Skip to main content
Have a personal or library account? Click to login
Integration of risk assessment methods in construction with BIM technology – an innovative approach Cover

Integration of risk assessment methods in construction with BIM technology – an innovative approach

Open Access
|May 2026

References

  1. Abanda, F.H., Musa, A.M., Clermont, P., Tah, J.H.M. & Oti, A.H. (2020) A BIM-based framework for construction project scheduling risk management. International Journal of Computer Aided Engineering and Technology (IJCAET), 12(2), 182–218. DOI: 10.1504/IJCAET.2020.105575.
  2. Ali, K.N., Alhajlah, H.H. & Kassem, M.A. (2022) Collaboration and risk in Building Information Modelling (BIM): A systematic literature review. Buildings, 12(5), 571. DOI: 10.3390/buildings1205 0571.
  3. Almashhour, R., Al-Mhdawi, M.K.S., Daghfous, A., Qazi, A. & Ojiako, U. (2025) Traditional to sustainable risk management in the construction industry: a systematic literature review. International Journal of Managing Projects in Business, 18-3, 528–565. DOI: 10.1108/IJMPB-01-2025-0021.
  4. Bockstael, D. & Issa, M.H. (2016) A methodology for contractor clash detection using Building Information Modelling on commercial construction projects. Journal of Information Technology in Construction (ITcon), 21, 233–249, http://www.itcon.org/2016/16.
  5. Grzyl, B. & Kristowski, A. (2016) BIM jako narzędzie wspomagające zarządzanie ryzykiem przedsięwzięcia inwestycyjnego. Materiały Budowlane, 6, 52–54. DOI: 10.15199/33.2016.06.22.
  6. Kaczorek, K. (2023) Możliwości wdrożenia koncepcji Budownictwa 4.0 w obszarze BHP. Przegląd Budowlany, 9-10, 105–109. DOI: 10.5604/01.3001.0053.9372.
  7. Kim, I., Lee, Y. & Choi, J. (2020) BIM-based hazard recognition and evaluation methodology for automating construction site risk assessment. Applied Sciences, 10(7), 2335. DOI: 10.3390/app10072335.
  8. Lee, Y., Kim, I. & Choi, J. (2020) Development of BIM-based risk rating estimation automation and a design-for-safety review system. Applied Sciences, 10(11), 3902. DOI: 10.3390/app10113902.
  9. Lu, Y., Gong, P., Tang, Y., Sun, S. & Li, Q. (2021) BIM-integrated construction safety risk assessment at the design stage of building projects. Automation in Construction, 124, 103553. DOI: 10.1016/j.autcon.2021.103553.
  10. Numan, M. (2024) BIM and Risk Management: A review of strategies for identifying, analysing and mitigating project risks. Journal of Engineering Research and Sciences, 3(1), 20–26. DOI: 10.55708/js0301004.
  11. Pubanz, K., Protchenko, K., Kaczorek, K. & Nicał, A., (2022) Przygotowanie dokumentacji wykonawczej i warsztatowej dla elementów konstrukcji prefabrykowanych przy wykorzystaniu technologii BIM. Nowoczesne Hale, 3, 38–44.
  12. Sacks, R., Eastman, C., Lee, G. & Teicholz, P. (2018) BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers. 3rd Edition, Wiley. ISBN 9781119287537, online ISBN 9781119287568. DOI: 10.1002/9781119287568.
  13. Salman, A. (2011) Building Information Modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252. DOI: 10.1061/(ASCE)LM.1943-5630.0000127.
  14. Zhang, J., Jiang, S. & Qi, X. (2025) Enhancing fire safety with Improved Risk Index and BIM in building evacuation. Engineering. Construction and Architectural Management, 32(5), 2793–2813. DOI: 10.1108/ECAM-09-2023-0923.
  15. Zou, Y., Kiviniemi, A. & Jones, S.W. (2017) A review of risk management through BIM and BIM-related technologies. Safety Science, 97, 88–98. DOI: 10.1016/j.ssci.2015.12.027.
DOI: https://doi.org/10.17512/bozpe.2026.15.01 | Journal eISSN: 2544-963X | Journal ISSN: 2299-8535
Language: English
Published on: May 19, 2026
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2026 Krzysztof Zima, Edyta Plebankiewicz, Jorge Rueda-Benavides, published by Technical University in Czestochowa
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.

AHEAD OF PRINT