References

  1. Alarcon, L.F. & Mourgues, C. (2002). Performance modelling for contractor selection., 18 (2), 52–60.
  2. Al-Harbi, K. M. & A.-S. (2001). Application of the AHP in project management., 19 (1), 19 –27.
  3. Andruškevičius, A. (2005). Evaluation of contractors by using COPRAS – the multiple criteria method., 11(3), 158–169.
  4. Azis, I.J. (2010). Predicting a Recovery Date from the Economic Crisis of 2008., 44, 122-129.
  5. Banaitis, A. & Banaitien, N. (2006). Analysis of criteria for contractors’ qualification evaluation, Technological and Economic., 12(4), 276–282.
  6. Blair, A.R., Mnadelker, G.N., Saaty, T.L. & Whitaker, R. (2010). Forecasting the resurgence of the U.S. economy in 2010: An expert judgment approach., 44(3) 114-121.
  7. Carr, P. G. (2012). Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders., 131(11), 1165–1172.
  8. Dobi, K., Gugić, J., Kancijan, D. (2010). AHP As a Decision Support Tool in the Multicriteria Evaluation of Bids in Public Procurement Proceedings of theJune 21-24, Cavtat, Croatia.
  9. Fong, P. S. W.& Choi, S. K.-Y. (2000). Final contractor selection using the analytical hierarchy process., 18(5), 547–557.
  10. Ginevicius, R. & Podvezko, V. (2008). Multicriteria graphical analytical evaluation of the financial state of construction enterprises., 14(4), 452–461.
  11. Hatush, Z. & Skitmore, M. (1998). Contractor selection using multicriteria utility theory: An additive model., 33(2-3), 105–115.
  12. Holt, G.D. (1997). Classifying construction contractors: a case study using cluster analysis., 25(6), 374–82.
  13. Holt, G.D. (1998). Which contractor selection methodology?, 16(3), 153–164.
  14. Holt, G. D. & Edwards, D. J. (2005). Domestic builder selection in the UK housing repair and maintenance sector: a critique., 6(1), 123–137.
  15. Hughes, M. (2005). Evaluation of the Local Government Procurement Agenda – Baseline Survey Report. The Office of the Deputy Prime Minister, London. [On-line]. Available at. [Last retrieved April 20, 2006].
  16. Ishizaka, A. & Labib, A. (2011). Review of the main developments in the analytic hierarchy process., 38(11): 14336–14345.
  17. Izveštaj o javnim nabavkama u Republici Srbiji za period 01.01.2014-30.06.2014.godine, Republika Srbija, Uprava za javne nabavke, Beograd, 2014.
  18. Jayant, A., Paul, V. & Kumar, U. (2015). Aplication of Analytic Network Process (ANP) in Business Environment: A Comprehensive Literature Review,, 5(1), 29-37.
  19. Kandanala, R., Al-Hussein, M. & Vanderstar, A. (2005). Automation of pre-bidding process for construction projects., 147(6), 30–34.
  20. Lam, K.C., Hu, T., Ng, S.T., Skitmore, M. & Cheung, S.O. (2001). A fuzzy neural network approach for contractor prequalification., 19(2), 175–188.
  21. Laver, J. & Larsberger, O. (2011). The Art of identifying „The Most Economically Advantageous Tender” – the Use of Relative Evaluation Models in Public and Utilities Procurement, Hannes Snellman Attorneys Ltd.,.
  22. Mahdi, I.M., Riley, M.J., Fereig, S.M. & Alex, A.P. (2002). A multi-criteria approach to contractor selection., 9(1), 29–37.
  23. Minchin, Jr. R.E. & Smith, G.R. (2005). Quality-based contractor rating model for qualification and bidding purposes., 21(1), 38–43.
  24. Mitkus, S. & Trinkuniene, E. (2008). Reasoned decisions in construction contracts evaluation., 14(3), 402–416.
  25. Molenaar, K. R. & Johnson, D. E. (2003). Engineering the procurement phase to achieve the best value., 3(3), 137–141.
  26. Ng, S. T. & Skitmore, R. M. (1999). Client and consultant perspectives of prequalification criteria., 34(5), 607–621.
