[1] Aboelmagd, M.R. (2018), Linear programming applications in construction sites, Alexandria Engineering Journal, vol. 57, pp. 4177 − 4187.10.1016/j.aej.2018.11.006
[2] Bogdan, M. (2018), Some comments on a linear programming problem, Stud. Univ. Babeş-Bolyai Math., vol. 63, pp. 269 − 284.10.24193/subbmath.2018.2.10
[4] Ebrahimnejad, A., Nasseri, S.H. (2010), A dual simplex method for bounded linear programmes with fuzzy numbers, Int. J. Mathematics in Operational Research, vol. 2, pp. 762 − 779.10.1504/IJMOR.2010.035498
[5] Garaix, T., Gondran, M., Lacomme, P., Mura, E., Tchernev, N. (2018), Workforce scheduling linear programming formulation, IFAC-PapersOnLine, vol. 51, pp. 264 − 269.10.1016/j.ifacol.2018.08.289
[7] Rahman, S.A., Ansari, M.S., Moinuddin, A.A. (2012), Solution of linear programming problems using a neural network with non-linear feedback, Radioengineering, vol. 21, pp. 1171 − 1177.
[8] SubbaReddy, J., Bhavani, M., Kartheek, G., Venkata Somi Reddy, J. (2018), Optimization of a product mix in a paper mill-a case study, International J. of Adv. Engineering and Research Development, vol. 5, pp. 2107 − 2112.
[9] Wu, J., Ge, X. (2012), Optimization research of generation investment based on linear programming model, Physics Procedia, vol. 24, pp. 1400−1405.10.1016/j.phpro.2012.02.208