The thermal diagnostics of heating systems and heat source is connected with the verification of compatibility of the required and actual power of the heat source and heating systems [1, 4]. Determining the required power is one of the tasks of thermal heat source diagnostics. The need to perform such diagnostics periodically is due to national regulations and standards and the directives of the European Parliament and the Council of Europe. It is not always easy to determine the required heat power for existing residential building. The scale of difficulty increases with the increase in the cubic capacity and the number of building users. The lack of construction documentation for the building, lack of knowledge about the composition of the layered construction partitions, forming the outer coating of the heated space, aging of materials, moisture prevents the appropriate calculations. The complete or partial replacement of windows by building users and the introduction of heterogeneous windows of varying degrees of thermal resistance and air tightness make it difficult to correctly assess the heat demand by calculation methods. In residential buildings, especially built more than 15 years ago, natural ventilation is usually used.
In [4] there is included a procedure for determining the required heat source power based on a long-term measurement that includes determining seasonal heat consumption and determining the heat gains and loss of the temperature balance of the building. The problem of determining the heat demand of buildings and its accuracy, also determining the demand (consumption) or the required power of the heat source taking into account the measurements are, among others, reported in works [6, 7, 15, 18-28]. This paper presents the calculation of the heat demand for the central heating installation based on short in-situ measurements in the considered building. The works [8-14, 22-27] present the idea of a proposed method based on defining the loss coefficient by the transmission HT of the building external envelope elements and the heat loss coefficient for ventilation HV together with the average ventilation change coefficient of heat loss Hb and the average daily heat gain flux from people and appliances in the building (ϕ Z,oc + ϕ Z,eq ). This method uses, among others, multiple short in- situ measurement of daily heat consumption in a building. Determining of HT and HV allows to estimate the designed heat loss of a building and further, taking into account the heat demand for hot water preparation, the required heat power of the source and the oversizing of the heating source (heating system).
The basic assumptions for determining the in-situ short-time measurements of the required heat source power for an existing building are as follows:
-
the temperatures in the heated rooms are similar to the design values of indoor air temperature,
-
the settlement of the building is similar to the design, and the individual internal heat gains from people and equipment correspond to the typical values of a residential building,
-
the current air tightness of the building determines the mass of air flowing into the building under average heating conditions close to the minimum flow resulting from hygienic needs,
-
measurements are made during the heating season in conditions close to average.
Determining the heat loss transmission and ventilation coefficients, and the number of ventilation air changes nV and the flow of internal heat gains requires knowledge of the group of values, mainly determined by measurement.
To determine value of measurements’ group, it is necessary to:
make several short (daily) measurements of the heat consumption in the building for the purpose of central heating (using a heat meter, a heat flux meter or gas meter, fuel volume oil meter, mass or volume of solid fuel) and the temperature of the heating factor and, if it is possible, daily course of external air temperature and, if there is a need, internal air temperature, and also one-time measurement of the air temperature in the basement and if necessary in the selected area in the ceiling (eg. on the border of the plaster and the construction layer of the ceiling) or control temperature measurements of the inner surface of the outer wall (walls), as well as the ceiling above top floor.
Measurements should be made for the following values:
-
–
daily heat consumption by central heating installation ϕ u , kWh,
-
–
average daily outdoor air temperature
, if necessary, indoor air temperature, -
–
average air temperature in the building’s heated space on measured days,
-
–
average daily temperature in the basement.
These measurements should be supplemented with the results obtained from the nearest meteorological station, measured routinely:
-
–
hourly daily course of outdoor air temperature te ,
-
–
hourly course of daily wind speed,
-
–
hourly daily passes of average direct and diffuse solar radiation streams,
The basis for the implementation of the method is also to determine the geometrical and structural features of the building and its functional characteristics, such as the number of inhabitants, the type and number of heated rooms, and also the type and parameters of central heating and possibly heat sources. These values are derived from the operational documentation of the building or are obtained by means of rapid thermal diagnostics of the building.
The days chosen for measurements should be these without rain and snow and with moderate wind. As measurement days also very cloudy days should be avoided as well as days with moderate outside temperatures (not above 5 (7)°C, as a midday temperature) and at the same time very sunny days, which would be accompanied by significant overheating of the rooms and / or opening of the windows by inhabitants.
