Tab.1.
Comparison of accurate, CNPS along with CPS for problem 3.1 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | |
|---|---|---|---|---|---|
| 0 | 1 | 1 | 0.00E-00 | 1 | 0.00E-00 |
| 0.2 | 0.818730753 | 0.817688874 | 1.04E-03 | 0.817618382 | 1.11E-03 |
| 0.4 | 0.670320046 | 0.668633087 | 1.69E-03 | 0.668558559 | 1.76E-03 |
| 0.6 | 0.548811636 | 0.547122919 | 1.69E-03 | 0.547064978 | 1.75E-03 |
| 0.8 | 0.449328964 | 0.448284237 | 1.04E-03 | 0.448246958 | 1.08E-03 |
| 1 | 0.367879441 | 0.367879441 | 0.00E-00 | 0.367879441 | 0.00E-00 |
Tab. 2.
Comparison of accurate, CNPS along with CPS for problem 3.1 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | [6] | |
|---|---|---|---|---|---|---|
| 0 | 1 | 1 | 0.00E-00 | 1 | 0.00E-00 | 0.00E-00 |
| 0.1 | 0.904837418 | 0.904837481 | 6.27E-08 | 0.904812814 | 2.46E-05 | 3.82E-06 |
| 0.2 | 0.818730753 | 0.818730875 | 1.22E-07 | 0.818688854 | 4.19E-05 | 1.36E-05 |
| 0.3 | 0.740818221 | 0.740818391 | 1.70E-07 | 0.740765438 | 5.28E-05 | 2.49E-05 |
| 0.4 | 0.670320046 | 0.670320248 | 2.02E-07 | 0.670262025 | 5.80E-05 | 3.31E-05 |
| 0.5 | 0.60653066 | 0.606530874 | 2.14E-07 | 0.606472401 | 5.83E-05 | 3.50E-05 |
| 0.6 | 0.548811636 | 0.548811841 | 2.05E-07 | 0.548757603 | 5.40E-05 | 3.01E-05 |
| 0.7 | 0.496585304 | 0.496585478 | 1.74E-07 | 0.496539521 | 4.58E-05 | 2.03E-05 |
| 0.8 | 0.449328964 | 0.44932909 | 1.26E-07 | 0.449295105 | 3.39E-05 | 9.57E-06 |
| 0.9 | 0.40656966 | 0.406569726 | 6.61E-08 | 0.406551127 | 1.85E-05 | 2.11E-06 |
| 1 | 0.367879441 | 0.367879441 | 0.00E-00 | 0.367879441 | 0.00E-00 | 0.00E-00 |

Fig. 1.
Comparison of AEs of CNPS and CPS with [6] of problem 3.1 at

Fig. 2.
Graphically representation of Accurate solution, CNPS outcome, CPS outcome and their Absolute Errors for problem 3.1 at
Tab. 3.
Comparison of accurate, CNPS along with CPS for problem 3.2 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | |
|---|---|---|---|---|---|
| 0 | 1 | 1 | 0.00E-00 | 1 | 0.00E-00 |
| 0.2 | 0.654984602 | 0.654548343 | 4.36E-04 | 0.653822489 | 1.16E-03 |
| 0.4 | 0.402192028 | 0.401485267 | 7.07E-04 | 0.400509549 | 1.68E-03 |
| 0.6 | 0.219524654 | 0.218816219 | 7.08E-04 | 0.217928602 | 1.60E-03 |
| 0.8 | 0.089865793 | 0.089426899 | 4.39E-04 | 0.088878968 | 9.87E-04 |
| 1 | 0 | 0 | 0.00E-00 | 0 | 0.00E-00 |
Tab. 4.
Comparison of accurate, CNPS along with CPS for problem 3.2 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | [6] | |
|---|---|---|---|---|---|---|
| 0 | 1 | 1 | 0.00E-00 | 1 | 0.00E-00 | 0.00E-00 |
| 0.1 | 0.814353676 | 0.814349741 | 0.814016517 | 3.37E-04 | 3.94E-06 | 1.91E-05 |
| 0.2 | 0.654984602 | 0.654977145 | 0.654367593 | 6.17E-04 | 7.46E-06 | 6.81E-05 |
| 0.3 | 0.518572754 | 0.518562529 | 0.517747628 | 8.25E-04 | 1.02E-05 | 1.24E-04 |
| 0.4 | 0.402192028 | 0.402180054 | 0.401241892 | 9.50E-04 | 1.20E-05 | 1.64E-04 |
| 0.5 | 0.30326533 | 0.303252787 | 0.302279968 | 9.85E-04 | 1.25E-05 | 1.72E-04 |
| 0.6 | 0.219524654 | 0.219512766 | 0.218594693 | 9.30E-04 | 1.19E-05 | 1.46E-04 |
| 0.7 | 0.148975591 | 0.148965506 | 0.148186139 | 7.89E-04 | 1.01E-05 | 9.70E-05 |
| 0.8 | 0.089865793 | 0.089858479 | 0.089290229 | 5.76E-04 | 7.31E-06 | 4.49E-05 |
| 0.9 | 0.040656966 | 0.040653124 | 0.040351558 | 3.05E-04 | 3.84E-06 | 9.44E-06 |
| 1 | 0 | 0 | 0 | 0.00E-00 | 0.00E-00 | 0.00E-00 |

