Skip to main content
Have a personal or library account? Click to login
Scheduling problems with a common due window assignment: A survey Cover
Open Access
|Mar 2013

References

  1. Azizoglu, M. and Webster, S. (1997). Scheduling about an unrestricted common due window with arbitrary earliness/tardiness penalty rates,(11): 1001-1006.
  2. Baker, K.R. and Scudder, G.D. (1990). Sequencing with earliness and tardiness penalties: A review,(1): 22-36.
  3. Biskup, D. (1999). Single-machine scheduling with learning considerations,(1): 173-178.
  4. Chen, P., Wu, C.-C. and Lee, W.-C. (2006). A bi-criteria two-machine flowshop scheduling problem with a learning effect,(9): 1113-1125.
  5. Cheng, T., Yang, S.-J. and Yang, D.-L. (2010).
  6. Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity,(1): 154-161, DOI.10.1016/j.ijpe.2010.10.005.
  7. Dondeti, V.R. and Mohanty, B.B. (1998). Impact of learning and fatigue factors on single machine scheduling with penalties for tardy jobs,(3): 509-524.
  8. Garey, M. and Johnson, D. (1978). Strong NP-completness results:Motivation, examples, and implications,(3): 499-508.
  9. Gáspár, P., Szabó, Z and Bokor, J. (2012). LPV design of fault-tolerant control for road vehicles,(1): 173-182, DOI: 10.2478/v10006-012-0013-x.
  10. Gordon, V., Proth, J.-M. and Chu, C. (2002). A survey of the state-of-the-art of common due date assignment and scheduling research,(1): 1-25.
  11. Graham, R.L., Lawler, E.L., Lenstra, J.K. and Kan, A.H.G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey,P.L. Hammer, E.L.
  12. Johnson and B.H. Korte (Eds.),, Vol. 5, Elsevier, Amsterdam, pp. 287-326.
  13. Gunn, T. (1992). Logistics planning,(1): 16-28.
  14. Hall, N. and Posner, M. (1991). Earliness-tardiness scheduling problems. I:Weighted deviation of completion times about a common due date,(5): 836-846.
  15. Janiak, A., Janiak, W. and Marek, M. (2009). Single processor scheduling problems with various models of a due window assignment,(1): 95-101.
  16. Janiak, A., Kovalyov, M. and Marek, M. (2007). Soft due window assignment and scheduling on parallel machines,(5): 614-620.
  17. Janiak, A., Krysiak, T. and Trela, R. (2011). Scheduling problems with learning and aging effects: A survey,(1-2): 19-36.
  18. Janiak, A. and Marek, M. (2003). Scheduling problems with optimal due interval assignment subject to some generalized criteria,U. Leopold-Wildburger, F. Rendl and G. Wäscher (Eds.),, Springer-Verlag, Berlin/Heidelberg, pp. 217-222.
  19. Janiak, A. and Marek, M. (2004). Property of symmetry for some single processor scheduling problems with due interval assignment,(2): 97-107.
  20. Janiak, A. and Winczaszek, M. (2003). An optimal algorithm for a single processor scheduling problem with a common due window,pp. 1213-1216 .
  21. Janiak, A. and Winczaszek, M. (2004). Scheduling problem with nonlinear earliness-tardiness penalty functions,Z. Bubnicki, O. Hryniewicz and J. Weglarz (Eds.),, Academic Publishing House EXIT, Warsaw, pp. 261-270, (in Polish).
  22. Janiak, A. and Winczaszek, M. (2005a). Optimal algorithm for parallel processor scheduling problem with due window assignment,pp. 1085-1089.
  23. Janiak, A. and Winczaszek, M. (2005b). A single processor scheduling problem with a common due window assignment,H. Fleuren, D. den Hertog and P. Kort (Eds.),, Springer-Verlag, Berlin, pp. 213-220.
  24. Janiak, A. and Winczaszek, M. (2006). Common due window assignment in parallel processor scheduling problem with nonlinear penalty functions,R. Wyrzykowski, I.
  25. Dongarra, N. Meyer and J. Waśniewski (Eds.),, Springer-Verlag, Berlin, pp. 132-139.
  26. Kołodziej, J. and Xhafa, F. (2011). Modern approaches to modeling user requirements on resource and task allocation in hierarchical computational grids,(2): 243-257, DOI: 10.2478/v10006-011-0018-x.
