Have a personal or library account? Click to login
Project Parameter Estimation on the Basis of an Erp Database Cover

Project Parameter Estimation on the Basis of an Erp Database

By: Marcin Relich  
Open Access
|Aug 2014

Abstract

Nowadays, more and more enterprises are using Enterprise Resource Planning (EPR) systems that can also be used to plan and control the development of new products. In order to obtain a project schedule, certain parameters (e.g. duration) have to be specified in an ERP system. These parameters can be defined by the employees according to their knowledge, or can be estimated on the basis of data from previously completed projects. This paper investigates using an ERP database to identify those variables that have a significant influence on the duration of a project phase. In the paper, a model of knowledge discovery from an ERP database is proposed. The presented method contains four stages of the knowledge discovery process such as data selection, data transformation, data mining and interpretation of patterns in the context of new product development. Among data mining techniques, a fuzzy neural system is chosen to seek relationships on the basis of data from completed projects stored in an ERP system.

DOI: https://doi.org/10.2478/fman-2014-0012 | Journal eISSN: 2300-5661 | Journal ISSN: 2080-7279
Language: English
Page range: 49 - 58
Published on: Aug 15, 2014
Published by: Warsaw University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2014 Marcin Relich, published by Warsaw University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.