Fig. 3.
Comparison of AEs of CNPS and CPS with [6] of problem 3.2 at

Fig. 4.
Graphically representation of Accurate solution, CNPS outcome, CPS outcome and their Absolute Errors for problem 3.2 at
Tab. 5.
Comparison of accurate, CNPS along with CPS for problem 3.3 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | [6] | |
|---|---|---|---|---|---|---|
| 0 | 1 | 1 | 1 | 0.00E-00 | 0.00E-00 | 0.00E-00 |
| 0.1 | 1.105170918 | 1.105171098 | 1.105120542 | 5.04E-05 | 1.80E-07 | 3.82E-06 |
| 0.2 | 1.221402758 | 1.221403102 | 1.221310719 | 9.20E-05 | 3.43E-07 | 1.35E-05 |
| 0.3 | 1.349858808 | 1.349859281 | 1.349734356 | 1.24E-04 | 4.73E-07 | 2.64E-05 |
| 0.4 | 1.491824698 | 1.491825254 | 1.49167782 | 1.47E-04 | 5.56E-07 | 3.85E-05 |
| 0.5 | 1.648721271 | 1.648721853 | 1.648562907 | 1.58E-04 | 5.82E-07 | 4.64E-05 |
| 0.6 | 1.8221188 | 1.82211935 | 1.821961083 | 1.58E-04 | 5.50E-07 | 4.70E-05 |
| 0.7 | 2.013752707 | 2.01375317 | 2.01360923 | 1.43E-04 | 4.62E-07 | 3.94E-05 |
| 0.8 | 2.225540928 | 2.225541259 | 2.225427036 | 1.14E-04 | 3.31E-07 | 2.48E-05 |
| 0.9 | 2.459603111 | 2.459603282 | 2.45953623 | 6.69E-05 | 1.70E-07 | 8.50E-06 |
| 1 | 2.718281828 | 2.71828 | 2.71828 | 0.00E-00 | 0.00E-00 | 0.00E-00 |
Tab. 6.
Comparison of accurate, CNPS along with CPS for problem 3.3 at
| Accurate solution | CNPS solution | |error| on CNPS | CPS solution | |error| on CPS | [6] | |
|---|---|---|---|---|---|---|
| 0 | 1 | 1 | 0.00E-00 | 1 | 0.00E-00 | 0.00E-00 |
| 0.2 | 1.221402758 | 1.221403377 | 6.19E-07 | 1.22103274 | 3.70E-04 | 5.42E-05 |
| 0.4 | 1.491824698 | 1.491825707 | 1.01E-06 | 1.491234204 | 5.90E-04 | 1.53E-04 |
| 0.6 | 1.8221188 | 1.822119714 | 9.13E-07 | 1.821484771 | 6.34E-04 | 1.95E-04 |
| 0.8 | 2.225540928 | 2.225541357 | 4.28E-07 | 2.225083141 | 4.58E-04 | 1.04E-04 |
| 1 | 2.718281828 | 2.71828 | 0.00E-00 | 2.71828 | 0.00E-00 | 0.00E-00 |

Fig. 5.
Comparison of AEs of CNPS and CPS with [6] of problem 3.3 at

Fig. 6.
Graphically representation of Accurate solution, CNPS outcome, CPS outcome and their Absolute Errors for problem 3.3 at