Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India

Open Access
|Nov 2017

References

  1. Alaghbari, W., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/0969998071073130810.1108/09699980710731308
  2. Al-Khalil, M. I., & Al-Ghafly, M. A. (1999). Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), 647-655. https://doi.org/10.1080/01446199937125910.1080/014461999371259
  3. Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of Project Management, 18(1), 51-59. https://doi.org/10.1016/s0263-7863(98)00060-x10.1016/s0263-7863(98)00060-x
  4. Arditi, D., Akan, G. T., & Gurdamar, S. (1985). Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), 171-181. https://doi.org/10.1080/0144619850000001310.1080/01446198500000013
  5. Arditi, D., & Robinson, M. A. (1995). Concurrent Delays in Construction Litigation. Cost Engineering Journal, AACE International, 37(7), 20-31.
  6. Asim, M., Deep, S., & Dr. Aqeel, S. A. (2017). Time Impact Study of Real Estate Sector Construction Projects Post Application of Lean Principles for Delay Resolutions. International Journal of Civil Engineering and Technology, 8(2), 89-99.
  7. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. https://doi.org/10.1016/j.ijproman.2005.11.01010.1016/j.ijproman.2005.11.010
  8. Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of Delay in Large Building Construction Projects. Journal of Management in Engineering, 11(2), 45-50. https://doi.org/10.1061/(asce)0742-597x(1995)11:2(45)10.1061/(asce)0742-597x(1995)11:2(45
  9. Baldwin, J. R., Mathei, J. M., Rothbart, H., & Harris, R. B. (1971). Causes of Delay in the Construction Industry. Journal of Construction Division, 97(2), 177-187.10.1061/JCCEAZ.0000305
  10. Barker, R., Childerhouse, P., Naim, M., Masat, J., & Wilson, D. (2004). Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(2), 177-187. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(177)10.1061/(ASCE)0733-9364(2004)130:2(177
  11. Chang, A. S., Shen, F.-Y., & Ibbs, W. (2010). Design and construction coordination problems and planning for design-build project new users. Canadian Journal of Civil Engineering, 37(12), 1525-1534. https://doi.org/10.1139/l10-09010.1139/L10-090
  12. Deep, S., Singh, D., & Ahmad, S. A. (2017). A Review of Contract Awards to Lowest Bidder in Indian Construction Projects via Case Based Approach. Open Journal of Business and Management, 05(01), 159-168. https://doi.org/10.4236/ojbm.2017.5101510.4236/ojbm.2017.51015
  13. Dlakwa, M. M., & Culpin, M. F. (1990). Reasons for overrun in public sector construction projects in Nigeria. International Journal of Project Management, 8(4), 237-241. https://doi.org/10.1016/0263-7863(90)90032-710.1016/0263-7863(90)90032-7
  14. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. https://doi.org/10.1016/j.ijproman.2011.10.00410.1016/j.ijproman.2011.10.004
  15. Etges, B., Saurin, T. A., & Bulhões, I. R. (2012). “Identifying lean construction categories of practices in IGLC proceedings.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, Norway
  16. Gao, S. & Low, S. P. (2014). Lean Construction Management. http://dx.doi.org/10.1007/978-981-287-014-810.1007/978-981-287-014-8
  17. Gibson, G. E., Wang, Y.-R., Cho, C.-S., & Pappas, M. P. (2006). What Is Preproject Planning, Anyway? Journal of Management in Engineering, 22(1), 35-42. https://doi.org/10.1061/(asce)0742-597x(2006)22:1(35)10.1061/(asce)0742-597x(2006)22:1(35
  18. Gonzalez, V., Alarcon, L. F., & Mundaca, F. (2008). Investigating the relationship between planning reliability and project performance. Production Planning & Control, 19(5), 461-474. https://doi.org/10.1080/0953728080205902310.1080/09537280802059023
  19. Hanna, A. S., & Skiffington, M. A. (2010). Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Journal of Construction Engineering and Management, 136(2), 235-241. https://doi.org/10.1061/(asce)0733-9364(2010)136:2(235)10.1061/(asce)0733-9364(2010)136:2(235
  20. Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management, 18(3), 426-435. https://doi.org/10.3846/13923730.2012.69891310.3846/13923730.2012.698913
  21. LCI. (2013). “Lean project design and delivery in action.” Retrieved May 10, 2013, from http://www.leanconstruction.org/.
  22. LCI. (2014). “LCI lean project delivery glossary.” Retrieved May 12, 2014, from http://www.leanconstruction.org.
  23. LCI. (2015). “What is lean design and construction?” Retrieved May 20, 2015, from http://www.leanconstruction.org/.
  24. Lovejoy, V. A. (2004). Claims Schedule Development and Analysis: Collapsed As-built Schedule for Beginners. Cost Engineering Journal, AACE International, 46(1), 27-30.
  25. Lowsley, S., & Linnett, C. (2006). About Time: Delay Analysis in Construction. RICS Business Services Limited.
  26. Iyer, K. C., & Jha, K. N. (2006). Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Journal of Construction Engineering and Management, ASCE, 132(8), 871-881.10.1061/(ASCE)0733-9364(2006)132:8(871)
  27. Nesensohn, C., Demir, S. T., & Bryde, D. J. (2012). “Developing a ‘true north’ best practice lean company with navigational compass.” Proc., 20th Annual Conf. of the Int. Group for Lean Construction, International Group for Lean Construction (IGLC), Oslo, Norway.
  28. Thomas, H. R., & Ellis, R. D. (2007). Contractor Prebid Planning Principles. Journal of Construction Engineering and Management, 133(8), 542-552. https://doi.org/10.1061/(asce)0733-9364(2007)133:8(542)10.1061/(ASCE)0733-9364(2007)133:8(542)
  29. Yang, J.-B., & Wei, P.-R. (2010). Causes of Delay in the Planning and Design Phases for Construction Projects. Journal of Architectural Engineering, 16(2), 80-83. https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)10.1061/(asce)1076-0431(2010)16:2(80
  30. Yang, L.-R., Chen, J.-H., & Huang, C.-F. (2012). Requirements Definition and Management Practice to Improve Project Outcomes. Journal of Civil Engineering and Management, 18(1), 114-124. https://doi.org/10.3846/13923730.2012.65734010.3846/13923730.2012.657340
DOI: https://doi.org/10.1515/bjreecm-2017-0008 | Journal eISSN: 2255-9671 | Journal ISSN: 2255-9604
Language: English
Page range: 101 - 117
Published on: Nov 28, 2017
Published by: Riga Technical University
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2017 Shumank Deep, Mohd Asim, Mohd Kashif Khan, published by Riga Technical University
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.