Have a personal or library account? Click to login
Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Project Cover

Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Project

Open Access
|Sep 2017

References

  1. ADBInstitute (2009) PPPs: Sharing development knowledge about Asia and the Pacific. Retrieved from www.cdi.mecon.gov.ar/biblio/docelec/bm/ppps203.pdf on 2nd August, 2010.
  2. Akintoye, A., Fitgerald, E. & Hardcastle, C. (1999). Risk management for local authorities’ PFI projects. Retrieved from www.rics.org/site/download-feed.aspx?fileID=2644
  3. Andersen, A. (2000). Value for money drivers in the private finance initiative. London, UK: HM Treasury Task Force.
  4. Arndt, R. H. (1999) Risk Allocation in the Melbourne CityLink Project. Journal of Project Finance. 4(3), 11-24.
  5. Beckers, F. et al. (2013). A risk management approach to a successful infrastructure project: Initiation, financing and execution. McKinsey Working Papers on Risk, Number 52. Accessed from www.mckinsey-company on September 24th, 2016.
  6. Bokharey, S., Vallyutham, K., Potty, N. S. & Baker, N. A. (2010). Risks and mitigation measures in BOT projects. World Academy of Science, Engineering and Technology, Vol. 63,
  7. Bovaird T (2004) Public-private partnerships: from contested concepts to prevalent practice. International Review of Administrative Sciences, 70(2), 199-215. doi: 10.1177/0020852304044250
  8. Carpintero, S. nd Helby, O. P. (2015). Bundling and Unbundling in Public-Private Partnerships: Implications for Risk Sharing in Urban Transport Projects. Project Management Journal, 46(4), 35-46. DOI: 10.1002/pmj.2150810.1002/pmj.21508
  9. Cochrane, J. H. (2007). Portfolio Theory. Accessed from http://faculty.chicagogsb.edu/john.cochrane/research/Papers on 26th September, 2016.
  10. Daily Independent (2013). Why we acquired concession rights from LCC - Lagos. Accessed from dailyindependent. com/2013/08/why-we-acquired-concession-right-from-lcc-lagos-govt/ on 14th October, August, 2016.
  11. Demirag, I., Khadaroo, I., Pamela Stapleton, P. & Stevenson, C. (2011) Risks and the financing of PPP: Perspectives from the financiers. The British Accounting Review, 43, 294-310. DOI: 10.1177/1087724X0426324710.1177/1087724X04263247
  12. Dominic, C., Ezeabasili, A.C.C., Okoro, B.U., Dim, N.U & Chikezie, G.C. (2015).- A Review of Public Private Partnership on some Development Projects in Nigeria. International Journal of Application or Innovation in Engineering & Management (IJAIEM), (4)3, 64-75. Accessed from www.ijaiem.org
  13. Eastham, R. A. & Skitmore, M. (1993). Construction contractor’s project selection: decision making within portfolio framework. In proceedings international seminar on optimum systems for construction management (ISOSCM ’93), 1, Management Modernisation Research Institute, CCIA, Harbin, Heilongjiang, China. Accessed from http://eprints.qut.edu.au
  14. European Commission (2003). Guidelines for successful public-private partnerships. Directorate-General for Regional Policy. Brussels: European Commission.
  15. Fellows, R. and Liu, A. (1997). Research methods for construction. Blackwell Science: London
  16. Flanagan, R. and Norman, R. (1993). Risk management and construction. Oxford: Blackwell
  17. Froud, J. (2003). The Public Finance Initiative: Risk uncertainty and the state. Accounting, Organisations and Society, 28(2), 567-589. DOI: 10.1016/S0361-3682(02)00011-910.1016/S0361-3682(02)00011-9
  18. Ghazali, F. E. M. & Kabir, S. (2009). Determination of risk identification process employed by NHS for a PFI hospital project in the UK. Journal of Industrial Engineering and Management, 2(3), 558-68.
