Figure 1.

Statistics on the number of publications by research institutions.
Statistics on the number of publications by research institutions.

Figure 2.

Knowledge flow network construction.
Knowledge flow network construction.

Figure 3.

Part of the Institutional field knowledge Flow network in 2013.
Part of the Institutional field knowledge Flow network in 2013.

Figure 4.

Evolution features of nodes and edges in institutional field knowledge flow network.
Evolution features of nodes and edges in institutional field knowledge flow network.

Figure 5.

IKM model algorithm flow chart.
IKM model algorithm flow chart.

Figure 6.

Comparison of the rank of total publication, total citations and PageRank value between actual and simulated networks.
Comparison of the rank of total publication, total citations and PageRank value between actual and simulated networks.

Figure 7.

Comparison of total publication in the simulated networks and the actual network.
Comparison of total publication in the simulated networks and the actual network.

Figure 8.

Evolution of correlation coefficient from 1994 to 2013.
Evolution of correlation coefficient from 1994 to 2013.

KS test results of total publication between simulated networks and actual network

Type of simulated network modelDPH0
IKM model0.0160.142acceptance
BA model0.3482.972×10-309rejection
DMS model0.0210.013rejection
DOI: https://doi.org/10.2478/jdis-2024-0009 | Journal eISSN: 2543-683X | Journal ISSN: 2096-157X
Language: English
Page range: 101 - 123
Submitted on: Dec 12, 2023
Accepted on: Jan 23, 2024
Published on: Feb 6, 2024
Published by: Chinese Academy of Sciences, National Science Library
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2024 Jinzhong Guo, Kai Wang, Xueqin Liao, Xiaoling Liu, published by Chinese Academy of Sciences, National Science Library
This work is licensed under the Creative Commons Attribution 4.0 License.