Have a personal or library account? Click to login
Open Access
|Feb 2018

Abstract

In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230), presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

DOI: https://doi.org/10.1515/otmcj-2016-0027 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 1665 - 1673
Submitted on: Sep 5, 2017
Accepted on: Nov 24, 2017
Published on: Feb 16, 2018
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2018 Pablo Orihuela, Santiago Pacheco, Jorge Orihuela, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.