References
- Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). “BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors.”
- Gibb, A. G. F. (1999). “Off-site Fabrication: Prefabrication, Pre-assembly, and Modularization.” Kamali, M., & Hewage, K. (2016). “Life Cycle Performance of Modular Buildings: A Critical Review.”
- Lawson, R. M., Ogden, R. G., & Bergin, R. (2012). “Application of Modular Construction in High-Rise Buildings.”
- Lluka, D. (2024). Structural Assessment for Improving Energy Efficiency in Public Buildings. Balkan Journal of Interdisciplinary Research, Vol. 10. No. 1. DOI: https://doi.org/10.2478/bjir-2024-0002
- Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2012). “Strategies for Integrating the Use of Offsite Production Technologies in Housebuilding.”
- Sacks, R., Eastman, C. M., Lee, G., & Teicholz, P. (2018). “BIM for Design Coordination: Theory and Practice.”