Have a personal or library account? Click to login
Internal Logistics Process Improvement using PDCA: A Case Study in the Automotive Sector Cover

Internal Logistics Process Improvement using PDCA: A Case Study in the Automotive Sector

Open Access
|Dec 2022

References

  1. 1. Abreu, M. F., Alves, A. C., Moreira, F. (2017), “Lean-Green models for eco-efficient and sustainable production”, Energy, Vol. 137, pp. 846–853.10.1016/j.energy.2017.04.016
  2. 2. Aichouni, A., Faizir, R., Abdullah, H. (2021), “Process improvement methodology selection in manufacturing: A literature review perspective”, International Journal of Advanced and Applied Sciences, Vol. 8, No. 3, pp. 12–20.10.21833/ijaas.2021.03.002
  3. 3. Alnahhal, M., Ridwan, A., Noche, B. (2014), “In-plant milk run decision problems”, 2014 International Conference on Logistics Operations Management, pp. 85–92.10.1109/GOL.2014.6887421
  4. 4. Antunes JĂşnior, A., Broday, E. E. (2019), “ADOPTING PDCA TO LOSS REDUCTION: A CASE STUDY IN A FOOD INDUSTRY IN SOUTHERN BRAZIL”, International Journal for Quality Research, Vol. 13, No. 2, pp. 335–348.10.24874/IJQR13.02-06
  5. 5. Boateng, A. (2019) “Supply chain management and lean concept in construction: a case of Ghanaian building construction industry”, Organization, Technology and Management in Construction: An International Journal, Vol. 11 No. 1, pp. 2034–2043.10.2478/otmcj-2019-0010
  6. 6. Bragança, S., Alves, A., Costa, E., Sousa, R. (2013), “The use of lean tools to improve the performance of an elevators company”, Integrity, Reliability and Failure of Mechanical Systems (IRF2013), Vol. 1, pp. 1–8.
  7. 7. Brajer-Marczak, R. (2014), “Employee engagement in continuous improvement of processes”, Management, Vol. 18, No. 2, pp. 88–103.10.2478/manment-2014-0044
  8. 8. Chiarini, A., Baccarani, C., Mascherpa, V. (2018), “Lean production, Toyota Production System and Kaizen philosophy”, The TQM Journal, Vol. 30 No. 4, pp. 425–438.10.1108/TQM-12-2017-0178
  9. 9. de Paula, J. C. M., Feroni, R. de C. (2021), “Utilização do ciclo PDCA e aplicação do MILK RUN em um processo de logística reversa em uma indústria de alimentos”, Brazilian Journal of Production Engineering, Vol. 7, No. 2, pp.16–30.10.47456/bjpe.v7i2.34621
  10. 10. Garza-Reyes, J. A., Torres Romero, J., Govindan, K., Cherrafi, A., Ramanathan, U. (2018), “A PDCA-based approach to Environmental Value Stream Mapping (E-VSM)”, Journal of Cleaner Production, Vol. 180, pp. 335–348.10.1016/j.jclepro.2018.01.121
  11. 11. Goldsby, T. J., García-Dastugue, S. J. (2003), “The Manufacturing Flow Management Process”, The International Journal of Logistics Management, Vol. 14, No. 2, pp. 33–52.10.1108/09574090310806585
  12. 12. Gyulai, D., Pfeiffer, A., Sobottka, T., Váncza, J. (2013), “Milkrun Vehicle Routing Approach for Shop-floor Logistics”, Procedia CIRP, Vol. 7, pp.127–132.10.1016/j.procir.2013.05.022
  13. 13. Isniah, S., Hardi Purba, H., Debora, F. (2020), “Plan do check action (PDCA) method: literature review and research issues”, Jurnal Sistem Dan Manajemen Industri, Vol. 4 No. 1, pp. 72–81.10.30656/jsmi.v4i1.2186
  14. 14. Ivanov, D., Sethi, S., Dolgui, A., Sokolov, B. (2018), “A survey on control theory applications to operational systems, supply chain management, and Industry 4.0”, in Annual Reviews in Control Vol. 46.10.1016/j.arcontrol.2018.10.014
  15. 15. Jagusiak-Kocik, M. (2017), “PDCA cycle as a part of continuous improvement in the production company - a case study”, Production Engineering Archives, Vol. 14, No. 14, pp. 19–22.10.30657/pea.2017.14.05
  16. 16. Kluska, K., Pawlewski, P. (2018), “The use of simulation in the design of Milk-Run intralogistics systems”, IFAC-PapersOnLine, Vol. 5, No. 11, pp. 1428–1433.10.1016/j.ifacol.2018.08.314
  17. 17. Lerche, J., Neve, H., Wandahl, S., Gross, A. (2020), “Continuous Improvements at Operator Level”, Journal of Engineering, Project, and Production Management, Vol. 10, No 1, pp. 64–70.