On the basis of the determined measurement data, the daily thermal balances for the building under consideration can be calculated as follows:
ti – indoor temperature, °C
ϕu – measured, average utility heat flux for considered day, W,
ηtrt – efficiency of transmission, regulation and transfer of heat for central heating,
ϕsw – average heat flux for heating the ventilation air for considered day, W,
ϕz – average internal heat gains flux for considered day, W,
ηehg – efficiency of use of the internal heat gains,
ϕZ,oc – average heat gains flux from people for considered day, W,
ϕZ,eq – average heat gains flux from appliances for considered day, W,
ϕZ,tr – average for considered day, differential heat flux from solar radiation through transparent components,
nV
– number of air ventilation changes for conditions related to
VB – volume of the heated area of the building, m3,
cp – specific heat capacity of air, J/(kg·K),
ρp – density of air, kg/m3,
1....j......k – numbers of measurement days.
Several times (k-fold) daily measurement of heat consumption for purposes of central heating of a building ϕu
(
In the system of equations (2) the heat loss transmission coefficient through the partitions
Ap – surface of the envelope elements of heated building (external walls, windows and external doors, ceiling above the top floor, ceiling over the unheated basement), m2,
Up – U coefficients of the envelope elements of the heated building space, W/(m2K),
lM – length of the linear bridges of the elements of envelope limiting the volume of the building heated, m,
ΨM – coefficients of heat transmission through the linear bridges of the partitions of the building envelope limiting the heated volume of building, W/(mK).
Accepting the record
Numerous attempts to solve the system for the relevant measurement data (affected by some errors) by method of determinants or linear regression have led to results that are not physically correct.
Therefore, in relation to the system (2), another procedure was used to determine
Another form of the system (2) can be obtained if in the system equations
Further part presents procedures of designation
First method
In order to implement it, the terms
Subtracting the equations from one another should be done in such a way, that representing of all equations of the system (7) was equal and the differences in temperature
The condition of equal representation of equations (6c) in the differential equations system (7) is related to the assumption that individual equations of the system (6c) derive from their “perfect” state. The state of “perfect” equations is the form of thermal balance equation, which corresponds to the fulfillment of the required measurement conditions (fulfillment of the assumed operation of the building on the day of measurement) and the quality of measurements taken into account in the balance of values. Usually, the balance equations are deriving from the “perfect” state. If it is correct to assume that in the considered equation system there is a balance of these deviations, then in the differential equations system (7) representation of individual equations of system (6c) should be equal. If, however, in equation (6c), with the following equations ordered in decreasing temperature difference
The linear approximation
Second method
The condition for applying this procedure is as follows: in equation (6c) there are balance equations with days jj, for which
From the equations system (5c) are chosen equations with days (m … ..n), for which
The efficiency ηehg of using internal gains ϕZ takes values close to 1, so it can be assumed that ϕZ ⋅ ηehg = const.
After subtracting from the successive equations [(m … n) − (r..s)] the selected equations (r..s) of the system (8) the result is:
Subtracting the equations from one another should be done in such a way that representing all of the equations of the system (7) in the system (t) was equal, and the temperature differences
The system (7a) allows to determine the value
MT – transpose of matrix M, [MT ⋅ M]−1 - inverse matrix of the matrix product MT i M.
If omitted in the system equations (8a) of the component from Hb
causes occurring of an error - its value for the differential equations j and p is δϕjp
:
If the mean temperature difference is δtmm
:
After returning to the system (6c) and substituting to the system a designated value
The system can be presented as:
The system gives the solution:
After substituting to the system (6c) designated values
The system gives the solution:
Condition of use: system (3b, 6c) must contain a suitable number of mutually compatible equations. Designation of
Designated values
Using a transformed system (3b, 6c), after substituting Hb
and ϕZ
determined earlier, the result is:
Determination of
M – two-column matrix of coefficients at
W – column matrix of free terms in the system equations.
On this basis it is possible to estimate:
Specifying
The temperatures
ti – indoor air temperature, °C,
te (τ) – outdoor temperature measured in the hour τ, °C,
ϑi (τ) – average temperature of the inner surface of the partitions of building envelope surrounding heated space of the building, °C,
Coefficients are equal to:
Asha – the surface of the envelope surrounding the heated space of the building with bypassing the ceiling over the unheated basement,m2,
Usha – estimated average coefficient U for the envelope surrounding the heated space of the building (including thermal bridges) with bypassing the ceiling over the unheated basement W/(m2K),
Aw – surface of the building windows, m2,
Ri – average thermal resistance by the inner side of the envelope partitions of the heated building space, m2K/W,
An – partition area between the heated and unheated space of the building (ceiling above the unheated basement), m2,
Un – predicted heat transfer coefficient (including thermal bridges) for partitions between heated and unheated building space (ceiling above unheated basement), W/(m2K).
