Have a personal or library account? Click to login
Improving Labour Productivity in Ghanaian Building Construction Projects Cover

References

  1. Abramovsky, L., Bond, S., Harrison, R., & Simpson, H. (2005). Election Briefing Note No. 6. London, United Kingdom: The Institute for Fiscal Studies.
  2. Adams, S. (1989). Practical Buildability. Construction Industry Research and Information Association (CIRIA), Building Design Report.
  3. Agyarkwah-Baah, A., & Fugar, F. DK. (2010). Delays in Building Construction in Ghana. Australian Journal of Construction Economics and Building, 10(1/2), 103–116. https://doi.org/10.5130/ajceb.v10i1/2.159210.5130/ajceb.v10i1/2.1592
  4. Akomah, B. B., Boakye, N. A., & Fugar, F. D. K. (2010). Safety on construction sites: The role of the employer and employee. In S. Laryea, R. Leiringer, & W. Hughes (Eds.). Proceedings of the West Africa Built Environment Research (WABER) Conference (pp. 477–49). Accra, Ghana.
  5. Akomah, B. B., Zakari, M., & Enoch Ayeh, E. (2020). Impact of Cost of Construction Projects in Cape Coast Metropolis. Buletinul Institutului Politehnic Din Iaşi, 66(1), 95–112.
  6. Alinaitwe, H., Mwakali, J., & Hanson, B. (2007). Factors Affecting the Productivity of Building Craftsmen - Studies of Uganda. Journal of Civil Engineering and Management, 13(3), 169–176. https://doi.org/10.3846/13923730.2007.963643410.3846/13923730.2007.9636434
  7. Allmon, E., Haas, C. T., Borcherding, J. D., & Goodrum, P. M. (2000). U.S. Construction Labour Productivity Trends, 1970–1998. Journal of Construction Engineering and Management, 126(2), 97–104. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(97)10.1061/(ASCE)0733-9364(2000)126:2(97)
  8. Amoah, P., Ahadzie, D. K., & Dansoh, A. (2007). The Factors Affecting Construction Performance: The Perspective of Small-Scale in Ghana Building Contractors. The Ghana Surveyor Journal, 4(1), 41–48.
  9. Asibuodu, U. R., & Stewart, P. (2015). Investigating Factors that Influence Construction Productivity - A Review of the Literature. United Kingdom: University of Salford Manchester.
  10. Banks, G. (2012). Productivity policies: the ‘to do’ list. Economic and Social Outlook Conference, ‘Securing the Future’. Melbourne, Australia: Productivity Commission.
  11. Barg, J. E., Ruparathna, R., Mendis, D., & Hewage, K. N. (2014). Motivating Workers in Construction. Journal of Construction Engineering, 1–11. https://doi.org/10.1155/2014/70308410.1155/2014/703084
  12. Bernard, H. R. (2002). Research Methods in Anthropology: Qualitative and Quantitative Methods (3rd ed.). California, USA: Alta Mira Press.
  13. Cetin, I. (2013). Motivation and its impact on labour productivity at hotel business “a conceptual study”. International Journal of New Trends in Arts, Sports & Science Education, 2(1), 70–79.
  14. Cox, R. F. Issa, R. R. A. and Koblegard, K. (2005). Management’s perception of key behavioural indicators for construction. Journal of Construction Engineering and Management, 131(3), 368–376. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(368)10.1061/(ASCE)0733-9364(2005)131:3(368)
  15. Dai, J., Goodrum, P. M., & Maloney, W. F. (2009a). Construction Craft Workers’ Perceptions of the Factors Affecting their Productivity. Journal of Construction Engineering and Management, 135(3), 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217)10.1061/(ASCE)0733-9364(2009)135:3(217)
  16. Dai, J., Goodrum, P. M., Maloney, W. F., & Srinivasan, C. (2009b). Latent Structures of the Factors Affecting Construction Labour Productivity. Journal of Construction Engineering and Management, 135(5), 397–406. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:5(397)10.1061/(ASCE)0733-9364(2009)135:5(397)
