Variations in Building Construction Projects in Ghana: A Public Organisational Perspective Cover

Variations in Building Construction Projects in Ghana: A Public Organisational Perspective

Open Access
|Nov 2023

References

  1. Adedokun, O., & Egbelakin, T. (2022). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 1472–5967. <a href="https://doi.org/10.1108/JFM-01-2022-0002" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/JFM-01-2022-0002</a>
  2. Ajayi, B. O., & Chinda, T. (2022). Impact of construction delay-controlling parameters on project schedule: DEMATEL-system dynamics modeling approach. Frontiers in Built Environment, 8, Article 799314. <a href="https://doi.org/10.3389/fbuil.2022.799314" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.3389/fbuil.2022.799314</a>
  3. Akomah, B. B., Mustapha, Z., & Mensah, J. W. (2018). Cost impacts of variations on building construction projects. MOJ Civil Engineering, 4(5), 386–392. <a href="https://doi.org/10.15406/mojce.2018.04.00133" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.15406/mojce.2018.04.00133</a>
  4. Akomah, B. B., Zakari, M., & Enoch Ayeh, E. (2020a). Impact of cost of construction projects in Cape Coast metropolis. Buletinul Institutului Politehnic Din Iaşi, 66(1), 95–112.
  5. Akomah, B. B., Mustapha, Z., & Ofosu, E. K. (2020b). Contractors’ commitment to early completion of projects. Australian Journal of Science & Technology, 4(2), 283–288. https://www.researchgate.net/publication/343008004_Contractors’_commitment_to_early_completion_of_projects
  6. Alkhalifah, S. J., Tuffaha, F. M., Al Hadidi, L. A., & Ghaithan, A. (2023). Factors influencing change orders in oil and gas construction projects in Saudi Arabia. Built Environment Project and Asset Management, 13(3), 430–452. <a href="https://doi.org/10.1108/BEPAM-06-2022-0081" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/BEPAM-06-2022-0081</a>
  7. Al-Kofahi, Z. G., Mahdavian, A., & Oloufa, A. (2022). System dynamics modeling approach to quantify change orders impact on labour productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), 1355–1366. <a href="https://doi.org/10.1080/15623599.2020.1711494" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/15623599.2020.1711494</a>
  8. Alshboul, O., Alzubaidi, M. A., Mamlook, R. E. A., Almasabha, G., Almuflih, A. S., & Shehadeh, A. (2022). Forecasting liquidated damages via machine learning-based modified regression models for highway construction projects. Sustainability, 14(10), Article 5835. <a href="https://doi.org/10.3390/su14105835" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.3390/su14105835</a>
  9. Altaf, M., Musarat, M. A., Khan, A., Shoukat, Z., & Salahuddin, U. (2020). Change order impact on construction industry of Pakistan. In F.M. Nazri (Ed.), Proceedings of AICCE’19. AICCE 2019. Lecture Notes in Civil Engineering, 53 (pp. 391–402). Springer International Publishing. <a href="https://doi.org/10.1007/978-3-030-32816-0_25" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1007/978-3-030-32816-0_25</a>
  10. Amoatey, C. T., & Anson, B. A. (2017). Investigating the major causes of scope creep in real estate construction projects in Ghana. Journal of Facilities Management, 15(4), 393–408. <a href="https://doi.org/10.1108/JFM-11-2016-0052" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/JFM-11-2016-0052</a>
  11. Anderson, J. E., Moyer, J., & Chichirau, G. (2022). Public policymaking. Cengage Learning. Asadi, R., Wilkinson, S., & Rotimi, J. O. B. (2023). The common causes of rework in construction contracts: a diagnostic approach. Journal of Engineering, Design and Technology, 21(4), 1107–1133. <a href="https://doi.org/10.1108/JEDT-04-2021-0215" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/JEDT-04-2021-0215</a>
  12. Asamoah, R. O., & Offei-Nyako, K. (2013). Variation determinants in building construction: Ghanaian professionals’ perspective. KICEM Journal of Construction Engineering and Project Management, 3(4), 20–25. <a href="https://doi.org/10.6106/JCEPM.2013.3.4.020" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.6106/JCEPM.2013.3.4.020</a>
