Increasing calculation accuracy in the design stage of a gas transportation system
By: Sorin Neacşu and Renata Rădulescu
Open Access
|Jan 2014References
- [1] M. Albulescu, S. Neacşu, C. Eparu, S. Bambo and S. Suditu, Termotehnica Revue, Supplement no. 1 (2011)
- [2] http://www.aft.com/
- [3] *** ERGEG - Capacity Allocation on European Gas Transmission Networks Pilot Framework Guideline, 10 June 2010;
- [4] *** GTE - Capacity Product Coordination First Phase Report, 27 March 2009;
- [5] *** GTE comments on - Calculation of Available Capacities: Understanding and Issues - An ERGEG Public Consultation Paper, 09 August 2007;
- [6] *** GTE position - Definition of available capacities at interconnection points in liberalized markets, 22 June 2004;
- [7] *** REGULATION (EC) No 1775/2005 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 28 September 2005 on conditions for access to the natural gas transmission networks (Text with EEA relevance)
Language: English
Page range: 61 - 66
Published on: Jan 17, 2014
Published by: Ovidius University of Constanta
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year
Related subjects:
© 2014 Sorin Neacşu, Renata Rădulescu, published by Ovidius University of Constanta
This work is licensed under the Creative Commons License.