  27. Nikolovová, P., Palguta, J. & Pertold, F. (2012). Public Contracts in the Czech Republic. What the Data Say on Behaviour of Contracting Authorities? Veřejné zakázky v ČR: Co říkají data o chování zadavatelů?.. [Online] 6. [Citace: 10. May 2013.].
  28. Paul, A. & Gutierrez, G. (2005). Simple probability models for project contracting.165(2), 329–338
  29. Plenkiewicz, E. (2009). Contractor prequalification model using fuzzy sets.15(4), 377–385
  30. Russell, J.S. & Skibniewski M. (1987). A structured approach to the contractor prequalification process in the USA., Session D:240-51. Danish Building Research Copenhagen, Denmark.
  31. Russel, J.S. (1991). Contractor failure: analysis., ASCE, 5(3), 163-180.
  32. Russell, J. S., Hancher, D. E. & Skibniewski, M. J. (1992). Contractor prequalification data for construction owners., 10(2), 117–135.
  33. Saaty, T. L., (1980). The Analytic Hierarchy Process, New York, McGraw-Hill.
  34. Saaty, T. L. & Kearns P. K. (1985). Analytical planning, The Organization of Systems, The Analytic Hierarchy Process Series, Vol. IV, RWS Publications, Pittsburgh.
  35. Saaty, T. L., (2005). Theory and Applications of the Analytic Network Process, Decision Making with Benefits, Opportunities, Costs and Risk, RWS Publications, Pittsburgh.
  36. Saaty, T. (2010). Economic forecasting with tangible and intagible criteria: the analytic hierarchy process of measurement and its validation,, 1, 5-45.
  37. Saaty T.L. & Peniwati K. (2008). Group decision making: drawing out and reconciling differences. RWS Publications, Pittsburgh.
  38. Shen, L. Y., Lu, W., Shen, Q. & Li, H. (2003). A computer-aided decision support system for assessing a contractor’s competitiveness., 12(5), 577–587.
  39. Sipahi, S. Timor, M. (2010). The analytic hierarchy process and analytic network process: an overview of applications., 48(5), 775 – 808
  40. Skibniewski, M., & Chao, L. (1992). Evaluation of advanced construction technology with AHP method., ASCE, 118, 255–261.
  41. Strand, I., Ramada, P. & Canton, E. (2011).A study on procurement regulation. Prepared for the European Commission, March 2011, London Economics, ECORYS.
  42. Topcu, Y. I. (2004). A decision model proposal for construction contractor selection in Turkey., 39(4), 469–481.
  43. Turskis, Z. (2008). Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique.14(2), 224–239.
  44. Vaidya, O.S & Kumar, S. (2006). Analytic hierarchy process: An overview of applications,, Publisher: Emerald Group Publishing Limited, 169(1), 1-29.
  45. Wong, C. H., Holt, G. D. & Harris, P. (2001). Multi-criteria selection or lowest price? Investigation of UK construction clients’ tender evaluation preferences., 8(4), 257–271.
  46. Wong, C. H., Holt, G. D. & Cooper, P. A. (2000). Lowest price or value? Investigation of UK construction clients’ tender selection process., 18(7), 767–774.
  47. Voulgaridou, D., Kirytopoulos K.E. & Leopoulos, V. (2009). An Analytic Network Process Approach for sales forecasting,9, 35-53.
  48. Zavadskas, E. K., Kaklauskas, A. & Banaitiene, N. (2001). Multi-criteria analysis of a building life cycle. Vilnius:, 380 p. (in Lithuanian).
DOI: https://doi.org/10.1515/ethemes-2016-0006 | Journal eISSN: 2217-3668 | Journal ISSN: 0353-8648
Language: English
Page range: 103 - 128
Submitted on: Dec 22, 2015
Accepted on: Mar 23, 2016
Published on: Jun 8, 2016
Published by: University of Niš, Faculty of Economics
In partnership with: Paradigm Publishing Services
JEL:

© 2016 Predrag Mimović, Ana Krstić, published by University of Niš, Faculty of Economics
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.