  13. Assaad, R. H., Ahmed, M. O., El-Adaway, I. H., & Shrestha, P. P. (2021). Management of change orders in infrastructure transportation projects. Practice Periodical on Structural Design and Construction, 27(1), Article 05021006. <a href="https://doi.org/10.1061/(ASCE)SC.1943-5576.0000640" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)SC.1943-5576.0000640</a>
  14. Desyardi, H., Latief, Y., & Soepandji, B. S. (2019). Guidelines for effective variation order determination strategy. IOP Conference Series: Earth and Environmental Science, 258(2019), Article 012030. <a href="https://doi.org/10.1088/1755-1315/258/1/012030" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1088/1755-1315/258/1/012030</a>
  15. Diyagama, D., Victar, H. C., Waidyasekara, A. S., & Rameezdeen, R. (2023). Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 1–11. <a href="https://doi.org/10.1080/15623599.2023.2215109" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/15623599.2023.2215109</a>
  16. Dosumu, O. S., & Aigbavboa, C. O. (2017). Impact of design errors on variation cost of selected building project in Nigeria. Procedia Engineering, 196, 847–856. <a href="https://doi.org/10.1016/j.proeng.2017.08.016" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.proeng.2017.08.016</a>
  17. Duguay, R., Rauter, T., & Samuels, D. (2023). The impact of open data on public procurement. Journal of Accounting Research, 61(4), 1159–1224. <a href="https://doi.org/10.1111/1475-679X.12479" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1111/1475-679X.12479</a>
  18. Eldeep, A. M., Farag, M. A., & Abd El-Hafez, L. M. (2022). Using BIM as a lean management tool in construction processes – A case study. Ain Shams Engineering Journal, 13(2), Article 101556. <a href="https://doi.org/10.1016/j.asej.2021.07.009" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.asej.2021.07.009</a>
  19. Genc, O. (2023). Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: A relative importance index (RII) and exploratory factor analysis (EFA) approach. International Journal of Construction Management, 23(6), 979–987. <a href="https://doi.org/10.1080/15623599.2021.1946901" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/15623599.2021.1946901</a>
  20. Ghaleb, H., Alhajlah, H. H., Bin Abdullah, A. A., Kassem, M. A., & Al-Sharafi, M. A. (2022). A scientometric analysis and systematic literature review for construction project complexity. Buildings, 12(4), Article 482. <a href="https://doi.org/10.3390/buildings12040482" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.3390/buildings12040482</a>
  21. Haile, G. (2022). Causes of change orders and their impact on construction cost: The case of Addis Ababa Design and Construction Works Bureau [Doctoral dissertation, St. Mary’s University].
  22. Hansen, S., Fassa, F., & Wijaya, S. (2023). Factors influencing scheduling activities of construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(1), Article 06522004. <a href="https://doi.org/10.1061/(ASCE)LA.1943-4170.0000594" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)LA.1943-4170.0000594</a>
  23. Kermanshachi, S., & Pamidimukkala, A. (2023). Uncertainty analysis of key schedule performance indicators in design, procurement, and construction phases of heavy industrial projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(1), Article 04522042. <a href="https://doi.org/10.1061/(ASCE)LA.1943-4170.0000588" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)LA.1943-4170.0000588</a>
  24. Koushki, P. A., Al-Rashid, K., & Kartam, N. (2005). Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), 285–294. <a href="https://doi.org/10.1080/0144619042000326710" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/0144619042000326710</a>
  25. Love, P. E., Irani, Z., Smith, J., Regan, M., & Liu, J. (2017). Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Production Planning & Control, 28(13), 1081–1092. <a href="https://doi.org/10.1080/09537287.2017.1333647" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/09537287.2017.1333647</a>
