Have a personal or library account? Click to login
Proposal of a performance measurement system model: overcoming effectiveness barriers Cover

Proposal of a performance measurement system model: overcoming effectiveness barriers

Open Access
|May 2025

References

  1. Bahri, M., St-Pierre, J., Sakka, O., 2017. Performance measurement and management for manufacturing SMEs: a financial statement-based system. Measuring Business Excellence, 21(1), 17–36. DOI: 10.1108/MBE-06-2015-0034
  2. Baird, K., 2017. The effectiveness of strategic performance measurement systems. International Journal of Productivity and Performance Management, 66(1), 3–21. DOI: 10.1108/IJPPM-06-2014-0086
  3. Behery, M., Jabeen, F., Parakandi, M., 2014. Adopting a contemporary performance management system: A fast-growth small-to-medium enterprise (FGSME) in the UAE. International Journal of Productivity and Performance Management, 63(1), 22–43. DOI: 10.1108/IJPPM-07-2012-0076
  4. Bititci, U., 2015. Managing business performance: The science and the art. John Wiley & Sons.
  5. Boone, H. N., Boone, D. A., 2012. Analyzing likert data. Journal of Extension, 50(2), 1–5.
  6. Carvalho, J. D., 2021. Melhoria Contínua nas Organizações. Lidel.
  7. Choong, K. K., 2014. Has this large number of performance measurement publications contributed to its better understanding? A systematic review for research and applications. International Journal of Production Research, 52(14), 4174–4197. DOI: 10.1080/00207543.2013.866285
  8. Cocca, P., Alberti, M., 2010. A framework to assess performance measurement systems in SMEs. International Journal of Productivity and Performance Management, 59(2), 186–200. DOI: 10.1108/17410401011014258
  9. Cunha, F., Dinis-Carvalho, J., Sousa, R. M., 2023. Performance Measurement Systems in Continuous Improvement Environments: Obstacles to Their Effectiveness. Sustainability (Switzerland), 15(1), 867. DOI: 10.3390/su15010867
  10. Cunha, F., Dinis-Carvalho, J., Sousa, R. M., 2024a. Assessment of Performance Measurement Systems’ Ability to Mitigate or Eliminate Typical Barriers Compromising Organisational Sustainability. Sustainability (Switzerland), 16(5), 2173. DOI: 10.3390/su16052173
  11. Cunha, F., Dinis-Carvalho, J., Sousa, R. M., 2024b. Key Characteristics of effective Performance Measurement Systems. Manuscript Submitted for Publication.
  12. Cunha, F., Dinis-Carvalho, J., Sousa, R. M., 2024c. Analysis of barriers for performance measurement system effectiveness in a company: perceptions across hierarchical levels. International Journal of Lean Six Sigma, Ahead of p(Ahead of print. DOI: 10.1108/IJLSS-12-2023-0205
  13. Fantozzi, I. C., Di Luozzo, S., Schiraldi, M. M., 2023. Industrial Performance Measurement Systems Coherence: A Comparative Analysis of Current Methodologies, Validation and Introduction to Key Activity Indicators. Applied Sciences (Switzerland), 13(1. DOI: 10.3390/app13010235
  14. Fitzgerald, L., Moon, P. (1996. Performance Measurement in Service Industries: Making It Work. CIMA Publishing.
  15. Franco-Santos, M., Kennerley, M., Micheli, P., Martinez, V., Mason, S., Marr, B., Gray, D., Neely, A., 2007. Towards a definition of a business performance measurement system. International Journal of Operations and Production Management, 27(8), 784–801. DOI: 10.1108/01443570710763778
  16. Franco-Santos, M., Lucianetti, L., Bourne, M., 2012. Contemporary performance measurement systems: A review of their consequences and a framework for research. Management Accounting Research, 23(2), 79–119. DOI: 10.1016/j.mar.2012.04.001
  17. Franco, M., Bourne, M., 2003. Factors that play a role in “managing through measures.” Management Decision, 41(8), 698–710. DOI: 10.1108/00251740310496215
  18. Gabris, G. T., 1986. Recognizing Management Technique Dysfunctions : How Management Tools Often Create More Problems than They Solve. Public Productivity Review, 10(2), 3–19. DOI: 10.2307/3380448
  19. Ghalayini, A. M., Noble, J. S., 1996. The changing basis of performance measurement. International Journal of Operations and Production Management, 16(8), 63–80. DOI: 10.1108/01443579610125787
  20. Gupta, S., Jain, S. K., 2013. A literature review of lean manufacturing. International Journal of Management Science and Engineering Management, 8(4), 241–249. DOI: 10.1080/17509653.2013.825074
  21. Hudson Smith, M., Smith, D., 2007. Implementing strategically aligned performance measurement in small firms. International Journal of Production Economics, 106(2), 393–408. DOI: 10.1016/j.ijpe.2006.07.011