  17. Dozzi, S., & AbouRizk, S. (1993). Productivity in construction. Ottawa, Canada: National Research Council.
  18. Durdyev, S., Ismail, S., & Kandymov, N. (2018). Structural Equation Model of the Factors Affecting Construction Labour Productivity. Journal of Construction Engineering and Management, 144(4), 04018007. https://doi.org/10.1061/(ASCE)CO.1943-7862.000145210.1061/(ASCE)CO.1943-7862.0001452
  19. Durdyev, S., & Mbachu, J. (2011). On-Site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures. CEB, 11(3), 18–33. https://doi.org/10.5130/AJCEB.v11i3.212010.5130/AJCEB.v11i3.2120
  20. Franklin, J. (2017). Behavioural factors in human resource planning. Retrieved from https://bizfluent.com/list-6557409-behavioral-factors-human-resource-planning.html
  21. Gratton, L. (2000). Living strategy: putting people at the heart of corporate purpose. London, United Kingdom: Pearson Education Limited.
  22. Guo, B. H., Yiu, T. W., & González, V. A. (2015). Identifying Behaviour Patterns of Construction Safety Using System Archetypes. Accident Analysis Prevention, 80, 125–141. https://doi.org/10.1016/j.aap.2015.04.00810.1016/j.aap.2015.04.008
  23. Hamza, M., Shahid, S., Bin Hainin, M. R., & Nashwan, M. S. (2019). Construction Labour Productivity: Review of Factors Identified. International Journal of Construction Management, 19, 1–13. https://doi.org/10.1080/15623599.2019.162750310.1080/15623599.2019.1627503
  24. Hanna, A., Chang, C-K., Lackney, J., & Sullivan, K. (2007). Impact of Overmanning on Mechanical and Sheet Metal Labour Productivity. Journal of Construction Engineering and Management, 133(1), 22–28. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(22)10.1061/(ASCE)0733-9364(2007)133:1(22)
  25. Hawthorne, M. (2017). Objectives of motivation in the workplace. Retrieved from https://bizfluent.com/info-8747634-objectives-motivation-workplace.html
  26. Hewage, K. N., & Ruwanpura, J. Y. (2007). Carpentry Workers Issues and Efficiencies Related to Construction Productivity in Commercial Construction Projects in Alberta. Journal of Civil Engineering Canadian, 33(8), 1075–1089. https://doi.org/10.1139/l06-05010.1139/l06-050
  27. Horner, R. M. W., Talhouni, B. T., & Thomas, H. R. (1989). Preliminary results of major labour productivity monitoring programme. Paper presented at 3rd Yugoslavian Symposium on Construction Management, Cavtat., 18–28.
  28. HSE (2017). Measuring performance. Retrieved from https://www.hse.gov.uk/managing/delivering/check/measuring-performance.htm
  29. Jarkas, A. M. (2010). The Impacts of Buildability Factors on Formwork Labour Productivity of Columns. Journal of Civil Engineering and Management, 16(4), 471–483. https://doi.org/10.3846/jcem.2010.5310.3846/jcem.2010.53
  30. Jergeas, G. (2009). Improving Construction Productivity on Alberta Oil and Gas Capital Projects. Alberta, Canada: Alberta Finance and Enterprise.
  31. Jha. K. N. (2011). Construction project management: Theory and practice. Delhi, India: Pearson Education India.
  32. Khaled M. EI-G., & Mostafa E. S. (2011). Towards Improving Construction Labour Productivity and Projects Performance. Alexandria Engineering Journal, 50, 321–330. https://doi.org/10.1016/j.aej.2012.02.00110.1016/j.aej.2012.02.001
  33. Lewis, J. L., & Sheppard, S. R. J. (2006). Culture and Communication: Can Landscape Visualization Improve Forest Management Consultation with Indigenous Communities? Landscape and Urban Planning, 77(3), 291–313. https://doi.org/10.1016/j.landurbplan.2005.04.00410.1016/j.landurbplan.2005.04.004
  34. Mazin, R. (2017). Factors that affect employee performance in an organization. Retrieved from https://bizfluent.com/how-7630782-improve-team-work.html
  35. Mctague, B., & Jergeas, G. (2002). Productivity improvements on Alberta major construction projects. Construction Productivity Improvement Report, Project Evaluation Tool. Alberta, Canada: Alberta Economic Development.
