Abdul-Rahman, H., Takim, R. & Min, W. S. (2009) Financial-Related Causes Contributing to Project Delays. Journal of Retail & Leisure Property, 8, 225-238. doi: 10.1057/rlp.2009.11
Al-Joburi, K., Al-Aomar, R., & Bahri, M. (2012). Analyzing the Impact of Negative Cash Flow on Construction Performance in 2 the Dubai Area. Journal of Management in Engineering, 15(2), 1-28.
AL-Nassafi, N. M., (2022) The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait. Journal of Asian Finance, Economics and Business, 9(3), 0053-0063.
Al-Subaie, A. A., Faisal, M. N., Aouni, B., & Jabeen, F. (2021). Investigating the role of leadership styles and governance on project performance in mega-projects. Polish Journal of Management Studies, 23(1), 45-58.
Bassioni, H. (2004). A Framework for Measuring Business Performance in Construction Contracting Organizations. Published PhD thesis. Loghborough, UK: Loughborough University.
Elazouni M. A., & Gab-Allah, A. A. (2004). Finance-based scheduling of construction project using integer programming. Journal of Construction Engineering and Management, 130(1), 15-24.
Guracanli, E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182(1), 265-273.
Ho, D. C. P., Ahmed, S. M., Kwan, J. C., & Ming, F. Y. W. (2000). Site Safety Management in Hong Kong. Journal of Management in Engineering, 16, 34-42. doi: 10.1061/(ASCE)0742-597X(2000)16:6(34)
Iyer, K. C., Chaphalkar, N. B., Joshi, G. A. (2008). Understanding time delay disputes in construction contracts. International Journal of Project Management, 26(2), 174-184. doi: 10.1016/j.ijproman.2007.05.002
Koehn, E., & Datta, N. (2003). Quality, Environmental, and Health and Safety Management Systems for Construction Engineering. Journal of Construction Engineering and Management, 129(5), 562-569.
Koelmans, R. G. (2004). Project success and performance evaluation. In Proceedings of the International Platinum Conference “Platinum Adding Value”. The South African Institute of Mining and Metallurgy, Read, Swatman and Voigt (Pty) Limited.
Liang, Y., Ashuri, B., & Li, M. (2021). Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(6), 12-31.
Liberzon, V., & Souza Mello, B. P. (2011). Success Driven Project Management (SDPM) Approach to Project Planning and Performance Analysis. The 8th Annual PMI College of Scheduling, San Francisco.
Makulwasaatudom, A., Emsley, M., & Sinthawanarong, K. (2003). Critical Factors Influencing Construction Productivity in Thailand. In Second International Conference on Construction in the 21st Century (CITC-II). Sustainability and Innovation in Management and Technology. Hong Kong.
McInnis, J., & Collins, D. W. (2011). The effect of cash flow forecasts on accrual quality and benchmark beating. Journal of Accounting and Economics, 51(3), 219-239.
Parfitt, M. K., & Sanvido, V. E. (1993). Checklist of Critical Success Factors for Building Projects. Journal of Management in Engineering, 9(3), 243-249.
Purnus, A., & Bodea, C. N. (2015). Financial management of the construction projects: a proposed cash flow analysis model at project portfolio level. Organization, Technology and Management in Construction: An International Journal, 7(1), 1217-1227.
Sarrireh, M., & Tarawneh, S. (2014). Safety Concept, Value and Cost in Construction Projects in Jordan. Civil and Environmental Research, 6(5), 2224-5790.
Sharifi, M., & Bagherpour, M. (2016). Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach. Periodica Polytechnica Civil Engineering, 60(3), 337-344.
Shash, A. A., & Qarra, A. A. (2018). Cash Flow Management of Construction Projects in Saudi Arabia. Project Management Journal, 49(5), 48-63. doi: 10.1177/8756972818787976
Sinesilassie, E. G., Tabish, S. Z. S., Jha, K. N. (2017). Critical factors affecting schedule performance: A case of Ethiopian public construction projects – engineers’ perspective. Engineering, Construction and Architectural Management, 24(5), 757-773. doi: 10.1108/ECAM-03-2016-0062
Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects”.
Sinesilassiea, E. G., Tabishb, S. Z. S., & Jhaa, K. N. (2017). Critical factors affecting cost performance: a case of Ethiopian public construction projects. International Journal of Construction Management, 17 (1), 24-49. doi: 10.1061/(ASCE)CO.1943-7862.0001280
Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674.
Tarawneh S. A., Sarireh M., & Radi, E. (2020). Time and Cost Overruns in Jordanian Building Construction Projects. Mu’tah Lil-Buhuth wad-Dirasat, Natural and Applied Sciences Series, 35(1), 53-73.
Tunji-Olayeni, P., Mosaku, T., Fagbenle, O., Omuh, I., & Joshua, O. (2016). Evaluating Construction Project Performance: A Case of Construction SMEs in Lagos, Nigeria. Journal of Innovation and Business Best Practices, 2016, 482398. doi: 10.5171/2016.482398
Windapo, A., & Cattel, K. (2013). The South African construction industry: perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), 65-79.