  22. ISO/TC 184/SC5., 2014. ISO 22400-1:2014 Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management (Vol. 2014).
  23. Jonsson, P., Lesshammar, M., 1999. Evaluation and improvement of manufacturing performance measurement systems - the role of OEE Patrik Jonsson Magnus Lesshammar Article. International Journal of Operations & Production Management, 19(1), 55–78. http://dx.doi.org/10.1108/01443579910244223
  24. Joshi, A., Kale, S., Chandel, S., Pal, D., 2015. Likert Scale: Explored and Explained. British Journal of Applied Science & Technology, 7(4), 396–403. DOI: 10.9734/bjast/2015/14975
  25. Kennerley, M., Neely, A., 2002. A framework of the factors affecting the evolution of performance measurement systems. International Journal of Operations and Production Management, 22(11), 1222–1245. DOI: 10.1108/01443570210450293
  26. Kerzner, H., 2017. Project management metrics, KPIs and D dashboards: a guide to measuring and monitoring project performance (Third Edit). John Wiley & Sons.
  27. Langwerden, E. F., 2015. Performance Measurement System Development in SMEs : Testing & Refining The Circular Methodology. In 5Th IBA Bachelor Thesis Conference, July 2015, Enschede, Netherlands.
  28. Lee, K., Lee, S., 2023. Enhancing R&D Performance Management: A Case of R&D Projects in South Korea. Sustainability (Switzerland), 15(15), 1–14. DOI: 10.3390/su151511752
  29. Lehtinen, J., Ahola, T., 2010. Is performance measurement suitable for an extended enterprise? International Journal of Operations and Production Management, 30(2), 181–204. DOI: 10.1108/01443571011018707
  30. Malagueño, R., Lopez-Valeiras, E., Gomez-Conde, J., 2018. Balanced scorecard in SMEs: effects on innovation and financial performance. Small Business Economics, 51(1). DOI: 10.1007/s11187-017-9921-3
  31. McCunn, P., 1998. The Balanced Scorecard... The eleventh commandment. Management Accounting: Magazine for Chartered Management Accountants, 76(11), 34. DOI: Available: https://www.proquest.com/trade-journals/balanced-scorecard-eleventh-commandment/docview/195676560/se-2?accountid=39260.
  32. Meekings, A., 1995. Unlocking the potential of performance measurement: A practical implementation guide. Public Money & Management, 15(4), 5–12. DOI: 10.1080/09540969509387888
  33. Mettänen, P., 2005. Design and implementation of a performance measurement system for a research organization. Production Planning and Control, 16(2), 178–188. DOI: 10.1080/09537280512331333075
  34. Moher, D., Liberati, A., Tetzlaff, J., Altman, D. G., Group, T. P., 2009. Preferred Reporting Items for Systematic Reviews and Meta-Analyses: The PRISMA Statement. PLoS Med, 6(7). DOI: 10.1371/journal. pmed.1000097
  35. Munir, R., Baird, K., Si, Z., 2012. Associations with the use of multidimensional performance measures and the effectiveness of performance measurement systems. Asia-Pacific Management Accounting Journal, 7(2).
  36. Naslund, D., Norrman, A., 2019. A performance measurement system for change initiatives: An action research study from design to evaluation. Business Process Management Journal, 25(7), 1647–1672. DOI: 10.1108/BPMJ-11-2017-0309
  37. Neely, A., Bourne, M., 2000. Why Measurement Initiatives Fail. Measuring Business Excellence, 4, 3–7. DOI: 10.1108/13683040010362283
  38. Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Kennerley, M., 2000. Performance measurement system design : developing and testing a process-based approach. International Journal of Operations & Production Management, 20(10), 1119–1145.
