Have a personal or library account? Click to login

References

  1. Aksamija, A. (2016). Integrating innovation in architecture: Design, methods and technology for progressive practice and research. Wiley.
  2. Almeida, R., Teixeira, J. M., Mira da Silva, M., & Faroleiro, P. (2019). A conceptual model for enterprise risk management. Journal of Enterprise Information Management, 32(5), 843-868. doi: 10.1108/JEIM-05-2018-0097
  3. Balog-Way, D., McComas, K., & Besley, J. (2020). The Evolving Field of Risk Communication. Risk Analysis, 40(S1), 2240-2262. doi: 10.1111/risa.13615
  4. Bornschein, R., Schmidt, L., & Maier, E. (2020). The Effect of Consumers’ Perceived Power and Risk in Digital Information Privacy: The Example of Cookie Notices. Journal of Public Policy & Marketing, 39(2), 135-154. doi: 10.1177/0743915620902143
  5. Canadian Standards Association. (1997). CSA-Q850 Risk Management: Guidelines for Decision-Makers.
  6. Ceric, A. (2014). Minimizing Communication Risk in Construction: A Delphi Study of the Key Role of Project Managers. Journal of Civil Engineering and Management, 20(6), 829-838. doi: 10.3846/13923730.2013.802739
  7. Chodakowska, E. (2020). A Hybrid Approach in Future-Oriented Technology Assessment. In K. Arai, R. Bhatia, & S. Kapoor (Eds.), Proceedings of the Future Technologies Conference (FTC) 2019, Vol. 1069 (pp. 512-525). Springer International Publishing. doi: 10.1007/978-3-030-32520-6_38
  8. Covello, V. T. (1992). Risk Communication: An Emerging Area of Health Communication Research. Annals of the International Communication Association, 15(1), 359-373. doi: 10.1080/23808985.1992.11678816
  9. Davila Delgado, J. M., Oyedele, L., Ajayi, A., Akanbi, L., Akinade, O., Bilal, M., & Owolabi, H. (2019). Robotics and automated systems in construction: Understanding industry-specific challenges for adoption. Journal of Building Engineering, 26, 100868. doi: 10.1016/j.jobe.2019.100868
  10. Doyle, E. E. H., & Becker, J. S. (2022). Understanding the Risk Communication Puzzle for Natural Hazards and Disasters. In E. E. H. Doyle & J. S. Becker, Oxford Research Encyclopedia of Natural Hazard Science. Oxford University Press. doi: 10.1093/acre-fore/9780199389407.013.208
  11. Drożyner, P. (2020). Risk analysis in maintenance processes. Engineering Management in Production and Services, 12(4), 64-76. doi: 10.2478/emj-2020-0028
  12. Eriksson, P. E., & Westerberg, M. (2011). Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management, 29(2), 197-208. doi: 10.1016/j.ijproman.2010.01.003
  13. Freudenstein, F., Croft, R. J., Wiedemann, P. M., Verrender, A., Böhmert, C., & Loughran, S. P. (2020). Framing effects in risk communication messages – Hazard identification vs. Risk assessment. Environmental Research, 190, 109934. doi: 10.1016/j. envres.2020.109934
  14. Gentili, D., Bardin, A., Ros, E., Piovesan, C., Ramigni, M., Dalmanzio, M., Dettori, M., Filia, A., & Cinquetti, S. (2020). Impact of Communication Measures Implemented During a School Tuberculosis Outbreak on Risk Perception among Parents and School Staff, Italy, 2019. International Journal of Environmental Research and Public Health, 17(3), 911. doi: 10.3390/ ijerph17030911
  15. Ginevičius, R. (2020). Managerial decisions on the nature and scale of corporate activity diversification in the construction sector. Engineering Management in Production and Services, 12(3), 7-17. doi: 10.2478/ emj-2020-0015
  16. Howlett, M., Leong, C., & Sahu, S. (2022). Managing internal policy risk: Australia, the UK and the US compared. Policy Design and Practice, 5(2), 152-163. doi: 10.1080/25741292.2022.2065716
