_en,pdf.
  7. [7] SEPS a.s. SEPS Development program for the period 2019-2028, internal unpublished SEPS company document, 2018.
  8. [8] Z. Blahutová, “The phenomenon of unplanned flows”, Journal Slovak power engineering (Slovenská energetika), vol. 37, pp. 4-5.
  9. [9] L. Pavlov, L. Skurcak, J. Chovanec, and J. Altus, “Impact of impedance unbalance on the e ciency of electricity transmission distribution”, Journal of Electrical Engineering.
  10. [10] L. Pavlov, L. Skurcak, J. Chovanec, and J. Altus, ] vol. 68 no. 6, pp. 492-495, 2017, DOI: 10, 1515/jee-2017-0086,, ISSN: 1335-3632.10.1515/jee-2017-0086
  11. [11] E. Dvorský, L. Raková, and P. Hejtmánková, “Grid frequency regulation by recycling electrical energy in flywheels”, Proceedings of the 9th International Scientific Symposium on Electrical Power Engineering (ELEKTROENERGETIKA 2017), Košice: Technical University of Košice 2017, pp. 159-164, ISBN: 978-80-553-3195-9.
  12. [12] Z. Martínek, T. Klor, and J. Holý, “The reliability operation of the complicated networks at the electrical system”, Proceedings of the 8th International Scientific Symposium on Electrical Power Engineering (ELEKTROENERGETIKA 2015), Košice: Technical University of Košice 2015, pp. 515-518, ISBN: 978-80-553-2187-5.
  13. [13] Project: Power Line 2x 400 kV Gabčíkovo (SK), Gönyű(HU)-Vel’ký Ďur (SK), Available on internet [online 28.6.2019]: http://www.mhsr.sk/energetika/medzinarodna-spolupraca/projekty-spolocneho-zaujmu-pci/elektroenergetika/3161-vedenie-2-x-400-kv-gabcikovo-sk-goenyu-hu-velky-dur-sk.
  14. [14] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű PROJECT: Power line 2x 400 kV Rimavská Sobota (SK)-Sajóivánka (HU).
  15. [15] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű, Available on internet [online 28.6.2019]: http://www.mhsr.sk/energetika/medzinarodna-spolupraca/projekty-spolocneho-zaujmu-pci/elektroenergetika/317-vedenie-2-x-400-kvrimavska-sobota-sk-sajoivanka-hu.
  16. [16] Project: Power Line 2x 400 Kv Gabčíkovo (sk) and Gönyű SEPS a.s. Dispatching instruction no. 2/6, Procedure for realization of reconfigurations in the TS SR, internal unpublished SEPS company document, 2017.
DOI: https://doi.org/10.2478/jee-2019-0075 | Journal eISSN: 1339-309X | Journal ISSN: 1335-3632
Language: English
Page range: 418 - 428
Submitted on: Jun 30, 2019
|
Published on: Nov 26, 2019
In partnership with: Paradigm Publishing Services
Publication frequency: 6 issues per year

© 2019 Marek Siranec, Alena Otcenasova, Peter Bracinik, published by Slovak University of Technology in Bratislava
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.