Determination of coefficients, a
1, a
2, a
3, a
4, a
5 requires the estimation of the heat loss coefficient for ventilation HV
, the coefficient Uw
for the windows in the building and the replacement heat transfer coefficient for the whole envelope of the heated building space and the temperature in the unheated space adjacent to the heated one
It is recommended to take the time interval Δτ as = 24 h ⋅ 5 = 120 h.
Determining
Determination of coefficients a3
, a4
, a5
requires, as already mentioned, the estimation of the coefficient Uw
for windows in a building in an unheated basement and the replacement heat transfer coefficient for the entire space envelope of the heated building space and the temperature in the unheated basement
The determined heat loss transmission coefficient was defined in the presented analysis as:
Asha – surface of the external envelope of the building without ceiling surface above the basement, m2,
Usha – coefficient U of the outer envelope of the building (including thermal bridges) without ceiling area above the basement, W/(m2K),
bt – coefficient of temperature reduction,
ti – indoor air temperature, °C,
tn – air temperature in basement, °C,
te – outdoor air temperature, °C,
Un – coefficient U of the ceiling above the basement, W/(m2K),
An – surface of the ceiling above the basement, m2.
The average temperature of the inner surface of the envelope partitions surrounding the heated space of the building ϑi
results from the dependence:
nk – number of hours of the time horizon in the past preceding the considered hour τ on the day of measurement,
n – succeeding hour, among hours preceding hour τ,
hi i he – impulse response functions determined by the EXODUS method [8-13, 22-26].
The assumption of the predicted coefficient Usha
(average for the coating surrounding the heated space of the building excluding the ceiling over the unheated basement) is to be understood as taking the initial value of this coefficient and further correction of it on the basis of the determined value
The next steps in assumption Usha are:
-
–
determining the windows area Aw and the characteristics of the windows used (window type (single leaf, double leaf) number of glass, type of glass and type of frame), which allows to determine the coefficient Uw ,
-
–
determining the surface of the envelope surrounding the heated space of the building omitting the ceiling over the unheated basement Asha ,
-
–
determining of the ceiling surface over the unheated basement An ,
-
–
estimation of the Un coefficient for the ceiling over an unheated basement on the basis of arrays for known conventional ceiling constructions, such as a ceiling containing a reinforced concrete slab, Ackerman ceiling or DZ-3 or, in the case of unknown structures, on the basis of a temperature measurement
in the ceiling at a specific location, e.g the borderline of the plaster (on the side of the basement), the elementary ceiling layer and the temperature in the basement and the room above the ceiling of the basement . The temperatures , and , can be treated as constant, so that the heat flow through the ceiling - as determined in time. In the case of the temperature measurements on the borderline of the internal plaster on the basement side and the homogeneous construction layer above, the value Un is derived from the dependence:(27) where:dtw – thickness of the inner plaster layer covering the ceiling above the basement, m,
λtw – heat conduction coefficient for the interior plaster covering the ceiling above the basement, W/(mK),
Rip – heat transmission resistance (on the side of the internal plaster) on the surface of the internal plaster covering the ceiling above the basement, m2K/W,
-
–
assumption based on the thermal protection requirements in force during the construction of the building or thermal modernization of the external partition coefficient Usp , except for windows and ceilings over an unheated basement,
-
–
determining on the basis of assumed assumptions and findings (resulting from e.g the technical documentation of the building or the requirements of thermal protection in force during the building or thermal modernization) of the projected coefficient Usha as:
(28)
The value Usha
be taken in the following steps is equal to:
aMT – participation of heat loss through thermal bridges in heat transmission loss, aMT ≈ 0,75,
When adopting a new value Usha
for the next calculation step, it is also necessary, in justified cases (large difference Usha
for subsequent steps) to do the correction of coefficients hi
i he
on the basis of correction of assumed state of the outer partition layer. Correction may consist in determining for a layer with the expected maximum uncertainty of its state (layers of thickness di
and current coefficient
The new value λi
of layer i is:
A similar correction can be made for layer di
thickness. In general, the correction should be based on the coefficient λi
or thickness di
, as the most uncertain values of the partition, the state of which in the most significant way influences the meaningful temperature ϑi
. In the case of significant differences in the structure and U coefficients of the vertical walls and the ceiling above the highest floor, in the presented procedure for determination of
Designated values ϕzj
(e.g from (17), (18)) may be the basis for selecting the equations included in the system. The equations (days of measurement), for which ϕzj
deviate the most from the mean value ϕzj
, should be omitted in the next approximation step. At least 8- day measurement should be done. After 7 day measurements, the obtained results should be analyzed. For this purpose, the value of the loss coefficient
nv – number of ventilation air changes estimated for the given day j, 1/h,
VB – volume of the heated area of the building, m3,
cp – specific heat capacity of air, J/(kg⋅K),
ρp – density of air, kg/m3.
