Have a personal or library account? Click to login

Experience in design and construction of the Log tunnel

Open Access
|Dec 2017

References

  1. [1] Načrt predora Log, št. ic: 15/14-P, IRGO Consulting d.o.o.
  2. [2] Geološko-geotehnični elaborat za predor Log s predvkopi, št. ic: 250/12, IRGO Consulting d.o.o.
  3. [3] Hoek, E., Carranza-Torres, C., Corkum, B. (2002): Hoek-Brown criterion - 2002 edn. Proc. NARMSTAC, Conference, Toronto, 2002, Vol. 1, pp. 267-273.
  4. [4] Marinos, P., Hoek, E. (2000): GSI - A geologically friendly tool for rock mass strength estimation. Proc. GeoEng 2000 Conference, Melbourne, pp. 1422-1442.
  5. [5] Panet, M., Guenot, A. (1982): Analysis of convergence behind the face of a tunnel. Proceedings, International Symposium Tunnelling’82, IMM, London, pp. 197-204.
  6. [6] Panet, M. (1995): Calcul des Tunnels par la Me’thode de Convergence-Confinement. Presses de l’Ecole Nationale des Ponts et Chausse’es, Paris, 178 p.
  7. [7] Vlachopoulos, N., Diederichs, M.S. (2009): Improved longitudinal displacement profiles for convergence confinement analysis of deep tunnels. Journal of rock mechanics and rock engineering, 42, pp 131-146.10.1007/s00603-009-0176-4
  8. [8] Carranza-Torres, C., Fairhurst, C. (2000): Application of the convergence-confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion. Tunnelling and Underground Space Technology, 15, pp. 187-213.10.1016/S0886-7798(00)00046-8
  9. [9] Chern, J.C., Shiao, F.Y., Yu, C.W. (1998): An empirical safety criterion for tunnel construction.Proceedings of the Regional Symposium on Sedimentary Rock Engineering, Taipei, Taiwan, pp. 222-227.
  10. [10] SIST EN 1992-1-1:2005.
  11. [11] Rabcewicz, L. (1964): The New Austrian Tunnelling Method, Part one, Water Power, November 1964, pp. 453-457, Part two, Water Power, December 1964, pp. 511-515.
  12. [12] Rabcewicz, L. (1965): The New Austrian Tunnelling Method, Part one, Part Three, Water Power, January 1965, 19-24.
  13. [13] ÖNORM B 2203-1: Untertagebauarbeiten - Werksvertragsnorm. Teil 1: Zyklischer Vortrieb. -Dezember 2001.
  14. [14] ÖGG: Richtlinie für die Geomechanische Planung von Untertagebauaroelten mit zyklischem Vortriob. - Oktober 2001.
  15. [15] Jovičić, Vojkan. (2006): Examples of active design in tunnelling. In: Active geotechnical design in infrastructure development: proceedings of the XIIIth Danube European Conference on Geotechnical Engineering, Logar, J., Gaberc, A.M., Majes, B. (eds.). Ljubljana: Slovenian Geotechnical Society: Ljubljana, pp.
Language: English
Page range: 131 - 144
Submitted on: Feb 15, 2017
Accepted on: Jun 9, 2017
Published on: Dec 29, 2017
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2017 Vojkan Jovičić, Niko Goleš, Matija Tori, Miha Peternel, Stanojle Vajović, Elvir Muhić, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.