  17. International Organization for Standardization. (2018). ISO 31000:2018. Risk Management – Guidelines.
  18. Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), 165-194. doi: 10.1108/JEDT-03-2014-0012
  19. Kodym, O., Kubáč, L., & Kavka, L. (2020). Risks associated with Logistics 4.0 and their minimization using Blockchain. Open Engineering, 10(1), 74-85. doi: 10.1515/eng-2020-0017
  20. Liu, J., Li, B., Lin, B., & Nguyen, V. (2007). Key issues and challenges of risk management and insurance in China’s construction industry: An empirical study. Industrial Management & Data Systems, 107(3), 382-396. doi: 10.1108/02635570710734280
  21. Lucchese, M., & Pianta, M. (2020). The Coming Coronavirus Crisis: What Can We Learn? Intereconomics, 55(2), 98-104. doi.: 10.1007/s10272-020-0878-0
  22. Moorhead, M., Armitage, L., & Skitmore, M. (2022). Risk management processes used in determining project feasibility in the property development process early stages by Australia/New Zealand property developers. Journal of Property Investment & Finance, 40(6), 628-642. doi: 10.1108/JPIF-08-2021-0071
  23. Moraes, L. F. B., Rampasso, I. S., Anholon, R., Lima, G. B. A., Santa-Eulalia, L. A., Mosconi, E., & Yparraguirre, I. T. R. (2021). Assessing risk management in Brazilian social projects: A path towards sustainable development. International Journal of Sustainable Development & World Ecology, 28(5), 451-460. doi: 10.1080/13504509.2020.1867251
  24. Mulholland, B., & Christian, J. (1999). Risk Assessment in Construction Schedules. Journal of Construction Engineering and Management, 125(1), 8-15. doi: 10.1061/(ASCE)0733-9364(1999)125:1(8)
  25. Nazarko, J., & Chodakowska, E. (2017). Labour efficiency in construction industry in Europe based on frontier methods: Data envelopment analysis and stochastic frontier analysis. Journal of Civil Engineering and Management, 23(6), 787-795. doi: 10.3846/13923730.2017.1321577
  26. Ndlela, M. N. (2019). A Stakeholder Approach to Risk Management. In M. N. Ndlela (Ed.), Crisis Communication (pp. 53-75). Springer International Publishing. doi: 10.1007/978-3-319-97256-5_4
  27. Raza, M. H., & Zhong, R. Y. (2022). A sustainable roadmap for additive manufacturing using geopolymers in construction industry. Resources, Conservation and Recycling, 186, 106592. doi: 10.1016/j.resconrec.2022.106592
  28. Rezakhani, P. (2012). Classifying Key Risk Factors in Construction Projects. The Bulletin of the Polytechnic Institute of Jassy, Construction. Architecture Section, 58(2), 27-38. Retrieved from http://www.bipcons.ce.tuiasi.ro/Archive/292.pdf
  29. Ritchie, B., & Brindley, C. (2007). An emergent framework for supply chain risk management and performance measurement. Journal of the Operational Research Society, 58(11), 1398-1411. doi: 10.1057/palgrave. jors.2602412
  30. Roy, S., & Gupta, A. (2020). Safety investment optimization in process industry: A risk-based approach. Journal of Loss Prevention in the Process Industries, 63, 104022. doi: 10.1016/j.jlp.2019.104022
  31. Saeidi, P., Saeidi, S. P., Sofian, S., Saeidi, S. P., Nilashi, M., & Mardani, A. (2019). The impact of enterprise risk management on competitive advantage by moderating role of information technology. Computer Standards & Interfaces, 63, 67-82. doi: 10.1016/j. csi.2018.11.009
  32. Shen, L.-Y., Platten, A., & Deng, X. P. (2006). Role of public private partnerships to manage risks in public sector projects in Hong Kong. International Journal of Project Management, 24(7), 587-594. doi: 10.1016/j. ijproman.2006.07.006
  33. Shevchenko, G., Ustinovichius, L., & Walasek, D. (2019). The Evaluation of the Contractor’s Risk in Implementing the Investment Projects in Construction by Using the Verbal Analysis Methods. Sustainability, 11(9), 2660. doi: 10.3390/su11092660
  34. Sukwadi, R., & Caesar, A. (2022). An integrated approach for supply chain risk management. Engineering Management in Production and Services, 14(1), 38-48. doi: 10.2478/emj-2022-0004
  35. Tufano, P. (1996). Who Manages Risk? An Empirical Examination of Risk Management Practices in the Gold Mining Industry. The Journal of Finance, 51(4), 1097-1137. doi: 10.1111/j.1540-6261.1996.tb04064.x
  36. Urbański, M., Haque, A. U., & Oino, I. (2019). The moderating role of risk management in project planning and project success: Evidence from construction businesses of Pakistan and the UK. Engineering Management in Production and Services, 11(1), 23-35. doi: 10.2478/emj-2019-0002
  37. Yang, M., Chen, H., & Xu, Y. (2020). Stakeholder-Associated Risks and Their Interactions in PPP Projects: Social Network Analysis of a Water Purification and Sewage Treatment Project in China. Advances in Civil Engineering, 2020, 1-14. doi: 10.1155/2020/8897196
  38. Yoe, C. E. (2019). Primer on risk analysis: Decision making under uncertainty (Second edition). CRC Press.
  39. Yu, Z., Razzaq, A., Rehman, A., Shah, A., Jameel, K., & Mor, R. S. (2022). Disruption in global supply chain and socio-economic shocks: A lesson from COVID-19 for sustainable production and consumption. Operations Management Research, 15(1-2), 233-248. doi: 10.1007/s12063-021-00179-y
  40. Zaleha Abdul Rasid, S., Rahim Abdul Rahman, A., & Khairuzzaman Wan Ismail, W. (2011). Management accounting and risk management in Malaysian financial institutions: An exploratory study. Managerial Auditing Journal, 26(7), 566-585. doi: 10.1108/02686901111151314
DOI: https://doi.org/10.2478/emj-2023-0031 | Journal eISSN: 2543-912X | Journal ISSN: 2543-6597
Language: English
Page range: 104 - 115
Submitted on: Jun 26, 2023
Accepted on: Nov 15, 2023
Published on: Dec 29, 2023
Published by: Bialystok University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2023 Mohammad A. Mansour, Nabil Beithou, Moh’d Alsqour, Sultan A. Tarawneh, Khalid Al Rababa’a, Sameh AlSaqoor, Ewa Chodakowska, published by Bialystok University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.