On the basis of the values obtained
The final verification of the days taken for the final analysis should also be made on the basis of the estimated pre-determined average gains ϕZj , based on the measured data for the considered days and compared to the expected average daily gains.
As the basis for expected returns the indicators given in [16] can be used, and:
-
in the Regulation of the Minister of Infrastructure of 6 November 2008 on the methodology for calculating the energy characteristic of a building constituting an independent technical and utility unit as well as the way of drawing up and specifying the certificates of their energy characteristic (Journal of Laws 2008 No. 201 item 1240) as 3.2 – 6.0 W/m2 for multi-family buildings and 2.5 – 3.5 W/m2 for single-family houses
-
in the Regulation of the Minister of Infrastructure of June 3, 2014 on the methodology for calculating the energy characteristic of a building and a dwelling or a part of a building constituting an independent technical and utility unit and the manner of drawing up and specifying energy characteristic certificates (Journal of Laws of 2014, item 888) as 7.1 W/m2 for residential and 1.0 W/m2 for staircases in multi-family buildings and 6.8 W/m2 for single-family houses.
After omitting in the generalized balance equation of the system (12)
By using the set value
The efficiency of using internal gains can be determined on the basis of the total heat gains of the building: ϕu
+ ϕZ
+ ϕZ.tr
(from people, appliances and solar radiation) and heat demand for compensation of the heat loss of the building (transmission through the partitions and ventilation) ϕden
, using the dependence:
The basic stages (steps) of the method of multiple daily measurements in order to determine the values allowing to determine the thermal characteristics of a building are as follows:
-
–
on the basis of analysis of
, balance equations should be selected for the system of characteristic equations for the multiple- measurement method, -
–
the system of equations characteristic of the multiple-measurement method should be created by at least 8-day balance equations. If during the days of measurements a significant constance of operating conditions of the building was maintained (constant number of people staying in the building, moderate weathering, constant room air temperature) and reliable information has been obtained on the partitions surrounding the heated space of the building, then the number of measurement days can be reduced to the specified lower limit. In case of significant incompatibility of balance equations, steps should be taken to obtain system with more equations greater than 8,
-
–
it is profitable for a proper determination of the coefficient Hb to cover the daily temperature range
, -
–
among the days of measurement should also be a few days with
, -
–
in systems of differential equations, equations with significant temperature
differences should be created, -
–
equations of each pair of equations making up the differential equations should have approximate estimated values
, -
–
for the determination of the sought values, it is advantageous to take into account the daily heat balances of heat accumulation from solar radiation through the windows in the form of the adoption of the average daily heat gains flux from solar radiation containing ¾ of gains resulting from the radiation transmitted by windows on the considered day and ¼ of the gains from the radiation of the previous day,
-
–
in the created differential equation system there should be a equilibrium representation of balance equations in the form of the minuends and subtrahends,
-
–
determined values ϕZj can be the basis for selecting equations considered in the system. In the next approximation step equations (days of measurement), for which ϕZj deviate the most from the average value ϕZj should be omitted,
-
–
on the basis of the determined values ϕZj , the value
can be evaluated: if the values ϕZj are negative or very small, this may indicate to low value of the determined – than should be re-determined for the corrected balance equations system. Correction should consist in the elimination from the system of equations corresponding to the “wrong” values ϕZj , and possibly replacing them with the new balance equations, -
–
in the case of significantly different values ϕZj corresponding to individual balance equations (with a maximum value ϕZj : ϕZ max ), but at the same time values ϕZj close to are expected, it’s been suggested to accept as the value of daily gains ϕZ = (0,7 − 0,9) ⋅ ϕmax . Then
should be re-determined for the assumed value of gains ϕZ = (0.7 − 0.9) ⋅ ϕmax . -
–
if the determined distribution of internal gains covers ϕZj included in the range (0.7 − 1.0). ϕZ max , the arithmetic mean of the determined values ϕZj can be accepted as value ϕZ ,
-
–
the results obtained with the solution of the overdetermined system of balance equations by means of the matrix method and the determinants, with the course of proceedings presented in the monograph, do not deviate significantly from the results obtained by the multiple regression method. Such a state of results is inter alia the result of the accepted measured uncertainties. The results obtained by the regression method, however, are also accompanied by the determination of their uncertainty,
-
–
using the meaningful temperature in place of the outside air temperature in a multiple-daily measuring method to determine the values allowing to determine the building’s thermal characteristics leads to a significant change in the results (improvement of their accuracy).
The determined values