Have a personal or library account? Click to login
Open Access
|Mar 2017

References

  1. Abu Hammad, A., Alhaj Ali, S., Sweis, G., & Bashir, A. (2008). Prediction model for construction cost and duration in Jordan. Jordan Journal of Civil Engineering, 2(3), 250–266.
  2. Ahuja, H. N., Dozzi, S. P., & Abourisk, S. M. (1994). Project Management Techniques in Planning and Controlling Construction Projects. John Wiley and Sons, Inc., New York.
  3. Bell, L. C., & Bozai, G. A. (1987). Preliminary cost estimating for highway construction projects. AACE Transactions, C.6.1–C.6.4.
  4. Enshassi, A., Hallaq, K., & Mohamed, S. (2006). Causes of contractor's business failure in developing countries: the case of Palestine. Journal of Construction in Developing Countries, 11(2), 1–14.
  5. Enshassi, A., Mohamed, S., & Madi, I. (2007). Contractors’ perspectives towards factors affecting cost estimation in Palestine. Jordan Journal of Civil Engineering, 1(2), 186–193.
  6. Holm, L., Schaufelberger, J., Griffin, D., & Cole, T. (2005). Construction Cost Estimating: Process and Practices. Pearson Education, Inc., New Jersey.
  7. Jrade, A., & Alkass, S. (2007). Computer-integrated system for estimating the costs of building projects. Journal of Architectural Engineering, 13(4), 205–223.
  8. Lowe, D. J., Emsley, M. W., & Harding, A. (2006). Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management. 132(7), pp. 750–758.
  9. Mahamid, I. (2011). Early cost estimating for road construction projects using multiple regression techniques. Australasian Journal of Construction Economics and Building, 11(4), pp. 78–101.
  10. Mahamid, I. (2013). Frequency of time overrun causes in road construction in Palestine: Contractors’ view. Organization, Technology and Management in Construction: An International Journal, 5(1), pp. 720–729.
  11. Mahamid, I. (2015). Factors affecting cost estimating accuracy: evidence from Palestinian construction projects. International Journal of Management Science and Engineering Management, 10(2), pp. 117–125.
  12. Navon, R. (2005). Automated project performance control of construction projects. Automation in Construction, 14, pp. 467–476.
  13. Palestinian Academic Society for the Study of International Affairs (PASSIA). (2002). Available at http://www.passia.org/.
  14. Schexnayder, C. J., & Mayo, R. E. (2003). Construction Management Fundamentals. McGraw-Hill Higher Education, Boston, MA.
  15. Sodikov, J. (2005). Cost estimation of highway projects in developing country: artificial neural network approach. Journal of the Eastern Asia Society for Transportation Studies, 6, pp. 1036–1047.
  16. United Nation (UN) Committee on Trade and Development. (1994). Prospect for Sustained Development of the Palestinian Economy in the West Bank and Gaza, 1990 to 2010: A Qualitative Framework. UN, Geneva.
DOI: https://doi.org/10.1515/otmcj-2016-0006 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 1405 - 1410
Submitted on: Apr 20, 2016
Accepted on: Jul 27, 2016
Published on: Mar 14, 2017
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2017 Ibrahim Mahamid, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.