  39. Pandis, N., 2016. The chi-square test. American Journal of Orthodontics and Dentofacial Orthopedics, 150(5), 898–899. DOI: 10.1016/j.ajodo.2016.08.009
  40. Pedersen, E. R. G., Sudzina, F., 2012. Which firms use measures?: Internal and external factors shaping the adoption of performance measurement systems in Danish firms. International Journal of Operations and Production Management, 32(1), 4–27. DOI: 10.1108/01443571211195718
  41. Saunders, M. N. K., Lewis, P., Thornhill, A., 2019. Research Methods for Business Students (Eight). Pearson.
  42. Schneiderman, A. M., 2013. Why Balanced Scorecards Fail. Journal of Strategic Performance Measurement.
  43. Striteska, M., Svoboda, O., 2012. Survey of performance measurement systems in Czech companies. E a M: Ekonomie a Management, 15(2).
  44. Stříteská, M., Zapletal, D., Jelínková, L., 2016. Performance management systems in Czech companies: Findings from a questionnaire survey. E a M: Ekonomie a Management, 19(4), 44–55. DOI: 10.15240/tul/001/2016-4-004
  45. Suwignjo, P., Bititci, U. S., Carrie, A. S., 2000. Quantitative Models for Performance Measurement System. International Journal of Production Economics, 64(1), 231–241. DOI: 10.1016/S0925-5273(99)00061-4
  46. Todorut, A. V., Bojinca, M., Tselentis, V., 2013. Using balanced scorecard for measuring excellence in SMEs. Recent Researches in Law Science and Finances.
  47. Tung, A., Baird, K., Schoch, H. P., 2011. Factors influencing the effectiveness of performance measurement systems. International Journal of Operations and Production Management, 31(12), 1287–1310. DOI: 10.1108/01443571111187457
  48. Ukko, J., Saunila, M., 2020. Understanding the practice of performance measurement in industrial collaboration: From design to implementation. Journal of Purchasing and Supply Management, 26(1). DOI: 10.1016/j.pursup.2019.02.001
  49. Wouters, M., Wilderom, C., 2008. Developing performance-measurement systems as enabling formalization: A longitudinal field study of a logistics department. Accounting, Organizations and Society, 33(4–5), 488–516. DOI: 10.1016/j.aos.2007.05.002
  50. Yang, G., Macnab, A., Yang, L., Fan, C., 2015. Developing performance measures and setting their targets for national research institutes based on strategy maps. Journal of Science and Technology Policy Management, 6(2), 165–186. DOI: 10.1108/JSTPM-12-2014-0042
  51. Zairi, M., 1994. Measuring performance for business results. Springer Science & Business Media. https://books.google.pt/books?id=VfD7CAAAQBAJ
  52. Ingaldi, M., Ulewicz, R., 2020. Problems with the Implementation of Industry 4.0 in Enterprises from the SME Sector. Sustainability, 12, 217. DOI: 10.3390/su12010217
  53. Sá, J., Carvalho, A., Fonseca, L., Santos, G., Dinis-Carvalho, J., 2023. Science Based Targets and the factors contributing to the sustainable development of an organisation from a Literature review to a conceptual model. Production Engineering Archives, 29(3), 241-253.DOI: 10.30657/pea.2023.29.28
  54. Voss, C.A., Tsikiktsis, N., Frohlich, M., 2002. Case research in operations management, International Journal of Operations & Production Management, 22, 195-219.
  55. Xu, X., Lu, Y., Vogel-Heuser, B., Wang, L., 2021. Industry 4.0 and Industry 5.0-Inception, conception and perception, Journal of Manufacturing Systems, 61, 530-535, DOI: 10.1016/j.jmsy.2021.10.006
DOI: https://doi.org/10.30657/pea.2025.31.25 | Journal eISSN: 2353-7779 | Journal ISSN: 2353-5156
Language: English
Page range: 247 - 265
Submitted on: Sep 26, 2024
Accepted on: Mar 19, 2025
Published on: May 27, 2025
Published by: Quality and Production Managers Association
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2025 Flávio Cunha, José Dinis-Carvalho, Rui M. Sousa, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution 4.0 License.