Have a personal or library account? Click to login
Exploring Factors Influencing of Project Management Success in Public Building Projects in Nigeria Cover

Exploring Factors Influencing of Project Management Success in Public Building Projects in Nigeria

Open Access
|May 2018

References

  1. [1] Zwikael, O., Bar-Yoseph, B. Improving the capabilities of project team management using the Gestalt cycle of experience. Team Performance Management, 10 (2004) No7. 137-144.10.1108/13527590410569850
  2. [2] Winter, M., Smith, C., Morris, P.W.G., Cicmil, S. Directions for future research in project management: the main findings of a UK government funded (EPSRC) research network. International Journal of Project Management. 24 (2006). No.8, 638-649.10.1016/j.ijproman.2006.08.009
  3. [3] Thomas, J. Problematizing project management. In D. Hodgson & S. Cicmil (Eds.), Making projects critical (2006). pp. 90-107. Hampshire: Palgrave.10.1007/978-0-230-20929-9_5
  4. [4] Geraldi, J., Maylor, H., Williams, T.. Now, let’s make it really complex (complicated): A systematic review of the complexities of projects. International Journal of Operations and Production Management, 31 (2011) No 9, 966-990.10.1108/01443571111165848
  5. [5] McHugh, O., Hogan, M. Investigating the rationale for adopting an internationally-recognised project management methodology in Ireland. International Journal of Project Management (2011), p. 2910.1016/j.ijproman.2010.05.001
  6. [6] Clancy, T. The Standish Group Report, 1995. http://www.projectsmart.co.uk/reports.html Chaos report.
  7. [7] Attarzadeh, I., Siew, H.O. Project Management practices. Success versus failure. International Symposium on Information Technology, 2008. ITSim 2008. Volume1: 1-8.10.1109/ITSIM.2008.4631634
  8. [8] Standish Group International. Chaos Summary 2009: the 10 laws of Chaos, International Standish Group., 2009. Pp 1-4. http://ptslideshare.net/AccelerateManagement/chaos-summary-2009-the-standardish-group [Accessed:9th December 2012]
  9. [9] Akuta, C. V. Inconsistent Policies and High Rate of abandoned government projects. 2009.Nigeria News. http://www.ngex.com/news/public/article.php?ArticleID=1343
  10. [10] Ayodele, E.O., Alabi, O. M. Abandonment of Construction Projects in Nigeria: Causes and Effects; Journal ofEmerging Trends in Economics and Management Sciences (JETEMS), Vol. 2, 2011.Iss. 2, pp. 142-145.
  11. [11] El-Rufai, N.A. The tragedy of abandoned projects. Nigeria Intel. 2012. http://www.nigeriaintel.com
  12. [12] Abbasi, Y. G., Al-Mharmah. ‘Project management practice by the public sector in a developing country’ International Journal of Project Management, 18 (2000). No3, pp105-109.10.1016/S0263-7863(98)00074-X
  13. [13] Poon, J., Potts, K., Cooper, P. Identification of Success Factors in the Construction Process. A Conference Paper Delivered at COBRA (2001) Cutting Edge and ROOTS Conference.
  14. [14] White, D., Fortune, J. ‘Current practice in project management - an empirical study’ International Journal of Project Management, 20 (2002) No.6, pp.1-11.10.1016/S0263-7863(00)00029-6
  15. [15] Baccarini, D., Collins, A. Critical Success Factors for Projects, In Brown, A. (ed), Surfing the Waves: Management Challenges; Management Solutions. Proceedings of the 17th ANZAM Conference, (2003) .2-5 December, Fremantle, Western Australia.
  16. [16] Arnaboldi M., Azzone G., Savoldelli A ‘managing public sector project: the case of the Italian Treasury Ministry’ International Journal of Project management, 22.(2004). No.3, pp213-223.10.1016/S0263-7863(03)00067-X
  17. [17] Saqib, M., Farooqui, R.U., Lodi, S.H. Assessment of Critical Success Factors for Construction Projects in Pakistan. First International Conference on Construction in Developing Countries (ICCIDC-1)”Advancing and Integrating Construction Education, Research and Practice, ., 2008 Karachi, Pakistan, 392-404.
  18. [18] Idoro, G. I., Patunola-Ajayi, J. B. ‘Evaluating the strategies for marketing project management system in the Nigerian construction industry’, Nordic Journal of Surveying and Real Estate Research, 6 (2009). No.2, pp.25-36.
  19. [19] Ogwueleka, A. The Critical Success Factors Influencing Project Performance in Nigeria. International Journal of Management Science and Engineering Management, 6. (2011) No.5, 343-349.10.1080/17509653.2011.10671182
  20. [20] Omran, A., Abdulbagei, M.A., and Gebril, A.O. An Evaluation of the Critical Success Factors for Construction Projects in Libya”. International Journal of Economic Behaviour, 2, (2012)pp 17-25.
  21. [21] Yong, Y.E., Mustaffa, N.E. Analysis of Factors Critical to Construction Project Success in Malaysia. Engineering, Construction and Architectural Management, 19. (2012) No. 5, 1-13.10.1108/09699981211259612
  22. [22] Ejaz, N., Hussain, J., Shabbir, F., Shamim, M.A., Naeem , U.A., Tahir, M.F. Assessment of Most Critical Success Factors for Mega Construction Projects in Pakistan. Life Science Journal, 10. (2013) No. 10, 255-261.
  23. [23] Luthans, F., Davis, T.R.V. ‘An Idiographic Approach to Organizational Behavior research:The Use of Single Case Experimental Designs and Direct Measures’, Academy of Management Review, JSTOR, 1982 http://www.jstor.org.ezproxy.liv.ac.uk/stable/pdfplus/257330.pdf10.2307/257330
