References
- Allur, E., Heras-Saizarbitoria, I., Boiral, O., Testa, F., 2018. Quality and Environmental Management linkage: A review of the literature. Sustainability, Switzerland, 10(11),4311.
- Babica, M., Pająk, E., 2006. Koncepcja metody eliminacji niezgodności w procesach produkcyjnych. Zeszyty Naukowe Politechniki Poznańskiej, 3, 5-15.
- Banduka, N., Tadic, D., Macuzic, I, et al., 2018. Extended process failure mode and effect analysis (PFMEA) for the automotive industry: The FSQC-PFMEA. Advances In Production Engineering & Management, 13, 2, 206-215.
- Borcz, A., 2003. Globalne wytyczne zarządzania jakością dla dostawców przemysłu motoryzacyjnego (ISO/TS 16949:2002) na tle sytuacji w branży, Problemy Jakości, 3, 12-14.
- Celmerowski, Z., 2007. Metoda Global 8D. Kraków: TQM soft.
- Company reserved materials., 2011.
- Company reserved materials., 2012.
- Czarski, A., 2010. Statystyczne Sterowanie Procesem - Szkolenie Podstawowe. Kraków: TQM soft.
- Global 8D solving workbook, 2018., Results People developing people, Essex
- http://cdn2.hubspot.net/hub/170850/file-18472412-pdf/docs/global_8d_workbook.pdf (access 1 November 2018).
- Grecu, I., Belu, N., Misztal, A.,2015 Increasing customer satisfaction through the application of the 8d methodology. Management - the key driver for creating value Book Series: International Conference of Management and Industrial Engineering, 488-495.
- Harmol, A., Mantura, W., 2002. Zarządzanie jakością teoria i praktyka, third ed. PWN Warszawa-Poznań, Poland.
- Hamrol, A., 2012. Zarządzanie jakością z przykładami. PWN, Warszawa, Poland
- Ishikawa, K., 1976. Guide to Quality Control. Asian Productivity Organization, Tokyo, Japan
- ISO., 2015. Quality Management Principles. Geneva: The International Organization for Standardization, Available online: http://www.iso.org/files/live/sites/isoorg/files/archive/pdf/en/pub100080.pdf (accessed on 1 November 2018).
- Majerník, M., Štofová, L., Bosák, M., Szaryszová, P., 2016. Process innovations and quality measurement in automotive manufacturing. Production Management and Engineering Sciences - Scientific Publication of the International Conference on Engineering Science and Production Management, ESPM 2015, 179-184.
- Nagi, A., Altarazi, S. 2017. Integration of Value Stream Map and Strategic Layout Planning into DMAIC Approach to Improve Carpeting Process. Journal Of Industrial Engineering And Management-JIEM, 10, 1, 74-97.
- Ramachandran, T., Prakash, R., Karthik, R., Valappa, Kumar S., 2013. An application of g8D methodology as a problem solving tool in a manufacturing firm. International Conference of Sustainable Manufacturing and Operations Management ISOM. Conference Materials, Gyandhara International, 331-335
- Rambaud, L., 2006. 8D Structured Problem Solving: A Guide to Creating High Quality 8D Reports. PHRED Solutions.
- Sarkar, S., Rajagopalan, B., 2018. Consumer safety complaints and organizational learning: evidence from the automotive industry. International Journal of Quality and Reliability Management, 35, 10, 2094-2118.
- Savino, M.M., Mazza, A., 2016. Assessing product sustainability measurement within quality management systems: A case study in automotive industry. International Journal of Productivity and Quality Management 18, 2-3, 258-278.
- Tague, N., R., 2004. Seven Basic Quality Tools. American Society for Quality: Milwaukee, Wisconsin, USA.
- Wesołowska E., Ż. J. (2006). Sterowanie jakością w procesie montażu - uwagi ogólne. Warszawa: Technologia i Automatyzacja Montażu Nr 1.
- Xu, Z.; Dang, Y.; Munro, P., 2018. Knowledge-driven intelligent quality problem-solving system in the automotive industry. Advanced Engineering Informatics, 38, 441-457.
- Zymonik, Z., Hamrol, A., Grudowski, P. 2013. Zarządzanie jakością i bezpieczeństwem. PWE, Warszawa