  19. Glaister, S., Scanlon, R and Tony Travers, T. (2000). Getting Public Private Partnerships Going in Transport.Public Policy and Administration; 15(50), 50-71. DOI: 10.1177/095207670001500404 10.1177/095207670001500404
  20. Gramlich, E. (1994) Infrastructure investment: A review essay. Journal of Economic Literature, Australian Institute of Economist, 32(3), 1176-1196. Accessed from http://links.jstor.org/sici?sici=0022-0515%28199409
  21. Hansson, S. O. (2005). Decision Theory: A brief introduction. Accessed from http://www.philpaper.org/HANDT on 26th September, 2016.
  22. Hardcastle, J. and Boothroyd, L. (2003). Re-engineering the building procurement decision making process. Proceedings of COBRA 2001. Accessed from www.rics-foundation.org on June 26th, 2016.
  23. Hatfield, M. (2008). Game Theory in Management: Modelling Business Decisions and their Consequences. Gower: PMI Publishing
  24. Hyunchan, C., Masahiko, K. & Tsuneaki, Y. (1997). BOT project financing in Asian developing countries: Comparative study of structure and risk in BOT power projects. Construkti, Journal of Department of Civil Engineering, University of Tokyo 10.2208/procm.5.93
  25. International Institute for Sustainable Development (IISD) (2015). Risk Allocation in Public-Private Partnerships: Maximizing value for money. IISD Discussion Paper - Currency Risk in Project Finance. Accessed from http//www.iisd.org on 18th October, 2016.
  26. Jagboro, G. O. & Ojo, G. K., Opawole, A & Sanni, G. A. (2014). Risks associated with concession-based contracts in Lagos state, Nigeria. Transaction, (1), Journal of American Association of Cost Engineers (AACE).
  27. Jefferies, M., Gameson, R & Rowlinson, S. (2002). Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), 352-361.10.1108/eb021230
  28. Jin, X. and Doloi, H. (2007) Risk Allocation in Public-Private Partnership Projects - An Innovative Model with an Intelligent Approach. Proceedings of (RICS) COBRA 2007, held at Georgia Tech, Atlanta USA, 6-7 September, 2007.
  29. Ke, Y., Wang, S. and Chan, A. 2013. Risk misallocation in public-private partnership in China. International Public Management Journal, 16(3), 438-460. doi/abs/10.1080/10967494.2013.82550810.1080/10967494.2013.825508
  30. Khazaeni, G., M. Khanzadi and A. Afshar (2012). Fuzzy adaptive decosion making model for selecting balanced risk allocation. Int’l Journal of Project Management, 30, 511-522.10.1016/j.ijproman.2011.10.003
  31. Kreydieh, A. (1996). Risk management in BOT project financing. (MSc thesis) Massachusetts Institute of Technology, Harvard, MA. Retrieved from www.researchbank.rmit.edu.au/view/rmit:3032
  32. Kriz, W. C. & Hense, J. U. (2006). Theory-oriented evaluation for the design of and research in gaming and simulation. Simulation & Gaming, Vol. 37, (SAGE Publications), DOI: 10.1177/104687810628795010.1177/1046878106287950
  33. Lema, N. M. (no date). An assessment of the Build-Operate-Transfer (BOT) model for infrastructure project financing in Tanzania. Retrieved from www.ce.udsm.ac.tz/publications/papers/lema-bot/pdf.
  34. Liu, J. and Cheah, C. Y. J. (2009). Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27, 331-34210.1080/01446190902807071
  35. Liu, T. and Wilkinson, S. (2014). Large-scale public venue development and the application of PPPs. International Journal of Project Management, 32, 88-100.10.1016/j.ijproman.2013.01.003
  36. Loosemore, M. and McCarthy, C. S. (2008). Perceptions of contractual risk allocation in construction supply chains. Journal of Professional Issues in Engineering Education and Practice, 134, 95-105. DOI: (ASCE)1052-3928(2008)134:1(95)10.1061/(ASCE)1052-3928(2008)134:1(95)
  37. Ng, A. and Loosemore, M. (2007). Risk allocation in the private provision of public of public infrastructure. International Journal of Project Management. 25(1) DOI:10.106/j:ijproman.2006.06.00510.1016/j.ijproman.2006.06.005
  38. Oyegoke, A. S. (2005). Infrastructure Project Financing and Execution Development Strategies. The Quantity Surveyor, journal of Nigerian Institute of Quantity Surveyors (NIQS), 52(3).
