References
- [1] PN-EN 1993-1-1 (2006). Design of steel structures. General rules and rules for buildings. Eurocode 3.
- [2] Ordinance of the Minister of Economy on Occupational Safety Regulations, Traffic and Specialist Fire Precautions in Underground Mines of June 28, 2002, as amended (Journal of Laws No. 139, item 1169, Journal of Laws No. 124, Item 863, 2006, Journal of Laws, No. 126, item 855, 2010).
- [3] K
ostrz J., Głębienie szybów, Retrieved February, 2017, from http://szkolaeksploatacji.pl/wp-content/knowledge/flipbook/2014_JanKostrz-GlebienieSzybow_v2/index.html#11, 2014. - [4] P
łachno M., Nowe metody projektowania i eksploatacyjnej kontroli zbrojenia pionowych szybów górniczych, Akademia Górniczo-Hutnicza, WIMiR, Kraków 2005. - [5] Ministry of Mining and Energy, Energy and Mechanics Department, Instructions on concession design and calculations for hoisting installation, Katowice, 1963
- [6] Ordinance of the Minister of Industry and Trade on Occupational Safety Regulations, Traffic and Specialist Fire Precautions in Underground Mines of April 14, 1995 (Journal of Laws No. 67, item 342).
- [7] G
raffstein -Malkiewicz E., Leśniewski K., Korozja w górnictwie węglowym, Śląsk, Katowice 1971. - [8] K
ędziora A., Eksploatacja szybowych urządzeń wyciągowych, Śląsk, Katowice 1983. - [9] BN-78/1727-22 (1978), Shaft guides. Steel guide channels.
- [10] Dassault Systèmes Simulia Corp. (2017) Abaqus Analysis User’s Manual.
- [11] R
akowski G., Kacprzyk Z., Metoda elementów skończonych w mechanice konstrukcji, OWPW, Warszawa 2016.