Have a personal or library account? Click to login
An Effective Method to Evaluate the Scientific Research Projects Cover

An Effective Method to Evaluate the Scientific Research Projects

By: Xiaohui Hou,  Lei Huang and  Xuefei Li  
Open Access
|Sep 2014

References

  1. [1] Cao Z., Chai C., Application of fuzzy multilevel comprehensive evaluation method in assessment of scientific research subjects, Aeronautical Computer Technique, 37, 1, 2007, 51-53. (In Chinese)
  2. [2] Carlsson C., Fullér R., Majlender P., A fuzzy approach to R&D project selection, EUSFLAT Conference, 2005: 536-540.
  3. [3] Henriksen A.D., Traynor A. J., A practical R&D project-selection scoring tool, IEEE Transactions on Engineering Management, 46, 2, 1999: 158-170.10.1109/17.759144
  4. [4] Liberatore M. J., An extension of the analytic hierarchy process for industrial R&D project selection and resource allocation, IEEE Transactions on Engineering Management, 34, 1, 1987: 12-18.10.1109/TEM.1987.6498854
  5. [5] Lin H., Study on evaluation of scientific and technical projects with set pair analysis research, Science Technology and Engineering, 5, 19, 2005, 1365-1368. (In Chinese)
  6. [6] Lin H., Scientific research projects evaluation and selection based on the TOPSIS method, Science & Technology Progress and Policy, 23, 7, 2006, 47-49. (In Chinese)
  7. [7] Meade L. M., Presley A., R&D project selection using the analytic network process, IEEE Transactions on Engineering Management, 49, 1, 2002: 59-66.10.1109/17.985748
  8. [8] Mohanty R. P., Agarwal R., Choudhury A. K., Tiwari M.K., A fuzzy ANP-based approach to R&D project selection: a case study, International Journal of Production Research, 43, 24, 2005: 5199-5216.10.1080/00207540500219031
  9. [9] Pan J., Liu X., Study on evaluation index system and the fuzzy optimization model of science research projects, Science of Science and Management of S.& T., 25, 1, 2004, 9-11. (In Chinese)
  10. [10] Schmidt R. L., Freeland J. R., Recent progress in modeling R&D project-selection processes, IEEE Transactions on Engineering Management, 39, 2, 1992: 189-201.10.1109/17.141276
  11. [11] She C., Liang X., Evaluation on the scientific research project based on ENN, Forum on Science and Technology in China, 6, 2007, 107-109. (In Chinese)
  12. [12] Song Z., Wang Y., Scientific research projects evaluation based on weighted optimum order numbers, Electronic Design Engineering, 19, 24, 2011, 66-68. (In Chinese)
  13. [13] Wang Y., Song Z., Evaluation method of scientific research projects based on the FAHP method, Market Modernization, 21, 2008, 25-26. (In Chinese)
DOI: https://doi.org/10.2478/fcds-2014-0010 | Journal eISSN: 2300-3405 | Journal ISSN: 0867-6356
Language: English
Page range: 175 - 188
Published on: Sep 9, 2014
Published by: Poznan University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2014 Xiaohui Hou, Lei Huang, Xuefei Li, published by Poznan University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.