References
- Tiong, Kah Yong, Zhenliang Ma, and Carl-William Palmqvist. “A review of data-driven approaches to predict train delays.” Transportation Research Part C: Emerging Technologies 148 (2023): 104027. https://doi.org/10.1016/j.trc.2023.104027.
- Rahim, Nur Syafika Artika, Syuhaida Ismail, Chitdrakantan Subramaniam, Siti Nora Haryati Abdullah Habib, and Serdar Durdyev. “Building information modelling strategies in sustainable housing construction projects in Malaysia.” Sustainability 15, no. 3 (2023): 2313. https://doi.org/10.3390/su15032313.
- Shash, Ali A., and Fahad M. AbuAlnaja. “Causes of material delays in capital projects in Saudi Arabia.” International Journal of Construction Management 23, no. 7 (2023): 1109-1117. https://doi.org/10.1080/15623599.2021.1956294.
- Arabiat, Ahmad, Hamza Al-Bdour, and Majdi Bisharah. “Predicting the construction projects time and cost overruns using K-nearest neighbor and artificial neural network: a case study from Jordan.” Asian Journal of Civil Engineering 24, no. 7 (2023): 2405-2414. https://doi.org/10.1007/s42107-023-00649-7.
- Ghanbari, M., D. Zolfaghari, and Z. Yadegari. “Mitigating construction delays in Iran: An empirical evaluation of building information modeling and integrated project delivery.” Journal of Engineering Management and Systems Engineering 2, no. 3 (2023): 170-179. https://doi.org/10.56578/jemse020304.
- Egwim, Christian Nnaemeka, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi, and Raphael Oseghale. “Extraction of underlying factors causing construction projects delay in Nigeria.” Journal of Engineering, Design and Technology 21, no. 5 (2023): 1323-1342. https://doi.org/10.1108/jedt-04-2021-0211.
- Sanni-Anibire, Muizz O., Rosli Mohamad Zin, and Sunday Olusanya Olatunji. “Causes of delay in the global construction industry: a meta analytical review.” International Journal of Construction Management 22, no. 8 (2022): 1395-1407. https://doi.org/10.1080/15623599.2020.1716132.
- Yap, Jeffrey Boon Hui, Pei Ling Goay, Yoke Bee Woon, and Martin Skitmore. “Revisiting critical delay factors for construction: Analysing projects in Malaysia.” Alexandria Engineering Journal 60, no. 1 (2021): 1717-1729. https://doi.org/10.1016/j.aej.2020.11.021.
- Gondia, Ahmed, Ahmad Siam, Wael El-Dakhakhni, and Ayman H. Nassar. “Machine learning algorithms for construction projects delay risk prediction.” Journal of Construction Engineering and Management 146, no. 1 (2020): 04019085. https://doi.org/10.1061/(asce)co.1943-7862.0001736.
- Abbasi, Omid, Esmatullah Noorzai, Kobra Gharouni Jafari, and Mahmood Golabchi. “Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran.” Journal of Architectural Engineering 26, no. 3 (2020): 05020008. https://doi.org/10.1061/(asce)ae.1943-5568.0000431.
- Viles, Elisabeth, Natalia Carolina Rudeli, and Adrian Santilli. “Causes of delay in construction projects: a quantitative analysis.” Engineering, Construction and Architectural Management 27, no. 4 (2020): 917-935. https://doi.org/10.1108/ecam-01-2019-0024.
- El-Sayegh, Sameh M., Solair Manjikian, Ahmed Ibrahim, Ahmed Abouelyousr, and Raed Jabbour. “Risk identification and assessment in sustainable construction projects in the UAE.” International Journal of Construction Management 21, no. 4 (2021): 327-336. https://doi.org/10.1080/15623599.2018.1536963.
- Okpala, Ifeanyi, Chukwuma Nnaji, and Ali A. Karakhan. “Utilizing emerging technologies for construction safety risk mitigation.” Practice Periodical on Structural Design and Construction 25, no. 2 (2020): 04020002. https://doi.org/10.1061/(asce)sc.1943-5576.0000468.
- Xun, Xiaolin, Jun Zhang, and Yongbo Yuan. “Multi-information fusion based on BIM and intuitionistic fuzzy DS evidence theory for safety risk assessment of undersea tunnel construction projects.” Buildings 12, no. 11 (2022): 1802. https://doi.org/10.3390/buildings12111802.
- Fashina, Adebayo Adeboye, Mustafe Abdillahi Omar, Ahmed Abdullahi Sheikh, and Funke Folasade Fakunle. “Exploring the significant factors that influence delays in construction projects in Hargeisa.” Heliyon 7, no. 4 (2021). https://doi.org/10.1016/j.heliyon.2021.e06826.
- Gündüz, Murat, Yasemin Nielsen, and Mustafa Özdemir. “Quantification of delay factors using the relative importance index method for construction projects in Turkey.” Journal of management in engineering 29, no. 2 (2013): 133-139. https://doi:10.1061/(asce)me.1943-5479.0000129.
- Sohu, Samiullah, Tahara Ramadzan Binti Md Kassim, and Omar Shahid Khan. “Critical Risk Factors influencing Time Schedule of Residential Projects in Pakistan.” Engineering, Technology & Applied Science Research 14, no. 1 (2024): 12636-12639. https://doi.org/10.48084/etasr.6528.
- Bhatti, Samiullah, Farhan Haider, and Umar Ali Siddiqui. “Construction Delays and Project Failures due to the Biological Pandemic of COVID-19 and Lockdown Effects.” Sir Syed University Research Journal of Engineering & Technology 12, no. 1 (2022): 64-69. https://doi.org/10.33317/ssurj.287.
- Gopang, Raja Khan Mohammed, Qadir Bux alias Imran, and Sasitharan Nagapan. “Assessment of delay factors in Saudi Arabia railway/metro construction projects.” International Journal of Sustainable Construction Engineering and Technology 11, no. 2 (2020): 225-233. https://doi.org/10.30880/ijscet.2020.11.02.028.
- Rahman, R. A., A. R. Radzi, M. S. H. Saad, and S. I. Doh. “Factors affecting the success of highway construction projects: the case of Malaysia.” In IOP Conference Series: Materials Science and Engineering, vol. 712, no. 1, p. 012030. IOP Publishing, 2020. https://doi.org/10.1088/1757-899x/712/1/012030.
- Koulinas, Georgios K., Alexandros S. Xanthopoulos, Thomas T. Tsilipiras, and Dimitrios E. Koulouriotis. “Schedule delay risk analysis in construction projects with a simulation-based expert system.” Buildings 10, no. 8 (2020): 134. https://doi.org/10.3390/buildings10080134.