  26. Mahmoud, H., Ahmed, V., & Beheiry, S. (2021). Construction cash flow risk index. Journal of Risk and Financial Management, 14(6), Article 269. <a href="https://doi.org/10.3390/jrfm14060269" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.3390/jrfm14060269</a>
  27. Mishmish, M., & El-Sayegh, S. M. (2018). Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), 26–33. <a href="https://doi.org/10.1080/15623599.2016.1230959" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/15623599.2016.1230959</a>
  28. Mishra, K., & Aithal, P. S. (2022). Causes and effects of design change of construction projects. International Journal of Applied Engineering and Management Letters (IJAEML), 6(1), 87–99. <a href="https://doi.org/10.5281/zenodo.6085346" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.5281/zenodo.6085346</a>
  29. Myburgh, K. S. (2018). The minimum site investigation requirements needed to define site conditions considering the results of ground investigations and its true reflection of actual site conditions found during construction [Doctoral dissertation, Stellenbosch: Stellenbosch University]. https://core.ac.uk/download/pdf/188224806.pdf
  30. Naji, K. K., Gunduz, M., & Naser, A. F. (2022). The effect of change-order management factors on construction project success: A structural equation modelling approach. Journal of Construction Engineering and Management, 148(9), Article 04022085. <a href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0002350" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)CO.1943-7862.0002350</a>
  31. Oluwatuyi, O. E., Ng, K. W., Wulff, S. S., & Rajapakshage, R. (2023). Optimal site investigation through combined geological and property uncertainties analysis. Geotechnical and Geological Engineering, 41(4), 2377–2393. <a href="https://doi.org/10.1007/s10706-023-02403-x" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1007/s10706-023-02403-x</a>
  32. Padala, S. S., & Maheswari, J. U. (2023). Modelling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), 2369–2390. <a href="https://doi.org/10.6084/m9.figshare.19584091.v1" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.6084/m9.figshare.19584091.v1</a>
  33. Partner ESI. (2019). Geotechnical investigations. https://www.partneresi.com/services/geotechnical-investigations
  34. Paul, A., & Uma Maheswari, J. (2023). Modelling changes in MDM: Case study of irrigation pipeline project. In A. Chakrabarti, & V. Singh (Eds.), Design in the Era of Industry 4.0, Volume 3. ICORD 2023. Smart Innovation, Systems and Technologies, 346 (pp. 1203–1217). Springer Nature Singapore. <a href="https://doi.org/10.1007/978-981-99-0428-0_98" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1007/978-981-99-0428-0_98</a>
  35. Pham, T. (2023). Risk identification and mitigation in data analytics outsourcing: the vendor’s perspective [Master’s thesis, LUT University]. https://lutpub.lut.fi/bitstream/10024/166021/1/mastersthesis_pham_tran.pdf
  36. Rakasiwi, G. (2023). Analysis of factors causing contract change orders (CCO) in the construction project of the city furniture center building in Surakarta. International Research Journal of Innovations in Engineering and Technology, 7(4), Article 78. https://irjiet.com/common_src/article_file/1682345424_74cf2960a8_7_irjiet.pdf
  37. Robles, J. (2023). Fast-track projects with cost and schedule overruns a supply chain management perspective [Doctoral dissertation, Capella University].
  38. Rosenberg, L., Mosthaf, K., Broholm, M. M., Fjordbøge, A. S., Tuxen, N., Kerrn-Jespersen, I. H., Rønde, V., & Bjerg, P. L. (2023). A novel concept for estimating the contaminant mass discharge of chlorinated ethenes emanating from clay till sites. Journal of Contaminant Hydrology, 252, Article 104121. <a href="https://doi.org/10.1016/j.jconhyd.2022.104121" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.jconhyd.2022.104121</a>
  39. Rossi, J. (2023). Improving customer change order management–creating more value through customer centricity and professional change order management. Case: ABB Oy induction machines [Master’s thesis, University of Vaasa].
