References
- Blasius, J., & Brandt, M. (2010). Representativeness in online surveys through stratified samples. Bulletin of Sociological Methodology, 107(July), pp. 5–21.
- Brown, R. H. (2008). Cash Flow Best Practice for Small and Medium-sized Enterprises. QFinance, Bloomsbury Information, London, Great Britain, 4 pp. Available at http://www.qfinance.com/cash-flow-management-best-practice/cash-flow-best-practice-for-small-and-medium-sized-enterprises?full on 11 January, 2010.
- Buchanan, E. A., & Hvizdak, E. E. (2009). Online survey tools: Ethical and methodological concerns of Human Research Ethics Committees. Journal of Empirical Research on Human Research Ethics: An International Journal, 4(2), pp. 37–48.
- Couper, M. P. (2008). Designing Effective Web Surveys. Cambridge University Press, New York City, NY.
- Couper, M. P., Traugott, M. W., & Lamias, M. J. (2001). Web survey design and administration. Public Opinion Quarterly, 65(2), pp. 230–253.
- Cui, Q., Hastak, M., & Halpin, D. W. (2010). Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), pp. 361–376.
- Dash Group. (2006). “Cash flow best practices.” Survey questions, Small Business Advisory Toolkit: Finance, Bullseye Business Solutions, Dash Group, Stony Plain, Alberta, Canada, 4 pp. Available at http://www.thedashgroup.com/LinkClick.aspx?fileticket=3%2F2cciOkkYg%3D&tabid=178 on 11 January, 2010.
- Elazouni, A. M., & Metwally, F. G. (2005). Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400–412.
- Gitman, L. J., Moses, E. A., & White, I. T. (1979). An assessment of corporate cash management practices. Financial Management, 8(1), pp. 32–41.
- Görög, M. (2009). A comprehensive model for planning and controlling contractor cash-flow. International Journal of Project Management, 27(5), pp. 481–492.
- Hegazy, T., & Ersahin, T. (2001a). Simplified spreadsheet solutions. I: Subcontractor information system. Journal of Construction Engineering and Management, 127(6), pp. 461–468.
- Hegazy, T., & Ersahin, T. (2001b). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469–475.
- Hill, C. G. (2009). Getting Slow Paid? Try these Tips. Weblog, Construction Law Musings – Richmond, VA, Law Office of Christopher G. Hill, Glen Allen, VA. Available at http://constructionlawva.com/getting-slow-paid-try-these-tips on 2 March, 2010.
- Hwee, N. G., & Tiong, R. L. K. (2001). Model on cash flow forecasting and risk analysis for contracting firms. International Journal of Project Management, 20(5), pp. 351–363.
- Kenley, R. (2003). Financing Construction: Cash Flows and Cash Farming. Spon Press, Taylor and Francis Group, New York City, NY.
- Likert, R. (1932). A technique for the measurement of attitudes. Archives of Psychology, 22(140), pp. 1–55.
- Lucko, G. (2011). Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523–535.
- Lucko, G., & Rojas, E. M. (2010). Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127–135.
- Neuman, W. L. (2000). Social Research Methods: Qualitative and Quantitative Approaches, 4th ed.. Allyn and Bacon, Boston, MA.
- Park, H.-K. (2004). Cash flow forecasting in construction project. KSCE Journal of Civil Engineering, 8(3), pp. 265–271.
- Peytchev, A. (2009). Survey breakoff. Public Opinion Quarterly, 73(1), pp. 74–97.
- Porter, S. R., & Whitcomb, M. E. (2003). The impact of contact type on web survey response rates. Public Opinion Quarterly, 67(4), pp. 579–588.
- Purnus, A., & Bodea, C.-N. (2015). Financial management of the construction projects: A proposed cash flow analysis model at project portfolio level. Organization, Technology and Management in Construction, 7(1), pp. 1217–1227.
- Roper, K., & McLin, M. (2010). Key Performance Indicators Drive Best Practices for General Contractors. Microsoft Dynamics Whitepaper, KPIs for General Contractors, Prepared for Microsoft by FMI Corporation, Raleigh, NC, 11 pp. Available at http://www.epartnersolutions.com/docs/library/White_Paper_KPIs_for_General_Contractors.pdf on 28 December, 2010.
- Said, H. M. M. (2015). Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12), 04015045.
- Setzer, S. (2009). Slow payment is sapping contractors’ strength: Subs and GCs walk a fine line between getting paid and continuing to work. Engineering News Record, 262(21), p. 20 (1 p.).
- Shapiro, D. (2008). Stay Ahead of the Downturn with Sound Financial Basics. Construction Executive – The Magazine for the Business of Construction, 2 p. Available at http://www.constructionexec.com/Issues/October_2008/Special_Section2.aspx on 28 December, 2010.
- Topp, N. W., & Pawloski, R. W. (2002). Online data collection. Journal of Science Education and Technology, 11(2), pp. 173–178.
- Touran, A., Atgun, M., & Bhurisith, I. (2004). Analysis of the United States Department of Transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719–725.
- Walters, R., & McArtor, M. (2003). Best practices for electrical contractors. In: Molenaar, K. R., & Chinowsky, P. S. (eds.). Proceedings of the 2003 Construction Research Congress, Honolulu, Hawaii, March 19–21, 2003. American Society of Civil Engineers, Reston, VA, 9 pp.