Have a personal or library account? Click to login
Analysis and Improvement of the Galvanized Wire Production Process with the use of DMAIC Cycle Cover

Analysis and Improvement of the Galvanized Wire Production Process with the use of DMAIC Cycle

By: Krzysztof Knop  
Open Access
|Oct 2019

Abstract

The article presents the results in the scope of analysis and improvement of the galvanized wire production process with the use of Six Sigma's DMAIC cycle. The basic problem was identified - incorrect wire diameters after galvanizing and specific tools and methods were used to analyze this problem and look for its solution. The potential of Pareto analysis, SPC method, control plan, 5WHY analysis was used. As a result of the analyzes carried out, the source cause was identified - contaminated containers dispensing the preparation maintaining the temperature in the galvanizing unit. To eliminate the problem, maintenance of the machine used to cover the bare wire with zinc was carried out, which allowed to achieve the following results: standstills at the Drawing and Galvanizing Department were eliminated, the duration of the manufacturing process and the percentage of products beyond the specification were significantly reduced.

Language: English
Page range: 551 - 558
Submitted on: Apr 18, 2019
Accepted on: May 13, 2019
Published on: Oct 8, 2019
Published by: Quality and Production Managers Association
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2019 Krzysztof Knop, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.