  39. Pacific Islands Forum Secretariat (PIFS) (2006). Public private partnerships and Build, Operate and Transfer (BOT) schemes. Proceedings of Forum of Economic Ministers Meeting, held at Honiara, Solomon Islands on July 03-05, 2006. Pollitt, C. (2003). The Essential Public Manager. Maidenhead: Open University Press.
  40. PPP in Infrastructure Resource Centre for Contracts, Laws and Regulations (PPPIRC). (2008). Risk Distribution Methodology. Washington: World Bank. Accessed from http://www.worldbank.org/ppp on 30th November, 2016. Project Management Institute (2000). Project Management Body of Knowledge. PMI, PA.
  41. Quiggin, J. (1996). Private Sector Involvement in Infrastructure Projects. Australian Economic Review. Retrieved from http://www.uq.edu/economics/johnquiggin/journalsarticles96/infrastructure10.1111/j.1467-8462.1996.tb00915.x
  42. Rahman, M. and Kumaraswamy, M. (2002). Revamping risk management in Hong Kong construction industry. Proceedings of COBRA 2001. Accessed from www.rics-foundation.org on August 23rd, 2016.
  43. Sanni, G. A. (2012). Risks associated with concession contracts in Lagos state, Nigeria. MSc thesis submitted to the department of Quantity Surveying, Obafemi Awolowo University, Ile-Ife, Osun State, Nigeria.
  44. Sanni, G. A., Adebiyi, J. O. and Osazuwa, M. (2016). Risk forecast template for Build-Operate-Transfer (BOT) Transportation Infrastructure in Nigeria. In Proceeding of 2nd University of Benin Annual Research Conference (UBARD), held on 20th -21st October, 2016.
  45. Smith, N. J., Merna, T. & Jobling, P. (2006) Managing Risk in Construction Projects. (2nd ed.). Oxford: Blackwell Science.
  46. Thomsen, S. (2005) Public Private Partnerships in the services sector. Retrieved from www.ncpp.org/resources/papers/seadrere-experience.pdf .
  47. Valipour, A., Mohammadi, F., Yahaya, N., Sarvari, H. & Noor. N. M. (2014). Identification and evaluation of risk allocation criteria and barriers. A Malaysian PPP project case study. Journal of Applied Sciences, 14(18), 2023-2031 (ANSI). DOI:10.3923/jas.2014.2023.203110.3923/jas.2014.2023.2031
  48. Vassallo, J. M. (2004). Short-Term Infrastructure Concessions: Conceptual Approach and Recent Applications in Spain. Public Works Management & Policy, 8(4), 261-270.10.1177/1087724X04263247
  49. Vu, H.-A., Wang, J.Q., Min, L.X. and Nguyen, T.-N. (2015). Impacts of the Financial Factors on Schedule Delays Risk of the International Contracting Projects: Evidence from Highway BOT Projects in Vietnam. World Journal of Engineering and Technology, 3, 311-319. http://dx.doi.org/10.4236/wjet.2015.3403010.4236/wjet.2015.34030
  50. Wang, S. Q., Dulaimi, M. F. & Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22, 237-252.10.1080/0144619032000124689
  51. Xu, Y., A.P.C. Chan and J.F.Y. Yeung, (2010). Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136, 894-903.10.1061/(ASCE)CO.1943-7862.0000189
  52. Yin, R. (1994). Case study research: Design and methods (2nd ed.). Beverly Hills: Sage Publishing.
DOI: https://doi.org/10.1515/jbe-2017-0004 | Journal eISSN: 2064-2520 | Journal ISSN: 2063-997X
Language: English
Page range: 43 - 57
Published on: Sep 6, 2017
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2017 Gabriel A. Sanni, John O. Adebiyi, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.