  27. Koulamas, C. (1996). Single-machine scheduling with time windows and earliness/tardiness penalties,(1): 190-202.
  28. Kramer, F.-J. and Lee, C.-Y. (1993). Common due-window scheduling,(4): 262-275.
  29. Lauff, V. and Werner, F. (2004). Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey,(5-6): 637-655.
  30. Lee, C. (1991). Earliness-tardiness scheduling problems with constant size of due date window,Vol. 4, Industrial and Systems Engineering Department, University of Florida, Gainesville, FL, pp. 262-275.
  31. Liman, S.D., Panwalkar, S.S. and Thongmee, S. (1997). A single machine scheduling problem with common due window and controllable processing times,: 145-154.
  32. Liman, S.D., Panwalkar, S.S. and Thongmee, S. (1998). Common due window size and location determination in a single machine scheduling problem,(9): 1007-1010.
  33. Limana, S. and Ramaswamy, S. (1994). Earliness-tardiness scheduling problems with a common delivery window,(4): 195-203.
  34. Meilijson, I. and Tamir, A. (1984). Minimizing flow time on parallel identical processors with variable unit processing time,(2): 440-448.
  35. Mosheiov, G. (2001). A due-window determination in minmax scheduling problems,(1): 107-123.
  36. Mosheiov, G. and Oron, D. (2004). Due-window assignment with unit processing-time jobs,(7): 1005-1017.
  37. Mosheiov, G. and Sarig, A. (2008). A due-window assignment problem with position-dependent processing times,(7): 997-1003.
  38. Mosheiov, G. and Sarig, A. (2009a). Minmax scheduling problems with a common due-window,(6): 1886-1892.
  39. Mosheiov, G. and Sarig, A. (2009b). Scheduling a maintenance activity and due-window assignment on a single machine,(9): 2541-2545.
  40. Mosheiov, G. and Sarig, A. (2010). Scheduling with a common due-window: Polynomially solvable cases,(8): 1492-1505.
  41. Mosheiov, G. and Sarig, A. (2011). A note: A due-window assignment problem on parallel identical machines,(1): 238-241.
  42. Wang, J-B., and Xia, Z.-Q. (2005). Flow-shop scheduling with a learning effect,(11): 1325-1330.
  43. Wang, J.-B. (2006). A note on scheduling problems with learning effect and deteriorating jobs,(12): 827-833.
  44. Wang, J.-B. and Wang, C. (2011). Single-machine due-window assignment problem with learning effect and deteriorating jobs,(8): 4017-4022.
  45. Weng, M. and Ventura, J. (1996). A note on common due window scheduling,(2): 194-200.
  46. Winczaszek,M. (2006)., Ph.D. thesis, Wrocław University of Technology, Wrocław, (in Polish).
  47. Wright, T.P. (1936). Factors affecting the cost of airplanes,(2): 122-128.
  48. Wu, C.-C. (2005). A makespan study of the two-machine flowshop scheduling problem with a learning effect,(1): 13-25.
  49. Wu, Y. and Lai, K. (2007). A production scheduling strategy with a common due window,(2): 215-221.
  50. Wu, Y. and Wang, D. (1999). Optimal single-machine scheduling about a common due window with earliness/tardiness and additional penalties,(12): 1279-1284.
  51. Yang, S.-J. (2010). Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration,(7): 3321-3329.
  52. Yang, S.-J., Yang, D.-L. and Cheng, T. (2010). Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance,(8): 1510-1514.
  53. Yeung, W., Oguz, C. and Cheng, T. (2001a). Minimizing weighted number of early and tardy jobs with a common due window involving location penalty,(1-4): 33-54.
  54. Yeung, W., Oguz, C. and Cheng, T. (2001b). Single-machine scheduling with a common due window,(2): 157-175.
  55. Zhao, C. and Tang, H. (2010). A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity,(6): 1300-1303, DOI:10.1016/j.cor.2010.04.006.
DOI: https://doi.org/10.2478/amcs-2013-0018 | Journal eISSN: 2083-8492 | Journal ISSN: 1641-876X
Language: English
Page range: 231 - 241
Published on: Mar 26, 2013
Published by: University of Zielona Góra
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2013 Adam Janiak, Tomasz Kwiatkowski, Maciej Lichtenstein, published by University of Zielona Góra
This work is licensed under the Creative Commons License.