Have a personal or library account? Click to login
Workload Control in Flow Shops with Bottleneck Shifting and Process Time Variability Cover

Workload Control in Flow Shops with Bottleneck Shifting and Process Time Variability

Open Access
|Feb 2024

References

  1. Bertrand, J. W. M., van Ooijen, H. P. G., 2002.Workload based order release and productivity: A missing link. Production Planning and Control, 13(7), 665–678. DOI: 10.1080/0953728021000026276
  2. Betterton, C. E., Cox, J. F., 2009. Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. International Journal of Production Economics, 117(1), 66–79. DOI: 10.1016/j.ijpe.2008.08.050
  3. Betterton, C. E., Silver, S. J., 2012. Detecting bottlenecks in serial production lines - A focus on interdeparture time variance. International Journal of Production Research, 50(15), 4158–4174. DOI: 10.1080/00207543.2011.596847
  4. Breithaupt, J. W., Land, M., Nyhuis, P., 2002. The workload control concept: Theory and practical extensions of load oriented order release. Production Planning and Control, 13(7), 625–638. DOI: 10.1080/0953728021000026230
  5. Bullington, S. F., 2001. Factory Physics: Foundations Of Manufacturing Management, 2 Nd Edition, Wallace J. Hopp and Mark L. Spearman, Irwin Mcgraw-Hill, 2001, 720 PP., ISBN 0-256-24795-1, LIST: $96. Journal of Design and Manufacturing Automation, 1(3), 230–231. DOI: 10.1080/15320370108500206
  6. Chakravorty, S. S., 2001. An evaluation of the DBR control mechanism in a job shop environment. OMEGA, 29, 335–342. DOI: 10.1016/s0305-0483(01)00028-7
  7. Fernandes, N. O., Thürer, M., Silva, C., Carmo-Silva, S., 2017. Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release. International Journal of Production Economics, 194, 181–189. DOI: 10.1016/j.ijpe.2016.12.029
  8. Francas, D., Löhndorf, N., Minner, S., 2011. Machine and labor flexibility in manufacturing networks. International Journal of Production Economics, 131(1), 165–174. DOI: 10.1016/j.ijpe.2010.03.014
  9. Fredendall, L. D., Ojha, D., Wayne Patterson, J., 2010. Concerning the theory of workload control. European Journal of Operational Research, 201(1), 99–111. DOI: 10.1016/j.ejor.2009.02.003
  10. Gilland, W. G., 2002. A simulation study comparing performance of CONWIP and bottleneck-based release rules. Production Planning and Control, 13(2), 211–219. DOI: 10.1080/09537280110069784
  11. Huang, Y., 2017. Information architecture for effective Workload Control: an insight from a successful implementation. Production Planning and Control, 28(5), 351–366. DOI: 10.1080/09537287.2017.1288278
  12. Kadipasaoglu, S. N., Xiang, W., Hurley, S. F., Khumawala, B. M., 2000. A study on the effect of the extent and location of protective capacity in flow systems. International Journal of Production Economics, 63, 217-228. DOI: 10.1016/S0925-5273(99)00020-1.
  13. Kamble, S., Gunasekaran, A., Dhone, N. C., 2020. Industry 4.0 and lean manufacturing practices for sustainable organisational performance in Indian manufacturing companies. International Journal of Production Research, 58(5), 1319–1337. DOI: 10.1080/00207543.2019.1630772
  14. Kim, S., Roscoe Davis, K., Cox, J. F., 2003. An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios. Production Planning and Control, 14(1), 15–32. DOI: 10.1080/0953728021000039416
  15. Land, M., Gaalman, G., 1996. Workload Control Concepts in Job Shops: A critical assessment. International Journal of Production Economics, 46-47: 535–548, DOI: 10.1016/S0925-5273(96)00088-6
  16. Land, M. J., Gerard, Gaalman, J. C., 1998. The Performance of Workload Control Concepts in Job Shops: Improving the Release Method. International Journal of Production Economics, 56–57: 347–364. DOI: 10.1016/S0925-5273(98)00052-8
  17. Land, M. J., Stevenson, M., Thürer, M., Gaalman, G. J. C., 2015. Job shop control: In search of the key to delivery improvements. International Journal of Production Economics, 168, 257–266. DOI: 10.1016/j.ijpe.2015.07.007
  18. Land, M., Stevenson, M., Thürer, M., 2014. Integrating load-based order release and priority dispatching. International Journal of Production Research, 52(4), 1059–1073. DOI: 10.1080/00207543.2013.836614
