Have a personal or library account? Click to login
New Local Search Procedure for Workforce Planning Problem Cover

New Local Search Procedure for Workforce Planning Problem

Open Access
|Dec 2020

References

  1. 1. Alba, E., G. Luque, F. Luna. Parallel Metaheuristics for Workforce Planning. – J. Mathematical Modelling and Algorithms, Vol. 6, Springer, 2007, No 3, pp. 509-528.10.1007/s10852-007-9058-5
  2. 2. Bonabeau, E., M. Dorigo, G. Theraula. Swarm Intelligence: From Natural to Artificial Systems. New York, Oxford University Press, 1999.10.1093/oso/9780195131581.001.0001
  3. 3. Campbell, G. A Two-Stage Stochastic Program for Scheduling and Allocating Cross-Trained Workers. – J. Operational Research Society, Vol. 62, 2011, No 6, pp. 1038-1047.10.1057/jors.2010.16
  4. 4. Dorigo, M., T. T. Stutzle. Ant Colony Optimization. MIT Press, 2004.10.7551/mitpress/1290.001.0001
  5. 5. Easton, F. Service Completion Estimates for Cross-Trained Workforce Schedules under Uncertain Attendance and Demand. – Production and Operational Management, Vol. 23, 2014, No 4, pp. 660-675.10.1111/poms.12174
  6. 6. Fidanova, S., O. Roeva, M. Paprzycki., P. Gepner. InterCriteria Analysis of ACO Start Startegies. – In: Proc. of 2016 Federated Conference on Computer Science and Information Systems, 2016, pp. 547-550.10.15439/2016F137
  7. 7. Fidanova, S., G. Luquq, O. Roeva, M. Paprzycki, P. Gepner. Ant Colony Opimization Algorithm for Workforce Planning. FedCSIS’2017, IEEE Xplorer, IEEE Catalog Number CFP1585N-ART, 2017, pp. 415-419.10.15439/2017F63
  8. 8. Fidanova S., G. Luque, O. Roeva, M. Paprzycki, P. Gepner. Hybrid Ant Colony Optimization Algorithm for Workforce Planning. – Annals of Computer Science and Information Systems, Vol. 15, 2018, pp. 233-236. ISSN: 2300-5963, DOI: http://dx.doi.org/10.15439/2018F47.10.15439/2018F47
  9. 9. Glover, F., G. Kochenberger, M. Laguna, T. Wubbena. Selection and Assignment of a Skilled Workforce to Meet Job Requirements in a Fixed Planning Period. – In: Proc. of MAEB’04, 2004, pp. 636-641.
  10. 10. Grzybowska, K., G. Kovács. Sustainable Supply Chain-Supporting Tools. – In: Proc. of 2014 Federated Conference on Computer Science and Information Systems, Vol. 2, 2014, pp. 1321-1329.10.15439/2014F75
  11. 11. Hewitt, M., A. Chacosky, S. Grasman, B. B. Thomas. Integer Programming Techniques for Solving Non-Linear Workforce Planning Models with Learning. – European J. of Operational Research, Vol. 242, 2015, No 3, 942-950.10.1016/j.ejor.2014.10.060
  12. 12. Hu, K., X. Zhang, M. Gen, J. Jo. A New Model for Single Machine Scheduling with Uncertain Processing Time. – J. Intelligent Manufacturing, Vol. 28, Springer, 2015, No 3, pp. 717-725.10.1007/s10845-015-1033-9
  13. 13. Li, G., H. Jiang, T. T. He. A Genetic Algorithm-Based Decomposition Approach to Solve An Integrated Equipment-Workforce-Service Planning Problem. – Omega, Vol. 50, Elsevier, 2015, pp. 1-17.10.1016/j.omega.2014.07.003
  14. 14. Li, R., G. Liu. An Uncertain Goal Programming Model for Machine Scheduling Problem. – J. Inteligent Manufacturing, Vol. 28, 2014, No 3, Springer, pp. 689-694.10.1007/s10845-014-0982-8
  15. 15. Ning, Y., J. Liu, L. Yan. Uncertain Aggregate Production Planning. – Soft Computing, Vol. 17, Springer, 2013, No 4, pp. 617-624.10.1007/s00500-012-0931-4
  16. 16. Othman, M., N. Bhuiyan, G. Gouw. Integrating Workers’ Differences into Workforce Planning. – Computers and Industrial Engineering, Vol. 63, 2012, No 4, pp. 1096-1106.10.1016/j.cie.2012.06.015
  17. 17. Parisio, A., C. N. Jones. A Two-Stage Stochastic Programming Approach to Employee Scheduling in Retail Outlets with Uncertain Demand. – Omega, Vol. 53, Elsevier, 2015, pp. 97-103.10.1016/j.omega.2015.01.003
  18. 18. Soukour, A., L. Devendeville, C. Lucet, A. Moukrim. A Memetic Algorithm for Staff Scheduling Problem in Airport Security Service. – Expert Systems with Applications, Vol. 40, 2013, No 18, pp. 7504-7512.10.1016/j.eswa.2013.06.073
  19. 19. Todorov, V., I. Dimov. Monte Carlo Methods for Multidimensional Integration for European Option Pricing. – In: Proc. of AIP Conference 1773, 2016. DOI: 10.1063/1.4965003.10.1063/1.4965003
  20. 20. Todorov, V., N. Ikonomov, S. Apostolov, I. Dimov, R. Georgieva, Y. Dimitrov. An Improved “Walk on Equations” Monte Carlo Algorithm for Linear Algebric Systems, Recent Advances in Computational Optimization. – Studies in Computational Intelligence, Vol. 838, Springer, 2020, pp. 215-236.10.1007/978-3-030-22723-4_14
  21. 21. Todorov, V., I. Dimov. Efficient Stochastic Approach for Multidimensional Integrals in Bayesian Statistics, Large Scale Scientific Computing. – Lecture Notes in Computer Science, Vol. 11958, Springer, 2020, pp. 454-462.10.1007/978-3-030-41032-2_52
  22. 22. Yang, G., W. Tang, R. Zhao. An Uncertain Workforce Planning Problem with Job Satisfaction. – Int. J. Machine Learning and Cybernetics, Springer, 2016. DOI:10.1007/s13042-016-0539-6.10.1007/s13042-016-0539-6
  23. 23. Zhou, C., W. Tang., R. Zhao. An Uncertain Search Model for Recruitment Problem with Enterprise Performance. – J. Intelligent Manufacturing, Vol. 28, Springer, 2014, No 3, pp. 295-704. DOI:10.1007/s10845-014-0997-1.10.1007/s10845-014-0997-1
DOI: https://doi.org/10.2478/cait-2020-0059 | Journal eISSN: 1314-4081 | Journal ISSN: 1311-9702
Language: English
Page range: 40 - 48
Submitted on: Aug 20, 2020
Accepted on: Oct 23, 2020
Published on: Dec 31, 2020
Published by: Bulgarian Academy of Sciences, Institute of Information and Communication Technologies
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2020 Stefka Fidanova, Gabriel Luque, published by Bulgarian Academy of Sciences, Institute of Information and Communication Technologies
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.