  40. Sanchez-Garrido, A. J., Navarro, I. J., & Yepes, V. (2022). Multi-criteria decision-making applied to the sustainability of building structures based on Modern Methods of Construction. Journal of Cleaner Production, 330, Article 129724. <a href="https://doi.org/10.1016/j.jclepro.2021.129724" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.jclepro.2021.129724</a>
  41. Shabani Ardakani, S., & Nik-Bakht, M. (2021). Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1), Article 04020155. <a href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0001974" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)CO.1943-7862.0001974</a>
  42. Shoar, S., Yiu, T. W., Payan, S., & Parchamijalal, M. (2023). Modelling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective. Engineering, Construction and Architectural Management, 30(2), 365–392. <a href="https://doi.org/10.1108/ECAM-08-2021-0732" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/ECAM-08-2021-0732</a>
  43. Shrestha, K., Shrestha, P. P., & Lohoud, M. (2023). Critical factors affecting the bid cost of building construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(3), Article 04523018. <a href="https://doi.org/10.3390/buildings12060849" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.3390/buildings12060849</a>
  44. Sing, M. C., Edwards, D. J., Leung, A. W., Liu, H., & Roberts, C. J. (2022). A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), 3754–3774. <a href="https://doi.org/10.1108/ECAM-09-2020-0726" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/ECAM-09-2020-0726</a>
  45. Smith, J., Edwards, D. J., Martek, I., Chileshe, N., Hayhow, S., & Roberts, C. J. (2023). The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), 655–689. <a href="https://doi.org/10.1108/JEDT-12-2020-0507" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/JEDT-12-2020-0507</a>
  46. Tariq, J., & Gardezi, S. S. S. (2023). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal, 14(1), Article 101815. <a href="https://doi.org/10.1016/j.asej.2022.101815" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.asej.2022.101815</a>
  47. Tiew, S. Y., Hashim, H. A., & Zolkafli, U. K. B. (2022). Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), 29–43. <a href="https://doi.org/10.15641/jcbm.5.2.1253" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.15641/jcbm.5.2.1253</a>
  48. Tomh, M. A. (2022). Investigating the factors affecting the design change in construction industry in UAE. International Journal for Global Academic & Scientific Research, 1(4), 60–73. <a href="https://doi.org/10.55938/ijgasr.v1i4.32" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.55938/ijgasr.v1i4.32</a>
  49. Umuhoza, E., Bitamba, B. F., & An, S. H. (2023). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), 1264–1275. <a href="https://doi.org/10.1080/15623599.2021.1967576" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1080/15623599.2021.1967576</a>
  50. Wang, J., Zhang, S., Fenn, P., Luo, X., Liu, Y., & Zhao, L. (2023a). Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1), Article 03122010. <a href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0002419" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/(ASCE)CO.1943-7862.0002419</a>
  51. Wang, J., Zhang, S., Jin, R., Fenn, P., Yu, D., & Zhao, L. (2023b). Identifying critical dispute causes in the construction industry: A cross-regional comparative study between China and the UK. Journal of Management in Engineering, 39(2), Article 04022072. <a href="https://doi.org/10.1061/JMENEA.MEENG-4943" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1061/JMENEA.MEENG-4943</a>
  52. Yap, J. B. H., Lim, B. L., Skitmore, M., & Gray, J. (2022). Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), 800–822. <a href="https://doi.org/10.1108/JEDT-10-2020-0413" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/JEDT-10-2020-0413</a>
  53. Zhao, Y., Chen, W., Arashpour, M., Yang, Z., Shao, C., & Li, C. (2022). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), 1753–1776. <a href="https://doi.org/10.1108/ECAM-12-2020-1050" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1108/ECAM-12-2020-1050</a>
  54. Zhong, S., Elhegazy, H., & Elzarka, H. (2022). Key factors affecting the decision-making process for buildings projects in Egypt. Ain Shams Engineering Journal, 13(3), Article 101597. <a href="https://doi.org/10.1016/j.asej.2021.09.024" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1016/j.asej.2021.09.024</a>
DOI: https://doi.org/10.2478/bjreecm-2023-0014 | Journal eISSN: 2255-9671 | Journal ISSN: 2255-9604
Language: English
Page range: 221 - 239
Submitted on: Sep 18, 2023
Accepted on: Sep 28, 2023
Published on: Nov 1, 2023
Published by: Riga Technical University
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2023 Benjamin Boahene Akomah, Zakari Mustapha, Justice William Mensah, Roland William Lawson, published by Riga Technical University
This work is licensed under the Creative Commons Attribution 4.0 License.