  18. 18. Malega, P., Daneshjo, N., Rudy, V., Drábik, P. (2021), “PDCA Cycle – Tool for Improvement of the Business Processes – Case Study”, TEM Journal, pp. 1336–1347.10.18421/TEM103-42
  19. 19. Milosevic, M., Djapan, M., D’Amato, R., Ungureanu, N., Ruggiero, A. (2021), “Sustainability of the Production Process by Applying Lean Manufacturing Through the PDCA Cycle – A Case Study in the Machinery Industry”, pp. 199–211.10.1007/978-3-030-71956-2_16
  20. 20. Nemoto, T., Hayashi, K., Hashimoto, M. (2010), “Milk-run logistics by Japanese automobile manufacturers in Thailand”, Procedia - Social and Behavioral Sciences, Vol. 2, No. 3, pp. 5980–5989.10.1016/j.sbspro.2010.04.012
  21. 21. Ohno, T. (1988), “Toyota production system: beyond large-scale production”. crc Press.
  22. 22. Oliveira, M. S., Moreira, H. D. A., Alves, A. C., Ferreira, L. P. (2019), “Using Lean Thinking Principles To Reduce Wastes In Reconfiguration Of Car Radio Final Assembly Lines”, Procedia Manufacturing, Vol. 41, pp. 803–810.10.1016/j.promfg.2019.09.073
  23. 23. Puchkova, A., Le Romancer, J., McFarlane, D. (2016), “Balancing Push and Pull Strategies within the Production System”, IFAC-PapersOnLine, Vol. 49, No. 2, pp. 66–71.10.1016/j.ifacol.2016.03.012
  24. 24. Rahim, N. A., Hamedon, Z., Turan, F. M., Iskandar, I. (2016), “Reducing Bits in Electrodeposition Process of Commercial Vehicle - A Case Study”, IOP Conference Series: Materials Science and Engineering, Vol. 114, No. 1, 012051.10.1088/1757-899X/114/1/012051
  25. 25. Randhawa, J. S., Ahuja, I. S. (2017), “5S – a quality improvement tool for sustainable performance: literature review and directions”, International Journal of Quality and Reliability Management, Vol. 34, No. 3, pp. 334–361.10.1108/IJQRM-03-2015-0045
  26. 26. Realyvásquez-Vargas, A., Arredondo-Soto, K., Carrillo-Gutiérrez, T., Ravelo, G. (2018), “Applying the Plan-Do-Check-Act (PDCA) Cycle to Reduce the Defects in the Manufacturing Industry”, A Case Study. Applied Sciences, Vol. 8, No. 11, pp. 2181.10.3390/app8112181
  27. 27. Santos, Z. G. dos, Vieira, L., Balbinotti, G. (2015), “Lean Manufacturing and Ergonomic Working Conditions in the Automotive Industry”, Procedia Manufacturing, Vol. 3, pp. 5947–5954.10.1016/j.promfg.2015.07.687
  28. 28. Saunders, M., Lewis, P., Thornhill, A. (2007), “Research Methods for Business Students” (4th ed.), Edinburg, Pearson Education.
  29. 29. Uluskan, M. (2019), “Analysis of Lean Six Sigma tools from a multidimensional perspective”, Total Quality Management and Business Excellence, Vol. 30, No. 9–10, pp. 1167–1188.10.1080/14783363.2017.1360134
  30. 30. Veres, C., Marian, L., Moica, S., Al-Akel, K. (2018), “Case study concerning 5S method impact in an automotive company”, Procedia Manufacturing, Vol. 22, pp. 900–905.10.1016/j.promfg.2018.03.127
  31. 31. Vicente, S., Alves, A. C., Carvalho, S., Costa, N. (2016), “Improving Safety and Health in a Lean Logistic project: a case study in an automotive electronic components company”, In P. Arezes, J. Baptista, M. Barroso, P. Carneiro, P. Cordeiro, N. Costa, R. Melo, A. Miguel, G. Perestrelo (Eds.), SHO2015: International Symposium on Occupational Safety and Hygiene. PORTUGUESE SOC OCCUPATIONAL SAFETY HYGIENE, March, Guimarães, Portugal, pp. 23-24.
DOI: https://doi.org/10.2478/bsrj-2022-0027 | Journal eISSN: 1847-9375 | Journal ISSN: 1847-8344
Language: English
Page range: 100 - 115
Submitted on: Jan 25, 2022
Accepted on: Nov 6, 2022
Published on: Dec 30, 2022
Published by: IRENET - Society for Advancing Innovation and Research in Economy
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2022 Vitória P. Amaral, Ana C. Ferreira, Bruna Ramos, published by IRENET - Society for Advancing Innovation and Research in Economy
This work is licensed under the Creative Commons Attribution 4.0 License.