  19. Lödding, H., Yu, K. W., Wiendahl, H. P., 2003. Decentralized WIP-oriented manufacturing control (DEWIP). Production Planning and Control, 14(1), 42–54. DOI: 10.1080/0953728021000078701
  20. Lu, H. L., Huang, G. Q., Yang, H. D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49(3), 647–669. DOI: 10.1080/00207540903524490
  21. Oosterman, B., Land, M., Gaalman, G., 2000. The Influence of Shop Characteristics on Workload Control. International Journal of Production Economics, 68 (1), 107–119. DOI: 10.1016/S0925-5273(99)00141-3.
  22. Prabhu, A., Raghunandana, K., Yogesh Pai, P., 2022. Bottleneck shifting in serial line production: An investigation with different order release methods. Materials Today: Proceedings, 52, 1714–1720. DOI: 10.1016/j.matpr.2021.11.337
  23. Renna, P., 2022. Workload Control Order Release With Controllable Processing Time Policies: An Assessment by Simulation. International Journal of Industrial Engineering and Management, 13(3), 194–205. DOI: 10.24867/IJIEM-2022-3-312
  24. Riezebos, J., Korte, G. J., Land, M. J., 2003. Improving a practical DBR buffering approach using Workload Control. International Journal of Production Research, 41(4), 699–712. DOI: 10.1080/0020754031000065485
  25. Soepenberg, G. D., Land, M. J., Gaalman, G. J. C., 2012. Workload control dynamics in practice. International Journal of Production Research, 50(2), 443–460. DOI: 10.1080/00207543.2010.539277
  26. Spearman, M. L., Woodruff, D. L., Hopp, W. J., 1990. CONWIP: A Pull Alternative to Kanban. International Journal of Production Research, 28(5), 879–894. DOI: 10.1080/00207549008942761
  27. Stevenson, M., Hendry, L. C., 2006. Aggregate load-oriented workload control: A review and a re-classification of a key approach. International Journal of Production Economics, 104(2), 676–693. DOI: 10.1016/j.ijpe.2005.05.022
  28. Thürer, M., Fernandes, N. O., Stevenson, M., Qu, T., 2017. On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation. International Journal of Production Research, 55(16), 4695–4711. DOI: 10.1080/00207543.2017.1281462
  29. Thürer, M., Qu, T., Stevenson, M., Li, C. D., Huang, G. Q., 2017. Deconstructing bottleneck shiftiness: the impact of bottleneck position on order release control in pure flow shops. Production Planning and Control, 28(15), 1223–1235. DOI: 10.1080/09537287.2017.1362486
  30. Thürer, M., Stevenson, M., 2018. Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation. International Journal of Production Economics, 197, 275–282. DOI: 10.1016/j.ijpe.2018.01.010
  31. Thürer, M., Stevenson, M., Land, M. J., 2016. On the integration of input and output control: Workload Control order release. International Journal of Production Economics, 174, 43–53. DOI: 10.1016/j.ijpe.2016.01.005
  32. Thürer, M., Stevenson, M., Land, M. J., Fredendall, L. D., 2019. On the combined effect of due date setting, order release, and output control: an assessment by simulation. International Journal of Production Research, 57(6), 1741–1755. DOI: 10.1080/00207543.2018.1504250
  33. Thürer, M., Stevenson, M., Protzman, C. W., 2016. Card-based production control: a review of the control mechanisms underpinning Kanban, Con-WIP, POLCA and COBACABANA systems. Production Planning and Control, 27(14), 1143–1157. DOI: 10.1080/09537287.2016.1188224
  34. Thürer, M., Stevenson, M., Silvaa, C., 2011. Three decades of workload control research: A systematic review of the literature. In International Journal of Production Research, 49(23), 6905–6935. DOI: 10.1080/00207543.2010.519000
  35. Thürer, M., Stevenson, M., Silva, C., Qu, T., 2017. Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation. International Journal of Production Economics, 188, 116–127. DOI: 10.1016/j.ijpe.2017.03.025
DOI: https://doi.org/10.30657/pea.2024.30.4 | Journal eISSN: 2353-7779 | Journal ISSN: 2353-5156
Language: English
Page range: 48 - 56
Submitted on: Apr 1, 2023
Accepted on: Nov 10, 2023
Published on: Feb 22, 2024
Published by: Quality and Production Managers Association
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2024 Aruna Prabhu, K Raghunandana, P Yogesh Pai, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution 4.0 License.