Ayalew, T., Dakhli, Z., Lafhaj, Z. (2016). Assessment on Performance and Challenges of Ethiopian Construction Industry. Journal of Architecture and Civil Engineering, 2, 1–11.
Cajzek, R., Klanšek, U. (2016). Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs. Technical Gazette, 23(1), 9–18.10.17559/TV-20140108112928
Christodoulou, S. E., Tezias, E. S., Galaras, K. A. (2012). Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project’s duration and cost. International Journal of Project Organisation and Management, 4(4), 322–338. https://doi.org/10.1504/IJPOM.2012.05032810.1504/IJPOM.2012.050328
Heinz, S., Beck, J. C. (2011). Solving resource allocation/scheduling problems with constraint integer programming. Association for the Advancement of Artificial Intelligence. Retrieved from https://tidel.mie.utoronto.ca/pubs/cip-coplas11.pdf
Ibrahim, M., Amund, B., Nabil, D. (2012). Causes of Delay in Road Construction Projects. Journal of Management in Engineering (ASCE), 28(3), 300–310.10.1061/(ASCE)ME.1943-5479.0000096
Wubishet, J. (2004). Performances for public construction projects in developing countries: federal road & educational building projects in Ethiopia. Trondheim: Norwegian University of Science and Technology, Faculty of Social Sciences and Technology Management, Department of Industrial Economics and Technology Management.