The Construction Specifications Institute (CSI) (2011). Construction contract administration: practice guide; The Construction Specifications Institute, Wiley, NJ.
Al Musallami, A., and Assaf, S. (1996). Public owners’ satisfaction with consultancy practices in Saudi Arabia; Building Research and Information, 24(3), 148–151.10.1080/09613219608727518
Al-Shammari, M. (2010). AHP model for engineering consultant selection in Saudi Arabia, Master Report, Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Ng, S. T., and Chow, L. K. (2004a). Evaluating engineering consultants’ general capabilities during the pre-selection process – a Hong Kong study; Engineering, Construction and Architectural Management 11(3), 150–158.10.1108/09699980410535769
Al-Besher, M. F. S. (1998). A conceptual model for consultant selection in Saudi Arabia, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Love, P., Edwards, D., Sangwon, H. (2011). Design error reduction: towards the effective utilization of building information modelling; Research in Engineering Design 22(3), 173–187.10.1007/s00163-011-0105-x
Cheung, F. K. T., Kuen, J. L. F., Skitmore, M. (2002). Multi-criteria evaluation model for the selection of architectural consultants, Construction Management and Economics, 20(7), 569y–580.10.1080/01446190210159818
Potter, K. J. and Sanvido, V. (1995). Implementing a design/build prequalification systems; Journal of Management in Engineering 11(3), 30–34.10.1061/(ASCE)0742-597X(1995)11:3(30)
Al-Sobiei, O. S., Assaf, S., Arditi, D. (1996). Construction claims in residential building projects in Saudi Arabia; International Journal for Housing Science and its Applications 20(2), 79–89.
Assaf, S., Al-Hammad, A., Al-Shihah, M. (1996). Effects of faulty design and construction on building maintenance; Journal of Performance of Constructed Facilities 10(4), 171–174.10.1061/(ASCE)0887-3828(1996)10:4(171)
Ling, Y. Y. (2002). Model for predicting performance of architects and engineers; Journal of Construction Engineering and Management 128(5), 446–455.10.1061/(ASCE)0733-9364(2002)128:5(446)
Ling, Y. Y. (2003). A conceptual model for selection of architects by project managers in Singapore; International Journal of Project Management 21, 135–144.10.1016/S0263-7863(02)00014-5
Abdulwahab, M. F. (2006). Evaluation of consultant performance, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Sporrong, J. (2011). Criteria in consultant selection: public procurement of architectural and engineering services; Australian Journal of Construction Economics and Building 11(4), 59–76.10.5130/AJCEB.v11i4.2297
Chow, L. K. and Ng, S. T. (2007); Expectation of performance levels pertinent to consultant performance evaluation; International Journal of Project Management 25(1), 90–103.10.1016/j.ijproman.2006.08.007
Basham, A. P. (1983). Consultant selection: the two envelope system of bidding; Industrial Marketing Management 12(4), 271–279.10.1016/S0019-8501(83)80007-8
Ng, S. T., and Chow, L. K. (2004). Framework for evaluating the performance of engineering consultants; Journal of Professional Issues in Engineering Education and Practice 130(4), 280–288.10.1061/(ASCE)1052-3928(2004)130:4(280)
Ng, S. T. (2004). Factors pertinent to the selection of architectural and building services consultants; HKIE Transactions, 11(3), 42–49.10.1080/1023697X.2004.10667967
Omar, M. F., Trigunarsyah, B., and Wong, J. (2009). A design science approach for consultant selection decision support system; Proceedings of the 4th International Conference on Cooperation and Promotion of Information Resources in Science and Technology, November 21-23, Beijing, China, IEEE Computer Society, 90–94.10.1109/COINFO.2009.73
Zavadskas, E. K., Vilutiene, T. (2006); A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria; Building and Environment, 41(5), 621–632.10.1016/j.buildenv.2005.02.019
Darvish, M., Yasaei, M., Saeedi, A. (2009). Application of the graph theory and matrix methods to contractor ranking; International Journal of Project Management, 27(6) 610–619.10.1016/j.ijproman.2008.10.004
Plebankiewicz, E. (2010). Construction contractor prequalification from Polish clients’ perspective; Journal of Civil Engineering and Management, 16(1), 57–64.10.3846/jcem.2010.05
Plebankiewicz, E. (2012). A fuzzy sets based contractor prequalification procedure; Automation in Construction, 22, 433–443.10.1016/j.autcon.2011.11.003
Nieto-Morote, A., Ruz-Vila, F. (2012). A fuzzy multicriteria decision-making model for construction contractor prequalification; Automation in Construction, 25, 8–19.10.1016/j.autcon.2012.04.004
Zhang, Y., and Fan, Z. (2014). An optimization method for selecting project risk response strategies; International Journal of Project Management, 32(3), 412–422.10.1016/j.ijproman.2013.06.006
Canada, J. R., Sullivan, W. G., Kulonda, D. J, White, J. A. (2005). Capital investment analysis for engineering and management; 3rd Ed., Prentice Hall, NJ.
Figueira, J., Greco, S., Ehrgott, M. (2005). Multiple criteria decision analysis: state of the art surveys; International Series in Operations Research and Management Science, 78, Springer, NY.10.1007/b100605