  36. Meier, K. S. (2020). How Does Behavior Affect Work Performance? Retrieved from https://work.chron.com/behavior-affect-work-performance-4476.html
  37. Muriel, A., Phillips, D., & Sibieta, L. (2010). Living Standards, Inequality and Poverty: Labour’s Record, IFS 2010 Election Briefing Note 2 (IFS BN89). Retrieved from http://www3.weforum.org/docs/WEF_Forum_IncGrwth.pdf
  38. Nimo Boakye, A., Akomah, B. B., & Fugar, F. D. K. (2010). Ensuring the Health and Safety of Ghanaian Construction Workers by Decentralised Government Agencies: An Exploratory Study. In S. Laryea, R. Leiringer, & W. Hughes (Eds.). Proceedings of the West Africa Built Environment Research (WABER) Conference (pp. 295–304). Accra, Ghana.
  39. Organization for Economic Cooperation and Development. (2015). The future of productivity. Joint Economics Department and the Directorate for Science, Technology and Innovation Policy Note. Retrieved from http://www.oecd.org/economy/growth/OECD-2015-The-future-of-productivity-book.pdf
  40. Peles C. (1987). Productivity analysis - A case study: Transaction of the American Association of Cost Engineers, 31st Annual Meeting. Atlanta, USA.
  41. Pinder, C. C. (1998). Work Motivation in Organizational Behaviour. Prentice Hall, Upper Saddle River, NJ, USA, 1998.
  42. Ritz, G. J. (1994). Total Construction Project Management. Boston, United States of America: McGraw-Hill Companies.
  43. Sezer, A. A. (2016). Construction performance measurement: Site managers in refurbishment projects (Doctoral dissertation). Chambers University of Technology, Göteborg, Sweden.
  44. Shehata, M. E., & El-Gohary, K. M. (2011). Towards improving construction labour productivity and projects’ performance. Alexandria Engineering Journal, 50(4), 321–330. https://doi.org/10.1016/j.aej.2012.02.00110.1016/j.aej.2012.02.001
  45. Shivam, N. (2020). Work Measurement: Definition, Objectives and Techniques Retrieved from https://www.economicsdiscussion.net/engineering-economics/work-measurement-definition-objectives-and-techniques/21707
  46. Siebers, P-O., Aickelin, U., Battisti, G., Celia, H., Clegg, C., Fu, X., De Hoyos, R., Iona, A., Petrescu, A., & Peixoto, A. (2008). Enhancing Productivity: The Role of Management Practices. Advanced Institute of Management Research Paper No. 065, 1–29. https://doi.org/10.2139/ssrn.130960510.2139/ssrn.1309605
  47. Soekiman, A., Pribadi, K. S., Soemardi, B. W., & Wirahadikusumah, R.D. (2011). Factors relating to labour productivity affecting the project schedule performance in Indonesia. Procedia Engineering, 14, 865–873. https://doi.org/10.1016/j.proeng.2011.07.11010.1016/j.proeng.2011.07.110
  48. Tongoco, D. C. (2007). Purposive Sampling as a Tool for Informant Selection. Ethnobotany Research & Applications, 5, 147–158. https://doi.org/10.17348/era.5.0.147-15810.17348/era.5.0.147-158
  49. The Institute of Management Services (2020). Work measurement. Retrieved from https://www.ims-productivity.com/page.cfm/content/Work-Measurement/
  50. Tucker, R. L. (1986). Management of Construction Productivity. Journal of Management in Engineering, 2(3), 148–156. https://doi.org/10.1061/(ASCE)9742-597X(1986)2:3(148)10.1061/(ASCE)9742-597X(1986)2:3(148)
  51. Watkins, M., Mukherjee, A., Onder, N., & Mattila, K. (2009). Using Agent-Based Modelling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(7), 657–667. https://doi.org/10.1061/(ASCE)CO.1943-7862.000002210.1061/(ASCE)CO.1943-7862.0000022
DOI: https://doi.org/10.2478/bjreecm-2020-0011 | Journal eISSN: 2255-9671 | Journal ISSN: 2255-9604
Language: English
Page range: 152 - 169
Published on: Nov 18, 2020
Published by: Riga Technical University
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2020 Benjamin Boahene Akomah, Roland William Lawson, Emmanuel Nana Jackson, published by Riga Technical University
This work is licensed under the Creative Commons Attribution 4.0 License.