Investigation of factors responsible for delays in the execution of adequately funded construction projects Cover

Investigation of factors responsible for delays in the execution of adequately funded construction projects

Open Access
|Apr 2022

References

  1. Al-Joburi, A. I., Al-Aomar, R., & Bahri, M. E. (2012). Analyzing the impact of negative cash flow on construction performance in the Dubai area. Journal of Management in Engineering, October. doi: 10.1061/(ASCE)ME.1943-5479.0000123
  2. Babatunde, S. O., Opawole, A., & Ujadughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12(1), 1-7. doi: 10.9744/ced.12.1.1-7
  3. Day, J., & Bobeva, M. (2005). A generic toolkit for the successful management of Delphi studies. The Electronic Journal of Business Research Methodology, 3(2), 103-116.
  4. Deep, S., Bilal, M., & Ahmad, S. (2017). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33.
  5. Doloi, H. (2009). Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), 1245-126. doi: 10.1080/01446190903394541
  6. Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 13(1), 20-46. doi: 10.1108/IJMPB-09-2018-0178
  7. Förster, B., & Gracht, H. V. (2014). Assessing Delphi panel composition for strategic foresight — a comparison of panels based on company-internal and external participants. Technological Forecasting & Social Change, 84, 215-229. doi: 10.1016/j.techfore.2013.07.012
  8. Franklin, K. J., & Hart, K. (2007). Idea generation and exploration: benefits and limitations of the Policy Delphi research method. Innovative Higher Education, 31, 237-246. doi: 10.1007/s10755-006-9022-8
  9. Fugar, F. D. K., & Agyakwah-Baah, A. B. (2010). Delays in building construction projects in Ghana. Australian Journal of Construction Economics and Building, 10(1-2), 102-116. doi: 10.5130/AJCEB.v10i1-2.1592
  10. Hasson, F., Keeney, S., & McKenna, H. (2000). Research guidelines for the Delphi survey. Journal of Advanced Nursing, 32, 1008-1015. doi: 10.1046/j.1365-2648.2000.t01-1-01567.x
  11. Indhu, B., & Ajai, P. (2014). Study of delay management in a construction project – a case study. International Journal of Emerging Technology and Advanced Engineering, 4(5), 108-113. doi: 10.1.1.643.8673
  12. Jafari, A. (2013). A contractor pre-qualification model based on the quality function deployment method. Construction Management and Economics, 31(7), 746-760. doi: 10.1080/01446193.2013.825045
  13. Jefferies, M., Brewer, G. J., & Gajendran, T. (2014). Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), 465-480. doi: 10.1108/ECAM-01-2012-0007
  14. Kamau, C. G., & Mohamed, H. B. (2015). Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A Conceptual Framework. Science Journal of Business and Management, 3(3), 2015, 82-94. doi: 10.11648/j.sjbm.20150303.14
  15. Magondu, A. (2013). Factors influencing implementation of monitoring and evaluation in HIV research projects, a case of Kenya Aids Vaccine Initiative (Kavi). Master’s dissertation. University of Nairobi, Kenya. Retrieved from http://erepository.uonbi.ac.ke:8080/xmlui/handle/123456789/56377
  16. Olatunji, S. O. (2019). Drivers of timely payment in public building projects in Nigeria. FUTA Journal of Engineering and Engineering Technology, 13(2), 158-171.
  17. Omopariola, E. D., Windapo, A., Edwards, D. J., & Thwala, W. D. (2020). Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), 308-325. doi: 10.1108/JEDT-04-2019-0099
  18. Pourrashidi, R., Mehranpour, M., & Nick, M. F. (2017). Human resources management: challenges and solutions. Helix, 8, 998-1001. doi: 10.29042/2017-998-1001
  19. Sekayi, D., & Kennedy, A. (2017). Qualitative Delphi method: a four-round process with a worked example. The Qualitative Report, 22(10), 2755-2763.
  20. Steinerowska-Streb, I., & Głód. G. (2020). Innovations in Polish family firms. Exploring employee creativity and management practices that stimulate innovative thinking. Journal of Entrepreneurship, Management and Innovation, 16(1), 231-260. doi: 10.7341/20201628
  21. Turkar, P., & Apte, M. R. (2016). Delay causes and importance of corrective actions on them. International Research Journal of Engineering and Technology, 3(6), 863-866.
  22. Yalini, R., & Alan, S. (2015). Study on identification of delay factors in construction project in Tamilnadu. International Journal of Science and Engineering Research, 3(5), 3221-3224.
  23. Yin, R. K. (2014). Case study research – design and methods. 5th ed. Singapore: SAGE.
  24. Zamojska, A., & Próchniak, J. (2017). Measuring the Social Impact of Infrastructure Projects: The Case of Gdańsk International Fair Co. Journal of Entrepreneurship, Management and Innovation, 14(4), 25-42. doi: 10.7341/20171342
  25. Zayed, T., & Liu, Y. (2014). Cash flow modelling for construction projects. Engineering, Construction and Architectural Management, 21(2), 170-189. doi: 10.1108/ECAM-08-2012-0082
DOI: https://doi.org/10.2478/emj-2022-0008 | Journal eISSN: 2543-912X | Journal ISSN: 2543-6597
Language: English
Page range: 93 - 102
Submitted on: Sep 2, 2021
|
Accepted on: Feb 24, 2022
|
Published on: Apr 22, 2022
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2022 Edoghogho Ogbeifun, Jan-Harm C Pretorius, published by Bialystok University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.