Have a personal or library account? Click to login
Seru production as an alternative to a traditional assembly line Cover

Seru production as an alternative to a traditional assembly line

Open Access
|Oct 2018

References

  1. Badura, D. (2017). Urban Traffic Modelling and Simulation. Forum Scientiae Oeconomia, 5(4), 85-97.
  2. Gálová, K., Rajnoha, R., & Ondra, P. (2018). The Use Of Industrial Lean Management Methods In The Economics Practice: An Empirical Study Of The Production Companies In The Czech Republic. Polish Journal Of Management Studies, 17(1), 93-104.10.17512/pjms.2018.17.1.08
  3. Gudanowska, A., Alonso, J. P., & Törmänen, A. (2018). What competencies are needed in the production industry? The case of the Podlaskie Region. Engineering Management in Production and Services, 10(1), 65-74.10.1515/emj-2018-0006
  4. Halicka, K. (2018). The Reference Methodology of Prospective Analysis of Technology in Production Engineering. In S. Şahin (Ed.), 8th International Conference on Engineering, Project, and Product Management. Lecture Notes in Mechanical Engineering (pp. 99-107). Cham, Switzerland: Springer.10.1007/978-3-319-74123-9_11
  5. Kaku, I. (2017). Is seru a sustainable manufacturing system? Procedia Manufacturing, 8, 723-730.10.1016/j.promfg.2017.02.093
  6. Kikolski, M. (2016). Identification of production bottlenecks with the use of Plant Simulation software. Economics and Management, 8(4), 103-112.10.1515/emj-2016-0038
  7. Liu, C., Stecke, K. E., Lian, J., & Yin, Y. (2014). An implementation framework for seru production. International Transactions in Operational Research, 21, 1-19.10.1111/itor.12014
  8. Nazarko, J., Ejdys, J., Halicka, K., Nazarko, Ł., Kononiuk, A., & Olszewska, A. (2017). Structural Analysis as an Instrument for Identification of Critical Drivers of Technology Development. Procedia Engineering, 182, 474-481.10.1016/j.proeng.2017.03.137
  9. Villa, A., & Taurino, T. (2013). From JIT to Seru, for a production as lean as possible. Procedia Engineering, 63, 956-965.10.1016/j.proeng.2013.08.172
  10. Yin, Y., Stecke, K. E., & Kaku, I. (2008). The evolution of seru production systems throughout Canon. Operations Management Education Review, 2, 27-40.10.4135/9781526462060
  11. Yin, Y., Stecke, K. E., Swink, M., & Kaku, I. (2012). Integrating lean and agile production paradigms in a highly volatile environment with seru production systems: Sony and Canon case studies. Yamagata, Japan: Yamagata University.
  12. Ying, K., & Tsai, Y. (2017). Minimising total cost for training and assigning multiskilled workers in seru production systems. International Journal of Production Research, 55(10), 2978-2989.10.1080/00207543.2016.1277594
  13. Zwierzyński, P. (2018). Seru production jako japońska forma produkcji komórkowej [Seru production as a Japanese form of cell production]. In R. Knosala (Ed.), Innowacje w zarządzaniu i inżynierii produkcji. Tom I [Innovations in management and production engineering. Volume I], (pp. 530-537). Opole, Poland: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją.
DOI: https://doi.org/10.2478/emj-2018-0017 | Journal eISSN: 2543-912X | Journal ISSN: 2543-6597
Language: English
Page range: 62 - 69
Submitted on: Feb 1, 2018
Accepted on: Jul 1, 2018
Published on: Oct 16, 2018
Published by: Bialystok University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2018 Patryk Zwierzyński, Hesham Ahmad, published by Bialystok University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.