  24. [24] Sarantakos, S. Social Research, Palgrave. New York. 1988.
  25. 25] Leedy P.D. Practical research. New York: Macmillan Publishing. 1980
  26. [26] Hasan, M. Kerr, R.M.”The relationship between total quality management practices and organisational performance in service organisations”. The TQM Magazine, Vol.15. (2003) Number 4. Pp 286-291.10.1108/09544780310486191
  27. [27] Shuttleworth, M. Construct Validity - Does the Concept Match the Specific Measurement? 2009. Explorable. com: https://explorable.com/construct-validity
  28. [28] Nunnally, J.C. Psychometric Theory. 2nd Edition, McGraw-Hill, New York., 1978.
  29. [29] Idrus, A., Sodangi, M. Framework for Evaluating Quality Performance of Contractors in Nigeria. International Journal of Civil and Environmental Engineering, 10. (2010) No. 01:34-39.
  30. [30] Ibrahim, A. D. Investigating Into the Knowledge Requirements of Nigerian Quantity Surveyors to Meet FutureChallenges. 25th Biennial Conference of The NIQS, 2011 pp. 7-18. Abuja: NIQS.
  31. [31] Bave las, A. “Project echo: Use of projective techniques to define reality in different cultures”, Stanford University. 1968
  32. [32] Emuze, F. A. Performance Improvement in South African Construction. South Africa: PhD Thesis NMMU. 2011
  33. [33] Usman, N. A., Inuwa, I. I., Iro, A. I., Dantong, J. S. Training of Contractors Craftsmen for Productivity Improvement in the Nigerian Construction Industry. Journal of Engineering and Applied Sciences, 4, (2012) 1-12.
  34. [34] Iro, A. I., Inuwa, I. I., Dantong, J. S. Investigation into Contractors Craftsmen Training in the Nigerian Construction Industry. International Journal of Engineering Research and Technology, 2 (2013) No1 pp1-6.
  35. [35] Moser, C.A., Kalton, G. Survey methods in social investigation. UK: Heinemann Educational 1971.
  36. [36] Field, A. Discovering Statistics, Using SPSS for Windows. Sage Publications, London., 2005.10.53841/bpspag.2005.1.56.31
  37. [37] Kaiser, H. A second generation Little Jiffy. Psychometrikal, 35, (1970) 401-15.10.1007/BF02291817
  38. [38] Bartlett, M.S. A note on the multiplying factors for various chi square approximations. Journal of the Royal Statistical Society, 16 (1954) (Series B), 296-8.10.1111/j.2517-6161.1954.tb00174.x
  39. [39] Stevens, J. Applied multivariate statistics for the social sciences 5th edition. New York (N. Y.): Routledge. 2009
  40. [40] Tabachnick, B.G., Fidell, L.S. Using Multivariate Statistics (5th Edn). Boston: Pearson Education. 2007
  41. [41] Catell, R.B The Scree Test for Number Of Factors. Multivariate Behavioural Research, 1, , (1966) pp.245-7610.1207/s15327906mbr0102_10
  42. [42] Horn, J. L. A rationale and test for the number of factors in factor analysis. Psychometrika, 30, (1965) 179-8510.1007/BF02289447
  43. [43] Hubbard, R., Allen, S.J An empirical comparison of alternative methods for principal component extraction. Journal Of Business Research, 15, (1987). 173-90.10.1016/0148-2963(84)90047-X
  44. [44] Zwick, W.R., Velicer, W.F., Comparison of five rules for determining the number of components to retain. Psychological Bulleting, 99, (1986).432-4210.1037/0033-2909.99.3.432
  45. [45] Abubakar, A. E., Grennwood, D., Osborne, A. A Study of Project Planning on Libyan Construction Projects. ARCOM Conference ., 2008 (pp. 789-798). Cardiff UK: Dainty, A. (Ed) Proceedings of the 24th Annual ARCOM Conference, 1-3 september, 2008.
  46. [46] Krishnamurthy, K. G., Ravindra, S. V. Construction and Project Management: For Engineers, Planners and Builders. New Delhi: Satish Kumar J.2010.
  47. [47] Chitkara, K. K., 2012. Construction Project Management: Planning, Scheduling & Controlling. New Delhi: Tata McGraw-Hill.
  48. [48] Mbamali, I., Okotie, A. J. An Assessment of the Threats and Opportunities of Globalization on Building Practice in Nigeria. American International Journal of Contemporary Research, vol. 4 (2012) 143-150.
  49. [49] Muazu, D. A., Bustani, S. A. A Comparative Analysis of Litigation Among Foreign and Indigenous Construction Firms in Nigeria. ATBU Journal of Environmental Technology, 3. (2004) No1: pp13-16.
  50. [50] Aniekwu, A. N., Audu, H. O. The Effects of Management on Productivity: A Comparative Study of Indigenous and Foreign Firms in the Nigerian Construction Industry. Proceedings of West Africa Built Environment (WABER) Conference, 2010 (pp. 567-578). Accra-Ghana: WABER.
  51. [51] Ekundayo, D., Jewell, C., Awodele, O. A. Executive Project Management Structure and the Challenges Facing its Adoption in the Nigerian Construction. International Journal of Architecture, Engineering and Construction. Vol.2. (2013) No.3 pp.158-169.10.7492/IJAEC.2013.015
DOI: https://doi.org/10.2478/jbe-2018-0004 | Journal eISSN: 2064-2520 | Journal ISSN: 2063-997X
Language: English
Page range: 47 - 62
Published on: May 30, 2018
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2018 O.K. Akande, R.E. Olagunju, S.C. Aremu, E.A. Ogundepo, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.