References
- Adegboye, K. (2004). Stakeholders review advance payment bonds in construction contracts. Nigeria Vanguard Newspaper, 20 July, pp. 23–24.
- Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20, pp. 593–599.
- Ajibade, A. A., & Odeyinka, H. A. (2006). Construction delay and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.
- Ashworth, A. (1986). Cost models-their history, development and appraisal. Technical Information Service of the Chartered Institute of Building, 64, pp. 1–6.
- Augustin, P., & Constanta-Nicoleta, B. (2015). Financial management of the construction projects: A proposed cash flow analysis model at project portfolio level. Organization, Technology and Management in Construction An International Journal, 7(1), pp. 1217–1227.
- Augustine, U. E., & Mangvwat, J. (2001). Time-overrun factors in Nigeria construction industry. Journal of Construction Engineering and Management, 127(5), pp. 419–425.
- Boswall, R. G. (2010). Construction Bonds Guide, Clark Wilson LLP, Available at
www.cwilson.com on 23 June, 2011. - Coker, U. (2008). The Concept of Construction Project Delivery, 1st edn. Afram Publishing Company. Ibeju-Lekki, Lagos.
- Doloi, H., Iyer, K. C., & Sawhney, A. (2010). Structural equation model for assessing impacts of contractor's performance on project success. International Journal of Project Management, 29, pp. 687–695.
- El-Haram, M. A., & Horner, M. W. (2002). Factors affecting housing maintenance cost. Journal of Quality in Maintenance Engineering, 8(2), pp. 115–123.
- Elinwa, A. U., & Joshua, M. (2001). Time overrun factors in Nigerian construction industry. Journal of Construction Engineering and Management, 127(5), pp. 419–425.
- Fayomi, F. A. (2009). Request for proposal (RFP) for the provision of passive telecommunications infrastructure for the purpose of co-location of telecommunication companies in rural/unserved communities in Nigeria. Universal Service Provision Fund, RFP No: USPF/RFP/PASS/009/2009, 6th February.
- Hinkle, D. E., Wiersma, W., & Jurs, S. G. (1998). Applied Statistics for the Behavioural Sciences, 2nd edn. Houghton-Mifflin, Boston.
- Hosie, J. (2010). Security for payment: bonds and guarantees – five pitfalls and protection against them. Construction & Engineering London Legal Update, 60(July), pp. 21–26.
- Jenkins, J. (2009). Contractor insolvency – Be prepared. Freshfields Bruckhaus Deringer LLP. Available at
www.freshfields.com/support/legalnotice on May, 2011. - Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factor Influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15, pp. 83–94.
- Kangari, R., & Bakheet, M. (2001). Construction surety bonding. Journal of Construction Engineering and Management, 127(3), pp. 232–238.
- Kothari, C. R. (2004). Research Methodology, 2nd edn. New Age International (P) Ltd, New Delhi.
- Koushki, P. A., Al-Rashid, K., & Kartam, N. (2005). Delays and cost increase in the construction of private residential projects. Construction Management and Economics, 23, pp. 285–294.
- Loosemore, M. (2006). Managing risks. In: Pryke, S., & Smth, H. (eds.). The Management of Complex Projects: A Relationship Approach. Blackwell Publishers, UK, pp. 22–34.
- Love, P. E., Skitmore, M., & Earl, G. (1998). Selecting a suitable procurement method for a building project. Construction Management and Economics, 16, pp. 221–233.
- Mehmet, E. B., Qingbin, C., Makarand, H., & Issam, M. (2006). Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 34, pp. 333–337.
- Ogunsemi, D. R., & Jagboro, G. O. (2006). Time-cost model for building projects in Nigeria. Construction Management and Economics, 24, pp. 353–258.
- Ojo, A. E. (2011). Why do clients require construction bonds, Construction Connects, OJ Connects Resources, 1, pp. 1–4.
- Oyewobi, L. O. (2010). Evaluation of rework in some selected building projects in Niger state, Nigeria. An unpublished M.Tech thesis submitted to Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria.
- Ramus, J., Birchall, S., & Griffiths, P. (2006). Contract Practice for Surveyors, 4th edn. Butterworth-Heinemann, Oxford.
- Sanni, A. (2007). The Concept of Construction Project Delivery, 1st edn. Aluko Publishing Company, Ibeju-Lekki, Lagos.
- Seeley, I. H., & Murray, G. P. (2001). Civil Engineering Quantities, Revised edn. Jossey-Bass Publishers, San-Francisco, USA.
- Sipasi, S., & Onuma, A. (2010). Corporate Guarantees Under the 2005 Nigerian Production Sharing Contract–An Indigenous Company Perspective. Aelex Quarterly, 1, pp. 1–2.
- Stuart, S. B. (2001). Team Building in the Construction Industry, 2nd ed. Macmillan Press Ltd, London.
- The Associated General Contractors of America (2006). An overview of the contract surety bond claims process. Available at
www.spio.org on 23 March, 2012. - Wardani, M. A., Messner, J. I., & Horman, M. J. (2006). Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230–238.